Loading…
Loading…
13,544 results • Best match
TTPS Mech II TM I Break down works in boiler feed water system stator water Primary and Secondary pumps Hydrogen Cooler booster pumps chemical dosing pumps and connected cooling water lines in Unit I II III for the period of work on
TTPS Mech II BM Unit III Boiler Painting of the safety valve exhaust pipes its silencers CST tank and Hot well make up pump water lines OHS platform structures during the overhaul 2019 2020
MTPS I BM Unit II Boiler pressure parts AOH 2019 Overhauling of secondary air dampers Scanner Air fans and its damper flap gate Reconditioning of damaged wind box compartment dampers guide plates insulation etc
Provinding New 3HP Submersible motor by Replacing the Compressor unit existing borewell at Chellandiammandurai Public Toilet in ward no.45
Reconditioning of Hydraulic pump P 30 S B2 released from 48B Conveyor of Additional coal Handling System by dismantling all internal components of the hydraulic pump and changing damaged worn out parts including cost of materials consumables
Reconditioning of Hydraulic pump P 30 S B1 released from 48B Conveyor of Additional coal Handling System by dismantling all internal components of the hydraulic pump and changing damaged worn out parts including cost of materials consumables
NCTPS I SE M II Circle ECHS Dn Strengthening of existing severely damaged corroded boom conveyor structures MCC room and operator cabin in Stacker 1B
Supply of 1800mm Belt width 800 KN per M 5 ply 5 mm top cover 3mm bottom cover FR grade Nylon to Nylon conveyor belt
ICHP- Routine cleaning and greasing of plummer blocks, resilient couplings and tripper wheels of Conveyor-49,54,50,50A, 56,57,57A, 58A and B, 59A and B, 74 etc.,
ECHP-I- Attending preventive and breakdown maintenance of electrically operated 10 Nos. Hoist in SCH-I, PCH-I, Conveyor-17 head end and tail end.
E-Tender with Forward bidding for various scraps like M.S, Cast Iron, Bearing, Rubber, Cable, Brass, Aluminum, S.S., waste Oil, Empty Barrels, Conveyor Belt, Etc.,
ECHP-II- Dismantling and renewal of existing worn out support I beam, tripper chute floor and walkways structures in Conveyor-68 by NEW SH materials
SUPPLY AND ERECTION OF GALVALUME SHEETS OF THICKNESS NOT LESS THAN 0.8 MM FOR ROOFING CONFORMING TO IS14246 IN CONVEYOR 73 ON BOTH WALKWAY SIDES
ICHP- Attending preventive and breakdown maintenance of 10 Nos. electrically operated hoists on various locations of Station AB Conveyor (26AB, 28B, 58AB head end, 56,57,49,54,74
HOLD BACK ASSEMBLY FOR CONVEYOR 4 A B SUITABLE FOR ELECON MAKE GEAR RECLAIMER I II AND STACKER I II RUNNING WITH HOLD BACK ASSEMBLY
MTPS I CHP II Segregation of rubber material coir polyurethane bags stones iron piece other foreign materials etc from coal in conveyor 9A and 9B
Finishing of cut sheets, packing and labeling at Pasaban Cutter and broke handling and other related works in Pasaban Cutter, Paper Machine3 Conveyor and pulper
NCTPSI SEMII Circle ECHS Dn Overhauling and reconditioning of wornoutfailed rotating assembly complete for Fluidomat fluid coupling model SC12 released from the conveyor BCN 57
MTPS I CHP I Cleaning of spilled coal from Conveyor 1to4 Belt Feeder floor 1to4 and inspection rectification of coal transfer chutes skirt board etc
Supply and instalation of Shedding Machine Conveyor belt and other additional works to MCC at Metro Classic City Zone IV in Tambaram City Municipal Corporation
MTPS I CHP I Carrying out fabrication and cold vulcanizing of joint and patch vulcanizing in 1400mm 1600mm 1800mm and 2000 mm width conveyor belts
MTPS II M II Circle CHP II Fire Protection System Rerouting of leaking underground Hydrant pipe near Conveyor #7 of CHP area of MTPS II
MTPS I CHP I Carrying out fabrication and cold vulcanizing of joint and patch vulcanizing in 1400mm 1600mm 1800mm and 2000 mm width conveyor belts
NCTPS I SE M II Circle ICHS Dn S and R Overhauling of worn out 570 PST Fluid Coupling released from conveyor 5B of ICHS
Structurals changing work in Loose bagasse Feeding Conveyor 49, Reclaim coveyor 23 and 25 in Bagasse yard at Pulp Mill - Mechanical in TNPL Unit I
MTPS I CHP I Attending Routine and minor break down maintenance in conveyor 6A and 6B and in belt feeder 6A and 6B tunnel area
Adhesive Solution For Conveyor Belt-IS2561 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No
Removing Bushes and Silt by Deploying Poclain Earth Moving Machinery at Sabari Odai in ward no 58 59
Removing Bushes and Silt by Deploying Poclain Earth Moving Machinery at Kovil Vazhi Odai in ward no 60
MTPS I CA CWS II Overhauling of 1600 mm BFV including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal Painting of Intake Screens of CWP 4A 4B 4C of Unit IV during AOH 2023 24
MTPS I CA CWS II Overhauling of 1600 mm BFV including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal Painting of Intake Screens of CWP 3A 3B 3C of Unit III during AOH 2023 24
MTPS1 Mill Plant Unit III Attending the break down Preventive maintenance works such as overhauling of journal and spring assemblies replacement of mechanical face seal assy and mill gearbox bearings worn out roller and bull ring etc
MTPS I Mill Plant I Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly etc in Mills 1A to 1F during AOH 2024 25
MTPS I Mill Plant II Complete overhauling of gearbox mechanical face seal assembly worm shaft assembly replacing the worn out bulged insulation cover plate assembly scrapper assembly and worn out flexi coupling etc Releasing the journal spring
NCTPS I SE MI Circle R M 25 26 TM Dn Retubing of defective Intercooler after cooler tube nest and fabrication of new outer shell for Instrument Service air compressor in Unit I II III during the year 2025 26
Swivel Tube assembly and Clevis Bracket assembly for water wall soot blowers suitable for Unit I and II 600 MW Boiler
Rectification of Freight Cum Passenger Lift No I Sl No EL 1622 in boiler area of Unit I II and III
Please check the tender Documents carefully and quote your rates accordingly for the Supply, Fabrication, Fixing of Conveyor soap tray protection guard system at Madurai LPG Plant . Overall GST on quoted rate should be 18% and in case of any deviations his/her bid will be disqualified.
MTPS I BM Unit III Boiler COH 2019 Arresting the air ingress ash leakage in Ist pass Penthouse area with an advanced ceramic fiber sealing system and allied works
Supply, Fitment and Commissioning of AUXILIARY SLIDE for Power Chuck of Vertical Turret Lathe machine at UBLS/Hubli as per the attached Drawing no. SWR-UBLS-M&P-5646 to material Spec EN-24, Hardness 5
MTPS I BM Unit IV Boiler Pressure Parts AOH 2019 Reconditioning of worn out damaged fin welding Renewal reconditioning of header shield plates etc
Tender for the procurement of Hot end sector plate assembly, Cold end gratings and Worthington hub of air pre heater of 600MW Boiler
MTPS I BM Unit II Boiler pressure parts AOH 2021 Overhauling of secondary air dampers scanner air fans and its damper flap gate
procurement of Radial, Axial and Bypass Seals for Air preheater 1A and 1B of Model 32.5 VIMT 200072oPA for Unit I 600MW Boiler
TTPS Operation Circle OE II Maintenance of Fire Alarm System such as Smoke detectors, Heat detectors Manual Call Points and Linear Heat Detection Cables for Conveyors for the period from the date of entrusting the work upto 31.03.2022
MTPS II CHP I Operation of Wagon Tippler 5 6 Apron Feeder 5 6 Conveyor 1 A 1 B at Transfer House Transfer House 1 Conveyor 2A 2B at PCH Reversible Belt Feeder 1 2 at PCH Rotary Breaker 1 2 at PCH Belt Feeder 1 2 at PCH Flap Gate 3 4 at PCH Reject
Custom Bid for Services - Supply cum Application of LRB Mattress Insulation along with Aluminium Cladding in Boiler APHs, Ducts and ESP Area Similar Category Operation and Maintenance Power House/Power Plant
ECHP-II- Shifting and replacement of Secondary Crusher-1B HT motor by the spare motor including transporting of motor and alignment works etc., Kirloskar make, 820 KW, 6.6KV, 1483 RPM, Sl.No.39008032
ECHP-I- Replacement of complete worn out damaged asbestos roofing sheet and erection of new colour coated M.S roofing sheet inside portions of 7th floor roofing structure at Secondary Crusher House-I
BOILER FEED PUMP (BFP) FULL SS STRAINER ELEMENT TO SUIT SUCTION CONICAL STRAINER 16" NB 300# (Q3), BP INLET FULL SS BASKET STRAINER ELEMENT (Q3), CEP INLET FULL SS BASKET STRAINER ELEMENT (Q3)