Loading…
Loading…
13,544 results • Best match
TTPS - ECHP-I - Attending Primary crusher house-I shift operation and allied works in 3 shifts such as inspection and operating the Primary crushers PC-1A 1B etc., at PCH-I
Supply and Erection of 30 Nos new screen plate with HT CSK Head bolt and nuts 2 Nos with washer M24 X 110mm 12 Nos for Primary Crusher 1A and 1B
ECHP-I- Strengthening of existing weld joints and replacement of worn out supporting angle with available good conditioned S.H M.S angles in Vibrex Screen 20B 20C at Secondary Crusher House-I
Sweeping and clearing of peripheral roads from West side of GLR 4 Raw Water Pump House 1 and Token Gate to Old Crusher House for the period from 01.04.2024 to 31.03.2025
Supply and Erection of TCT color bond Trapezoidal TRIMDEK profile and lexan polycarbonate roof sheet Embossed clear in four side of top portion of roofing sheets at Secondary Crusher House I
Goods Transport Service – Per KM Based Service - Machinery & Equipment; Low Bed Trailer; 40 to 80 FT Triple Excel
Goods Transport Service – Per KM Based Service - Machinery & Equipment; FLAT BED TRAILER; 40 to 80 FT Double Excel
Supply of machinery and equipment and to perform civil infrastructure works for manufacturing cosmetic products at Alathur factory
Goods Transport Service – Per MT per KM Based Service - Machinery & Equipment; Open Body Taurus; 16 TON OPEN BODY
Goods Transport Service – Per MT per KM Based Service - Machinery & Equipment; Open Body Taurus; 16 TON OPEN BODY
REPAIRS AND MAINTENANCE TO OF STP MACHINERY AND TREATED WATER PIPE LINE CONNECTED WORKS UNDER GE STM CHENNAI
Mechanized unloading and stacking of wood logs within mill premises using contractors own machinery at TNPL UNIT 1
Custom Bid for Services - Providing assistance for maintenance and allied works of field machinery equipments working in mineII
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Rates for 20ft Closed Vehicles; as mentioned in NIT
ECHPII Upkeepment of conveyors by cleaning the Coal, coal powder and foreign materials etc., on walk ways, return belt, deck sheets, head end floor and tail end areas of conveyor68 and cleaning, checking and round the clock
Design, Engineering, Manufacture, Supply, Fabrication, Delivery Transit Insurance Pipe conveyors and Sea water Intake, Blowdown and Other Pipelines from JTB3 to Pier P47 in the MoEF approved route in the CRZ area for Civil,Electrical,Mechanical Works
Custom Bid for Services - Hot vulcanising of belts and allied works in Conveyors & SME at Mine-I & IA (Additional work place at Mine-II) Similar Category Manpower Outsourcing Services - Man-days based Manpower Outsourcing Services - Minimum wage
O AHS BAHS Renewal of wornout Damaged End Collar Arm Guide Beam Side plate with Top Bottom Wings Plate in Band Elements for Drycon conveyor
PROVIDING CONCRETE FLOORING AT CHIPPER 1 AND 2 WCC AREA BELOW BC#5 CONVEYOR AND NORTH SIDE OF VAM AREA AT TNPL UNIT - II, TRICHY.
ttending flue gas leak from 27 mtr elevation to 44 mtr elevation in I pass and 36 mtr to 43 mtr elevation in II pass of unit IV Boiler during overhaul 2018 -19
FOR DESIGN,MANUFACTURING,TESTING, INSPECTION,SUPPLY,DELIVERY and SUPERVISION OF COMMISSIONING OF AUTOMATED EMPTY DRUM FEED CONVEYOR ARRANGEMENT FOR GREASE and BITUMINOUS LUBE DRUMS AND LUBE DRUMS FOR OUR IOCL- GRASSROOT OIL COMPLEX PROJECT AT CHENNA
MTPS 1 Mill Plant Unit II Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy mill gearbox bearings worn out roller and bull ring segment
Reconditioning of Electro Static Precipitator (ESP) Field # 1 and 2 in Power Boiler # 1 and 3 at Energy - Mechanical at TNPL Unit -1.
TTPS Mech II BM Full reconditioning of worn out coal nozzle tips to be used in Unit IV Boiler during 2023 2024 overhaul
TTPS Mech II BM Unit IV V Renewal of wornout damaged rubber lining work in phosphate dozing tank of Unit IV V boiler
TTPS Mech II BM Unit III Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2025 2026
TTPS Mech II BM Unit II Replacement of eroded Economizer coil assemblies in Unit II Boiler during overhaul for the year 2025 2026
TTPS Mech II BM Unit II Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2024 2025
MTPS I TM Unit III Inspection and Complete Overhauling of Voith Hydraulic Coupling of Boiler Feed Pump 3A during AOH of 2024 25
TTPS Mech II BM Unit III Overhauling of safety valves and High Pressure valves of Unit III Boiler during the year 2020 2021
TTPS Mech II BM Unit II Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2021 2022
Carrying out the process of Post operational chemical cleaning in Unit II Boiler of Mettur TPSI including cost of chemical and other consumables
Construction of RCC Chimney for 125 TPH Power Boiler under Revamping of the Steam and Power System (RSPS#2) at TNPL Unit I
TTPS Mech II BM Unit III Overhauling of safety valves and High Pressure valves of Unit III Boiler during the year 2024 2025
TTPS Mech II BM Unit II Overhauling of safety valves and High Pressure valves of Unit II Boiler during the year 2024 2025
TTPS Mech II BM Unit II Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2023 2024
TTPS Mech II BM Unit II Inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2024 2025
TTPS Mech II BM Unit III Inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2020 2021
TTPS Mech II BM Unit V Inspection overhauling and commissioning of actuators of high pressure valves in boiler during annual overhaul 2021 2022
TTPS Mech II BM Unit I Inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2024 2025
TTPS Mech II BM Unit V Inspection overhauling and commissioning of actuators of high pressure valves in boiler during annual overhaul 2019 20
NCTPS II 2 X 600 MW M I circle BM Division Unit II Boiler Reconditioning of coal nozzle tip released from Corner 3
NCTPS II 2 X 600 MW M I circle BM Division Unit II Boiler Reconditioning of coal nozzle tip released from Corner 4
TTPS ES Circle EM III Annual overhauling of various capacity of Boiler side LT motors in unit V for the year 2025 2026
TTPS MechII BM Unit I Reconditioning of coal nozzle and matching with coal nozzle tips for Unit I Boiler during 2024 2025 Overhaul
TTPS ES Circle EM II Rewinding of failed various capacity of LT motors in boiler area for Sub Division I EM II Division
TTPS MII BM Unit III Repairing of wornout skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2023 2024
TTPS Mech II BM Unit I Replacement of plugged Economizer coil assemblies in Unit I Boiler during overhaul for the year 2024 2025
TTPS Mech II BM Unit III Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2023 2024
TTPS MechII BM Unit I Repairing of wornout skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2023 2024