Loading…
Loading…
13,544 results • Best match
TTPS Mech II BM Unit III Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2023 2024
TTPS Mech II BM Unit III Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2024 2025
TTPS Mech II BM Unit IV Inspection overhauling and commissioning of actuators of high pressure valves in boiler during annual overhaul 2021 2022
NCTPS I ES Circle EM-II Dn S Dn Rewinding of various capacities of LT motor 04 Nos of Boiler Auxiliaries sub division.
TTPS MechII BM Unit IV Overhauling of Coaloil burner and its tilting mechanism of corner12in Unit IV Boiler during the year 2025 2026
TTPS Mech II BM Unit III Overhauling of safety valves and High Pressure valves of Unit III Boiler during the year 2019 2020
TTPS Mech II BM Unit I Overhauling of safety valves and High Pressure valves of Unit I Boiler during the year 2020 2021
Fabrication and erection of furnace bed drain pipelines and Sliding gate Assemblies in Boiler No.4 at energy Mechanical in TNPL Unit I
TTPS ES Circle EM III Annual overhauling of various capacity of Boiler side LT motors in unit IV for the year 2025 2026
TTPS Mech II BM Unit III Overhauling of safety valves and High Pressure valves of Unit III Boiler during the year 2025 2026
TTPS Mech II BM Unit II Overhauling of safety valves and High Pressure valves of Unit II Boiler during the year 2021 2022
TTPS Mech II BM Unit I Inspection overhauling and commissioning of actuators of high pressure valves in boiler during annual overhaul 2019 2020
TTPS Mech II BM Unit II Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2019 2020
Providing pressed clay tiles to the Security office roof and renovation of RCC structures in Boiler control room in TNPL Offsite at Kachirayapalayam
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective rear arch goose neck bends tubes and allied works
TTPS MechII BM Unit IV Reconditioning of coal nozzle and matching with coal nozzle tips for Unit IV Boiler during 2024 2025 Overhaul
TTPS Mech II BM IV V Overhauling of load hangers of critical pipe lines and headers of Boiler for the year 2022 23
TTPS ES Circle EM II Rewinding of failed various capacity of LT motors in boiler area for Sub Division I EM II Division
TTPS Mech II BM Unit I Overhauling of safety valves and High Pressure valves of Unit I Boiler during the year 2025 2026
Procurement of pump spares required for boiler feed water pumps (121-G01A/B/C) at COGEN/P and U-II in CPCL- Manali
TTPS Mech II TM I Unit I Inspection overhauling and commissioning of actuators of Boiler Feed water Deareator system valves during forthcoming overhaul
TTPS Mech II BM Unit I Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2025 2026
TTPS Mech II BM Unit I Replacement of plugged Economizer coil assemblies in Unit I Boiler during overhaul for the year 2025 2026
NCTPS I ES circle EM II Dn SD I Rewinding of various capacities of LT motor 10 Nos of Boiler Auxiliaries sub division
Fixing of insulation and GI Cladding sheet in the required area of pipe lines, I Pass, II Pass and Burner elevation of Boiler.
Removal of chocking in the catch pits in the Mill and Boiler areas and clearing the drains around the Power House of Units
MTPS I Boiler Rotating parts Units I and II Preventive and Breakdown maintenance Works and other allied works as and when required basis
Custom Bid for Services - Technical Support Services for Boiler and its auxiliaries at NNTPS Similar Category Manpower Outsourcing Services - Fixed Remuneration Support Services
Custom Bid for Services - Supply cum Application of LRB Mattress Insulation along with aluminium cladding in Boiler Turbine and ESP area at NTECL
Custom Bid for Services - BMC for Operation Assistance of Boiler and Turbine Auxiliaries and other Peripheral works for the period of Two years
Operation And Maintenance Of Other Machines And Plants - Biennial Maintenance Works of Boiler pressure parts and Auxiliaries including all rotating equipment in NNTPS
Customized AMC/CMC for Pre-owned Products - Boiler Lift; Techno Industries Private Limited; Comprehensive Maintenance Contract (CMC); As per Scope of work; No
Custom Bid for Services - Replacement and rectification of damaged Supporting Structures and Chequered plates in all 7 boiler areas from 0ML to 85ML
MAINTENANCE/ REPAIRS TO FIREFIGHTING EQUIPMENTS AND FIRE ALARM SYSTEM INSTALLED AT VARIOUS LOCATIONS, HANGER DOORS AND ROLLING SHUTTER MOTOR AND COMPRESSORS IN MK-54 AND STREET LIGHTS, FLOOD LIGHTS AND ETC AT ARAKKONAM
Supply, installation & Commissioning of Portable air Compressors 350 cfm min, 12 bar working pressure, Single stage compression max weight 150 kgs, should include a reservoir of 200 l, 3 HP max , as p
Spares for sullair compressors, model no: LS 20S 200L AC, 1. Pressure Regulator ( inlet valve), part no: 406929, qty - 02 nos, 2. Pressure Regulator kit for inlet valve 406929, part no: 041742, qty -
Set of Standard items for ELGI Make RR20100 CG (M) Compressors, set consist of 7 items 09 Nos. as per annexure. Note: Firm should submit authorised dealership certificate along with tender. FIRM'S OFF
Supply and Commissioning of Screw Compressors: (a) Capacity 26.1 cfm and Working Pressure 7 kg/cm2 with Vertical Air Receiver 500 Ltrs, Quantity: 09 (Nine) Nos. (b) Capacity 26.1 cfm and Working Press
Spares for Atlas Copco Compressors, Model no; G7FF,G11FF. 1. Oil Filter (1513033701), Part no: 2903033701, qty - 02 nos, 2. Oil Separator(1622087100), Part no: 2903087100, qty - 02 nos, 3. Oil RIF Ind
Supply, Installation & Commissioning of Portable air Compressors 350 cfm min, 12 bar working pressure, Single stage compression max weight 150 kgs, should include a reservoir of 200 l, 3 HP max as per
TTPS Operation Circle MPM II ACP Stage I, II and III Attending break down works in AC plant Unit I to V, switch yard compressors etc., for a period from 08.10.18 to 31.03.19.
TTPS Operation Circle MPM II ACP Stage I, II and III Attending break down works in AC plant Unit I to V, switch yard compressors etc., for a period from 08.04.18 to 30.09.18
TTPS Operation Circle MPM II ACP Stage I, II and III Attending break down works in AC plant Unit I to V, switch yard compressors etc., for a period from 08.04.19 to 30.09.19.
TTPS Operation Circle MPM II ACP Stage I, II and III Attending break down works in AC plant Unit I to V, switch yard compressors etc. for a period from 08.10.19 to 31.03.20
Custom Bid for Services - CPCLH24219 Annual Rate Contract for Chemical Cleaning of Inter Coolers and After coolers of Instrument Air compressors in Plant 222 Plant 227 and Plant 232 at Refinery3 CPCL Manali
Customized AMC/CMC for Pre-owned Products - Biennial maintenance contract of Atlas copco air compressors in TPS- II Expn; Atlas Copco (India) Ltd; Annual Maintenance Contract (AMC); As per scope of work; No
Assets Insurance Service - Contractor Plant and Machinery Insurance Policy; Storm, Typhoon, Hurricane, Tornado, Flood and Inundation (STFI) Cover, Earthquake Cover, Fire Lightning and allied perils STFI Storm Tempest Flood and Inundation RSMD Riot St..
TTPS Mech II TM II Transport section Carrying out the cleaning of the Transport office premises Bus Garage compressor car washer room Ramp and tools room at Camp I and other minor repair works pertaining to compressor car washer carrying out mino
Certain specified works to be carried out in different locations of unit V boiler in CRH, HRH, water wall hanger, water wall screen and extended water walls etc., during annual overhaul for the year 2018 - 19
REPAIR MAINT OF CENTRAL AC PLANT COMPRESSOR COOLING APPLIANCE VARIOUS TYPES OF ACs AND OTHER MISC E M WORKS AT AFS SULUR