Loading…
Loading…
13,534 results • Best match
MTPS I BM Unit I Boiler Pressure parts AOH 2026 Servicing of various size actuators and allied works
Design, Engineering, Procurement, Supply, Erection and Commissioning of Four (4) Utility Boiler (UB) each of capacity 165 TPH
MTPS I BM Unit III Boiler Pressure parts AOH 2026 Servicing of various size actuators and allied works
MTPS I BM Unit II Boiler pressure parts AOH 2019 Servicing of various size actuators and allied works
MTPS I BM Unit III Boiler Pressure parts COH 2019 Servicing of various size actuators and allied works
MTPS I BM Unit I Boiler Pressure Parts AOH 2019 Servicing of various size actuators and allied works
MTPS I BM Unit IV Boiler Pressure Parts AOH 2019 Servicing of various size actuators and allied works
Repair and Overhauling Service - Boiler bunker choke removal and cleaning; As per scope of work; No; Buyer Premises
Custom Bid for Services - Overhauling of Boiler Pressure Parts at NTECL Vallur Similar Category Repair and Overhauling Service
FUSED SAW FLUX. SUBMERGED ARC WELDING FLUX FOR BUTT JOINT WELDING OF BOILER WELDING AS PER WCPI-415
Replacement of coal transport pipelines and related works in Boiler#6 at Energy Mechanical in TNPL Unit-1
Custom Bid for Services - FBC BOILER 2 ID FAN 1 AND 2 CASING REPLACEMENT Similar Category Support Services
Custom Bid for Services - Damaged Boiler Auxiliary Structures Rectification and Replacement work in Stage1 Units of TPS II
Custom Bid for Services - FBC BOILER 1 ID FAN 1 AND 2 CASING REPLACEMENT Similar Category Support Services
SUPPLY FABRICATION DISMANTLING ERECTION OF SUPER HEATER COILS PRIMARY EXIT IN BOILER II T4134 DURING TAR 2021
Custom Bid for Services - Revamping of Pulverized Fuel Duct and PF burner limbs and core air boxes including supply of required plates in one of the mill in TPSII Boilers
Custom Bid for Services - Removal of insulation for conducting RLA study and Restoration after completion in Unit-2 & Unit-4 boilers of TPS-II Similar Category Repair and Overhauling Service
Supply, erection, testing and commissioning of 2 Nos. High Pressure Reciprocating Multi 3 stage Air compressors package complete at Kadamparai power house as per the technical specifications.
TTPS Mech II TM II Overhauling of various size of valves in Instrument and service Air Compressors and Air drier plant system of Units IV and V
SERVO SYSTEM HLP-N68, ENKLO HLP-68, BHARAT HYDROL HLPO-68, IBP EX.HD-68, PROTOMAC HLP-68 FOR USE ON COMPRESSORS. MAKE/BRAND: BALMEROL PROTOMAC HLP-68
Custom Bid for Services - CC011222 Engaging a Contractor for Annual Maintenance Contract AMC of Atlas Copco make Compressors for a period of three years at CPCL Manali
SS And SC Centre Lathe (all Geared) With Minimum Specification ( 1 ), Pillar Type Drilling Machine ( 1 ), Drilling Machine Bench ( 2 ), D.E. Pedestal Grinding Machine With Wheels Rough And Smooth ( 1 ), Transformer Welding Set - Continuous Welding Current, With All Accessories And Electrode Holder 60% Duty Cycle With Standard Accessories ( 1 ), ( 1 ), Cut Section Model For Pneumatic Components ( 1 ), Quantity Delivery Days Cut-section Models For Hydraulic Components ( 1 ), Solar Panel With Battery ( 1 ), Manual Motor Coil Winding Machine ( 1 ), Ceiling Fan Coil Winding Machine ( 1 ), Primary Current Injection Set ( 1 )
" FLANGE DOWN GRAVITY ROLL FOR MOULD ROOM CONVEYORS ( LENGTH -460MM) TO ITEM NO.1B AS PER RWF DRAWING NO.702070110120. NOTE: 1) MATERIAL TEST CERTIFICATE FROM NABL/GOVERNMENT AUTHORISED LABORATORY S
AOH kit for ELGI make RR20100 CG (M) compressor to ELGI Part No. 072490439 consisting of 29 items as per annexure enclosed. Firms Offer : AOH kit for ELGI make RR20100 CG (M) compressor to ELGI Part N
Unit I - Overhauling of load hangers of critical pipe lines and headers of Boiler during the annual overhaul in 2018-19
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler for the period from 01 04 2026 and upto 31 03 2027 or till the date of completion of entire quantity which ever comes earlier
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler for a period from 01 04 2025 to 31 03 2026 or till the date of completion of entire quantity which ever comes earlier
MTPS I BM Unit III Boiler pressure parts AOH 2021 Water Washing of complete boiler Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Reheater coil Overhauling of water wall soot blowers and LRSB and allied works
TTPS Mech II BM Unit IV Cleaning of I II Pass Boiler Structures from 0 metre to 56 metre elevation PRDS floor HWMP BFP room collection and disposal of fly ash debris etc from Unit IV Boiler Pressure parts area to debris yard
MTPS I BM Lift Operation of Boiler Lifts I to IV and attending routine maintenance and Minor repair works of Boiler Lift II and its accessories for 120 days from the date of commencement of works Phase I of the year 2022 23
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
NCTPS I ES Circle EM II Division SDn III Boiler Area Lighting section Carrying out time bound maintenance works for maintenance of lighting in Boiler and Mill areas of all three units and buildings and surrounding areas of FOPH DM Plant AHP chi
MTPS I BM Unit III Boiler pressure parts AOH 2023 Water Washing of boiler Ist IInd pass area Removal of heavy particle of soot deposited on Water wall tube Platen SH coil and Re heater coil Overhauling of water wall soot blowers etc
TTPS Mech II BM Unit V Drum inspection cleaning of drum internals doors, Overhauling of phosphate dozing system water washing and cleaning of I pass Furnace II pass Boiler structure by water jet in Unit V Boiler for the year 2021 2022
MTPS I BM Unit I Boiler pressure parts AOH 2024 Disposal of Ash from Pent house Eco hopper deflection slope rear arch room boiler roof area strengthening of Eco hopper supports with new pipes and arresting of ash leakage in pent house etc
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2024 to 31 03 2025
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for a period from 01 04 2023 to 31 03 2024
TTPS Mech II BM Unit IV Drum inspection cleaning of drum internals doors Overhauling of phosphate dozing system water washing and cleaning of I pass Furnace II pass Boiler structure by water jet in Unit IV Boiler for the year 2021 2022
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
TTPS Mech II BM Unit III Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2025 to 31 03 2026
TTPS Mech II BM Unit V Drum inspection cleaning of drum internals doors Overhauling of phosphate dozing system water washing and Cleaning of I pass Furnace II pass Boiler structure by water jet in Unit V Boiler for the year 2019 2020
MTPSII M II circle CHPII Effluent water carrying pipe line from Boiler Blow down sump to Central Monitoring Basin Rerouting the underground 150NB MS ERW pipe line from Boiler Blow down sump to CPU pipe rack MTPS-II to above ground Level
TTPS Mech II BM Unit I Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2024 to 31 03 2025.
TTPS Mech II BM Unit II Cleaning of I II Pass Boiler structures PRDS valves and pipe lines floor and disposal of fly ash debris etc from Boiler area to debris yard for the period from 01 04 2024 to 31 03 2025
TTPS MechII BM Unit IV Drum inspection cleaning of drum internals doors Overhauling of phosphate dozing system water washing and cleaning of I pass Furnace II pass Boiler structure by water jet in Unit IV Boiler during overhaul for the year 2023
NCTPS I ES Circle EM II Dn SD III Boiler Area Lighting section Carrying out Routine maintenance works for maintenance of adequate illumination in Boiler Mill and ESP SWGR area of all three units buildings and surrounding areas of FOPH DM plant
Unit I Routine maintenance and Break down maintenance of Boiler Water wall soot blower Long Retractable Soot Blower for the boiler having operating pressure of 178 Kg cm2 for the period of six months from the date of handing over of site
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in water wall area S panel area Water wall reducer tubes inter pass area steam cooled wall tubes and fin welding at Boiler Ist II nd pass area
TTPS Mech II BM Unit I to V Attending Boiler tube puncture in Unit I to V Boiler from the date of handing over of site to 31 03 2027 or till the date of completion of entire quantity whichever comes earlier
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Closed Body LCV Truck; 19 FT LCV, Goods Transport Service – Per KM Based Service - Machinery & Equipment; Open Body Taurus; 21 FT Truck, Goods Transport Service – Per KM Based ... - Machinery & ...