Loading…
Loading…
13,544 results • Best match
Construction of boiler room with chimney bed, toilet block,providing paver block road for dairy value added product complex building at Thirukkanurpatti, Thanjavur District.
TTPS Mech II BM Unit II Boiler Painting of the safety valve exhaust pipes its silencers and CST tank during the overhaul 2021 2022
TTPS MII BM Unit IV Inspection overhauling and commissioning of actuators of high pressure valves in boiler during overhaul for the year 2023 2024
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Disposal of Ash from Eco hopper deflection slope rear arch room and allied works
TTPS Mech II BM Unit I Reconditioning of coal nozzle and matching with coal nozzle tips for Unit I Boiler during 2021 2022 Overhaul
TTPS Mech II BM Unit I III Inspection overhauling and commissioning of actuators of high pressure valves in boiler during the overhaul 2021 2022
TTPS Mech II BM Unit I Overhauling of load hangers of critical pipe lines and headers of Boiler during the overhaul in 2020 2021
MTPS I TM Reconditioning of 1 No defective Cartridge of Boiler Feed Pump Model FK6D 30 Cartridge No P 85020 released from BFP 2A
TTPS Mech II BM Unit I III Overhauling of load hangers of critical pipe lines headers of Boiler during the overhaul in 2021 2022
MTPS I BM Unit IV Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
Conducting Feasibility Study for Conversion of any one of old Power Boiler1, 2 and 3 into Agro Fuel Fired Boiler at TNPL Unit I
MTPS I BM Unit II Boiler Pressure parts AOH 2022 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS Mech II BM Unit II Reconditioning of coal nozzle and matching with coal nozzle tips for Unit II Boiler during 2023 2024 Overhaul
MTPS I BM Unit II Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS Mech II BM Unit V Overhauling of load hangers of critical pipe lines headers of Boiler during the annual overhaul in 2021 2022
MTPS I BM Unit I Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS MechII BM Unt V Reconditioning of coal nozzle and matching with coal nozzle tips released from Unit V Boiler during 2025 2026 Overhaul
TTPS Mech II AHP Unit V BAH Repairing reconditioning replacing of BAH Feed gates tip plate boiler seal plate during annual overhaul 2019 20
MTPS I BM Unit IV Boiler Pressure parts AOH 2024 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS Mech II BM Unit III Repairing of wornout skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2024 2025
MTPS I BM Unit III Boiler Pressure parts AOH 2021 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit II Boiler Pressure Parts AOH 2020 Tube thickness survey Water wall buffing providing platform Renewal of shrouding and allied works
TTPS Mech II TM I Unit I Inspection overhauling and commissioning of actuators of Boiler Feed water Deareator system valves during the forthcoming overhaul
MTPS I BM Unit IV Boiler Pressure parts AOH 2025 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit IV Boiler Pressure parts AOH 2022 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS Mech II BM Unit IV Overhauling of load hangers of critical pipe lines headers of Boiler during the annual overhaul in 2021 2022
TTPS Mech II BM Unit III Reconditioning of coal nozzle and matching with coal nozzle tips for Unit III Boiler during 2022 2023 Overhaul
Carrying out the process of Post-operational chemical cleaning in Unit#II Boiler of Mettur TPS-I including cost of chemical and other consumables.
Supply of LTSH Coil Assembly for Renewal Rectification of UnitII Boiler during the AOH Break during the AOH Break down Long shutdown of Unit
TTPS Mech II BM Unit III Repairing of wornout skin casing inside the doghouse and coutant bottom area in boiler during overhaul 2019 2020
TTPS Mech II BM Unit IV Overhauling of load hangers of critical pipe lines headers of Boiler during overhaul for the year 2025 2026
TTPS MII AHP Unit IV BAH Repairing reconditioning and replacing of BA hopper Feed gates tip plate boiler seal plate during the forthcoming overhaul
MTPS I BM Unit I Boiler Pressure parts AOH 2024 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit III Boiler pressure parts AOH 2025 Overhauling of Secondary Air Dampers Scanner Air Fans and its damper flap gate etc
MTPS I BM Unit I Boiler Pressure parts AOH 2025 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
Service Contract for Outsourcing of Real Time Radiography Testing of Straight Tube Butt Weld Joints in Boiler and Pressure Vessel components at BHEL-Trichy.
NCTPS II 2 X 600 MW M I circle BM Division Unit II Boiler Reconditioning of coal nozzle tip released from Corner 2 of
Design Manufacturing Supply of Tubes and Bends for Hot Re heater Coils 31 to 59 for renewal and repair works in Unit II boiler
MTPS I BM Unit III Boiler Pressure parts AOH 2025 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit II Boiler Pressure parts COH 2024 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I TM Reconditioning of 1 No defective cartridge of Boiler Feed Pump Model FK6D 30 Cartridge No P 86084 released from BFP 4A
MTPS I BM Unit III Boiler Pressure parts AOH 2024 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
TTPS Mech II BM Unit I Overhauling of load hangers of critical pipe lines and headers of Boiler during the overhaul in 2019 2020
Design Manufacturing Supply of tubes and bends for Hot Re Heater inlet T22 portion suitable for coils 1 to 30 for Unit I Boiler
Supply of Spares for ERV Super heater safety Valve soot blower and Burner elevation steam trip valve in Unit I II and III Boiler
Replacement of Air nozzles, Coal Nozzles, coal Nozzle caps and repairing of Economiser sacrificing tube in Boiler # 5 at Energy Mechanical TNPL Unit 1
TTPS Mech II BM Unit III Replacement of damaged hydrogen embrittled platen water wall tubes bends in header 1 4 of Unit III Boiler
TTPS Mech II BM Unit V Overhauling of load hangers of critical pipe lines headers of Boiler during overhaul for the year 2025 2026
MTPS I BM Unit III Boiler Pressure parts AOH 2023 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
MTPS I BM Unit II Boiler Pressure parts AOH 2021 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works