Loading…
Loading…
13,529 results • Best match
Soft Soap Barrels for Lubrication of Conveyor Chain at LPG Bottling Plants as per IS 7532 (Q3)
ASSEMBLED BOTTOM ROLLER FOR 2000MM CONVEYOR TRIPPER TRACK AS PER DRG. NO. DGM/CON/MII/7/2006
Conveyor Head Pulleys Rubber Lagging Works in Bagasse Yard at Pulp Mill - Mechanical in TNPL Unit - I
Dismantling and re-erection of screw conveyor in RB#3 at SRP-Mechanical in TNPL Unit-I
Supply Erection and commissioning of Microprocessor based belt Weigher system for Conveyor 65 in coal Jetty 2
SUPPLY AND ERECTION OF 30 DEGREE TROUGHING IDLER ROLLERS FOR 1000MM BELT WIDTH CONVEYOR 24A and 24B
Supply and Erection of 30 Degree Troughing Idler Frames with Rollers for 1000mm Belt Width Conveyor 24A
Procurement of Non Magnetic Pulleys with plummer blocks for Conveyor 2A/B and 3A/B 2 items
NCTPS I MII Circle ECHS Renovation of existing damaged corroded stringer channel in the conveyor BCN 5
Repair and maintenance works to conveyor 72 RCC pedestals West side of JT 21 in ECHS area
MTPS I CHP I Conveyor 7A 7B Carrying out cleaning of spillage coal cleaning of all equipment
Replacement of conveyor belts in HWFL and Bagasse yard at Pulp Mill Mech in TNPL Unit 1
AIR INTAKE FILTER ELEMENT FOR TRC 2507 COMPRESSOR TO KPC PART NO. 0960175250/ ELGI PART NO.00325520 Firm's offer : IR INTAKE FILTER ELEMENT FOR TRC 2507 COMPRESSOR TO ELGI PART NO.000325520
UNLOADER ASSEMBLY TO M/S.ELGI PART NO.A-070073/KPC DRG NO.096.00.563.50 FOR ELGI/KPC UPGRADED COMPRESSOR Firm's Offer : UNLOADER ASSEMBLY TO M/S.ELGI PART NO.A-070073 FOR ELGI UPGRADED COMPRESSOR. M
REVOLVING CENTRE MT-5 HAVING MAXIMUM LOAD CAPACITY OF 4400 LBS AND FOR OPERATING ON 2500 RPM SUITABLE FOR NH 26 LATHE MACHINE OF MAKE HMT
Lathe Machine as per IS 6893:1988 (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
SM461060185 - SUN GEAR -I, Z= 21, M= 16 FOR 1500 KW BUCKET WHEEL GEAR BOX AS PER DRG NO: SME-1830, SM461060186 - SUN GEAR-II, Z= 42, M= 20 FOR 1500 KW BUCKET WHEEL GEAR BOX AS PER DRAWING NO SME-1824 R, SM461060187 - PINION SHAFT-II (COUPLER GEAR) ... WHEEL GEARBOX AS ...
Adequacy Study for Revamp of compressor 206K3A/B at Catalytic Reforming Unit (CRU) at CPCL
MTPS I Mill Plant IV Complete overhauling of gearbox Mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly
for preventive and corrective maintenance during DLP at Wimco Nagar Depot for 1.Car body stand (15 ton) 2.Manual Pallet Truck 3.Portable Air compressor 4.HVLS Fans
MTPS I M II OAHS FAM PDFACS Attending Annual overhauling works in PLC switch gear panels modules breakers transformers Fly ash conveying air compressors
OIL RELIEF VALVE ASSY. TO ELGI PT.NO.A 07 0551/ KPC PT.NO.095.00256.50 , FOR UPGRADRD COMPRESSORS. Firm's Offer : ELGI PT.NO.A 07 0551 Make/Brand: ELGI
LP.CYLINDER (197MM DIA) TO ELGI PARTNO. 070304780 / KPC DRG. NO.095.00.404.51 FOR ELGI/KPC UPGRADED COMPRESSORS. Firm's offer: Same as above. Make Brand: Kirloskar
LP.CYLINDER (197MM DIA) TO ELGI PART NO. 070304780 / KPC DRG. NO. 095.00.404.51 FOR ELGI/KPC UPGRADED COMPRESSORS. Firm's Offer: Kirloskar make part No. 095.00.404.51
ECHP-I- Reconditioning of worn out various size idler rollers for Conveyor-17,19,43,45,46,47,BFD-8, BFD-9A 9B and RBFD 11
TTPS Mech II AHP Unit IV V Scrapper Conveyor Feeder Reconditioning of scrapper bars by metal filling in the wornout portion
Unit I - Overhauling of safety valves and High Pressure valves of Unit I Boiler during the year 2018-19
Cleaning of Ist pass - Furnace, II pass and Boiler structure by water washing, disposal of scrap, debris after overhaul, applying refractory at rear arch and final super heater during 2017-18 annual overhaul
M9447186073: PULL CORD SWITCH MODEL: SW-4030HL22 FOR CHP CONVEYOR, M9447186072: BELT SWAY SWITCH, MODEL SW-4026TL22 FOR CHP SYSTEM, M9447186074: CHP/AHP INSTT. : BELT TEAR SWITCH SW-4321H
MTPS I BM Unit III Boiler pressure parts AOH 2022 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works replacing damaged insulation in boi
KGTPS Overhauling of HP, IP and LP drums and Superheaters and CPH safety valves in HRSG system during Boilers license renewal in December 2020 at KGTPS Maruthur
Custom Bid for Services - Refractory application works in Resuction ducts and PF Burners and Oil Burners inside Furnace in Boilers of all the Seven Units of TPSII
Custom Bid for Services - CPCLS25479 ARC for Overhauling and IBR Certificate Renewal related jobs for Boilers/Steam Generators at CPCL Manali Similar Category Repair and Overhauling Service
CONVEYOR CHAIN, 60W LED DRIVERS, 60W LED CHIPS, SEALING UNIT SERVICING, SEALING UNIT HOSE, SOLENOID VALVES, NON-VEG MEALS, VEG MEALS, 2 INCH SEWEL JOINTS, 2 INCH SS LING O RING, 2 INCH MALE HOUSING O RING, ERC CABLE, DBC FACE O RING, DBC SEWEL O RING, DBC VALVE COUPLER O RING, ERC MALE BODY O RING, 425KG ACTUATOR, 425KG SRV SET, 425KG ACTUATOR O RING, 425KG QRC O RING, MAK4 CUC CARD DISPLAY, DELTA PLC DISPLAY, HYDROTESTING OF LOADING ARMS, SPLY OF SUPERVISOR FOR MECHANICAL WORKS, SPLY OF SUPERVISOR FOR WELDING AND FABR WORK
MTPS II ES Circle CI Division Boiler Mills and Fans area Annual overhauling works Releasing checking Calibration Recondition and refixing of CI equipments in Boiler Mills Fans area and servicing of hot PA damper actuator for coal mill A to H AOH 2021
MTPS I BM Unit II Boiler Pressure parts COH 2024 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM UNIT I Boiler Pressure parts AOH 2021 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
TTPS MechII BM Unit I Boiler Cleaning of I pass Furnace II pass and Boiler structure by water washing disposal of scrap debris after overhaul applying refractory at rear arch final super heater during the 20242025 overhaul
MTPS I BM Unit IV Boiler pressure parts AOH 2021 22 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works
MTPS I BM Unit III Boiler pressure parts AOH 2021 Disposal of Ash from Eco hoper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM Unit III Boiler Pressure parts AOH 2024 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit I Boiler pressure parts AOH 2025 Water Washing of Boiler Ist and IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil etc
MTPS I BM Unit IV Boiler Pressure parts AOH 2024 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit IV Boiler pressure parts AOH 2022 Disposal of Ash from Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM Unit IV Boiler pressure parts AOH 2023 Disposal of Ash from Eco hopper deflection slope rear arch room and boiler roof area and strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM Unit II Boiler pressure parts AOH 2023 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room boiler roof area strengthening of Eco hopper supports with new pipes and allied works
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc
MTPS I BM Unit I Boiler Pressure parts AOH 2026 Removal and refixing of Skin casing sheet and insulation for attending boiler 1st pass water wall tubes and 2nd pass steam cooled wall tube rectification works etc