Loading…
Loading…
13,550 results • Best match
Set of wire rope assembly for 3 phase loco compressors, set consists of 2 items as given below: 1) 8mm dia galvanized steel wire rope (IS 2266-2002 core galvanized (a) In 4.6 meters length - 1 No/Set
Customized AMC/CMC for Pre-owned Products - Non Comprehensive BMC for servicing of Dry ash system air compressors for the year 2025 to 27 in TPS II; Thermal Power Plant; Annual Maintenance Contract (AMC); As per Scope; Yes
Repair and Overhauling Service - 18 Monthly Underwater and Other Machinery Routines of ICGS C-432; ICGS C-432; No; Service Provider Premises
Construction Of 1mt/Hr Capacity Seed Processing Machinery Shed With 100 Mt Capacity Seed Storage Godown At Nagamangalam Ssf In Mayiladuthurai District
Removal and Conveyance of Seemai Karuvelam Tree in Water bodies and Natham Poramboke area and Poclain Machinery at Tractor in Municipal limit.
Dismantling and removal of plant and machinery of Unit-1, 2, 3, 4 and 5 of Ennore Thermal Power Station, Chennai-57
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Rates for 20ft Closed Vehicle with Air Suspension Facility; as mentioned in NIT
Goods Transport Service – Per Trip based Service - Spares of Machinery; 40FT trailer to transport 40ft container; 40FT trailer to transport 40ft container
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Lumpsum rates of suitable Vehicles; as per the Dimensions mentioned in the NIT
Repair and Overhauling Service - 18 M UWR and Others Machinery routines of ICGS C-440 (R-4); C-440; No; Buyer Premises
MTPS I CA CWS II Unit IV Overhauling of 1600 mm BFV in CWP discharge line including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal and painting of Intake Screens of CWPs 4A 4B and 4C during AOH 2025 26
MTPS I CA CWS II Unit III Overhauling of 1600 mm BFV in CWP discharge line including Actuator Gearbox Overhauling checking renewal of Nitrile rubber seal Replacement of eroded corroded portion of bolt fixing area in Intake Screens of CWPs 3A 3B 3C
MTPS I CA CWS II MTPS CA CWS II Overhauling of 1600 mm BFV including Actuator Gearbox Overhauling checking and renewal of Nitrile rubber seal and Painting of Intake Screens of CWP 4A 4B and 4C of Unit IV during AOH 2021 22
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Rate Sch LM02, Weight Slab More than 1 MT up to 3 MTs: Collection of Speed Cargo consignments from various areas of BHEL Trichy, tptn and dely of components to Speed Cargo god..
M9467506039, M9467506040, M9467506041, M9467506042, M9467506043, M9490206003, M9418306064N, M9418306058N
TTPS MechII BM Unit IV Certain specified works to be carried out in different locations of unit IV boilers in Water Wall CRH HRH water wall hanger water wall screen and extended water walls etc during overhaul for the year 2023 2024
TTPS MechII BM Unit IV Certain specified works to be carried out in different locations of unit IV boilers in Water Wall CRH HRH water wall hanger water wall screen and extended water walls etc during overhaul for the year 2025 2026
TTPS Mech II BM Unit V Certain specified works to be carried out in different locations of unit V boilers in Water Wall CRH HRH water wall hanger water wall screen and extended water walls etc during overhaul for the year 2025 2026
TTPS Mech II BM Unit V Certain specified works to be carried out in different locations of unit V boilers in Water Wall CRH HRH water wall hanger water wall screen and extended water walls etc during overhaul for the year 2024 2025
TTPS Mech II BM Unit IV Certain specified works to be carried out in different locations of unit IV boilers in Water Wall CRH HRH water wall hanger water wall screen and extended water walls etc during overhaul for the year 2024 2025
Repair and Overhauling Service - BMC Works on Renewal of Beater wheels and connected works in mill system and PF Duct Maintenance Works in Boilers of Stage I Units of TPS II for the year 2026 to28; Thermal power Plant; No; Buyer Premises
ENGINEERING STATION SUITABLE FOR BWES, CONVEYORS AND CENTRAL MONITORING CONTROL STATION
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III Overhauling rectification of boiler safety valves ERV spray station valves HP LP hand operated valves and safety valves floating during Annual overhaul 2024 25
TTPS Mech II BM Unit I Boiler Attending patchup works in the air ingress area of the pent house and repairing the crown plates seal plates around the intersection of various headers in pent house during the 2019 2020 overhaul
NCTPS I SE MI circle R M 23 24 MPM Dn Unit II Reconditioning of badly eroded portion of cast steel 45 bend in boiler corners
Replacing of wornout 150 NB MS ERW Pipelines for Vacuum pump A tubular heat exchanger inlet and outlet lines, 80 NB MS ERW pipe for OLTCS inlet and outlet lines, providing platform lladder structurals Lifting frames for Accumulator bladders of TDB
SC110460649-TOP SP WSHR ASSY-7010-1740WD FOR MS SV, SC110460650-BOT SP WASHER-7010-1740WD FOR MS SV, SC110460004-GUIDE-7010-1740WD FOR MS SV, SC110460653-SEAT BUSHING-7501 -1538VX-10W FOR MS SV, SC110460655-PILOT STEM-7506 -1538VX-10W FOR MS SV, SC110460656-PIL.SEAT BUSHNG-7506 -1538VX-10W FOR MS SV, SC110460715-PILOT VALVE GASKET - SEATBUSHING-7506, SC110460716-PILOT VALVE GASKET - SOLENOID PLUNGER- 7506, SC110460016-Pilot valve Seat Bushing-7506, SC110460018-Pilot valve Stem-7506, SC110460019-Pilot valve Disc-7506, SC110460020-Main valve C-Seal-7501, SC110460276-Main valve Seat bushing- 7501, SC110460022-Main valve Disc-7501, SC110460703- MAIN VALVE GUIDE-7501, SC110460704-MAIN VALVE STOP WASHER-7501, SC110460061-Gasket -Solenoid Plunger, SC110460043-Adjustment ring pin-7001, SC110460054- Disc-7003 for 1786WE and 1786WB, SC110460651-GUIDE- 7012 -1786WE-6X8 FOR HRH SV, SC110460657-P.SEAT BUSHING-7520 -1525VX FOR HRH SV, SC110460658-SEAL RING -P-NO.1889801-7520 -1525VX, SC110460692-DISK HOLDER-7012, SC110460693-DISK COLLAR-7002, SC110460695-OVERLAP COLLAR-7003, SC110460697-LOCK NUT-7000, SC110460682-DISK HOLDER-7003, SC110460685-OVERLAP COLLAR-7081, SC110460652- GUIDE-7081 -1786WB-6X10 FOR CRH SV, SC110460684- LIFT STOP-7003, SC110460012-Main Spring -P-No. 4125101-7520 for 1525VX, SC110460013-Disc main-7520 for 1525VX, SC110460023-Piston ring-7520 for 1525VX, SC110460024-Seat ring-7520 for 1525VX, SC110460025- Pilot Disc-7520 for 1525VX, SC110460026-Pilot Stem-7520 for 1525VX, SC110460027-Pilot Seat Bushing-7520 for 1525VX, SC110460031-Spring Pilot-7520 for 1525VX, SC110460718-GUIDE-M- 7520, SC110460719-SEAL RING RETNR.-7520, SC110460720-PILOT DISC GUIDE-7520, SC110460726-LEVER PIN-7501, SC110460727-WASHER- 7501, SC110460729-SPLIT PIN-2.2x19.1 -SS-7501, SC110460730-GASKET-D-P.3831017-7520, SC110460731- GASKET-ERV - IGV-7520, SC110460659-SV 1811LC6X20 FOR SOOT BLOWER SV, SC110470037-Flexible wedge assembly for ASV-35-37-47 and 64, SC110470039-SW Gasket for ASV-35-37-47 and 64, SC110471635-SW gasket for ASV-36, SC110471636-SW Gasket for ASV-36 - 426x402x4.5, SC110470046-Flexible wedge assembly for ASV-48-50-61 and 63, SC110470048-SW Gasket for ASV- 48-50-61 and 63, SC110470053-SI gasket for ASV-51, SC110470054-SW gasket for ASV-51, SC110471637-S 96 Complete Valve assembly - MIV, SC110470100-S148 Complete valve assembly - MOV, SC110470215-Valve Assembly for S30, ST010080092-Burner pleated panel, CS010020136-SECTOR PLATE ASSEMBLY-HOT END, CS010020135-AXIAL SEAL PLATE ASSEMBLY WITH ADJUSTORS, ST010360011-AXIAL SEAL PLATE TO SECTOR PLATE, ST010360007-BYPASS SEAL BAR ASSEMBLY -HOT END, ST010360012-FLANGES NEAR TO SECTOR PLATE, ST010360186-GUIDE TRUNNION SEALING SLEEVE, ST010360187-SEALING TUBE OF GUIDE BEARING ASSEMBLY, ST010250010-Bowl extension ring segment -6 no per set, ST010250011-Bowl hub cover, ST010250012-Bull ring clamping ring -1 number - 1 mill requirement, ST010250013-Bull ring retainer, ST010250019-Insulation cover plate segment, ST010250020-Wear plate Bowl hub cover, ST010260002-Air seal ring upper, ST010260052- Journal bearing keeper, ST010260003-Journal bearing spacer, ST010260012-Lock nut -Grinding roll, Bid Details 2/96 ST010260054-Oil seal keeper, ST010260019-Seal wear ring, CS010020166-Lower journal housing, CS010020167- Upper journal housing-Var-02, CS010020168-JOURNAL HEAD AND TRUNNION SHAFT ASSEMBLY, CS010020170- Journal spring assembly, ST010280018-Journal stop bolt, ST010280019-Journal stop bolt bushing -Journal stop bolt bushing Var-02, ST010140266-Shaft for seal air fan, SC380190137-THRUST BALL BEARING 51211 - CUSTOMISED, ST010140191-SEAL.RING SH 2XD60-D48, ST010140192- SEAL.RING SH 2XD63-D50, ST010140193-LABYRINTH SEALING RING LD345V, ST010140009-PRE LOAD SPRINGS-II D309, ST010140043-SPACER COUPLING FOR FD FAN, SC380190136-AXIAL THRUST BALL BEARING 51314 - CUSTOMISED, ST010140212-SEALINGRING 63-4D72.9- D63.3X1.5, ST010140213-SEALINGRING 68-4D74.8- D66X1.5, ST010140214-LABYRINTHSEALINGRING LD 435 V, CS010020169-FAN SHAFT
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I Arresting of air ingression and ash leakages in penthouse of Unit I boiler by supply and installation of air sealants during Annual Overhaul 2024 25
NCTPS I SEMI circle AOH 25 26 BM Dn Unit I Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned coal nozzle and coal tips for Boiler burner overhaul for the year 2025 26
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I Overhauling rectification of boiler safety valves ERV spray station control valves HP LP hand operated valves and safety valves floating during Annual Overhaul 2024 25
M1593000001, M1593000002, M2299892601, M1593000003, M2299892701
1800 mm BW 1250 by 4 FR Grade HD EP Polyester Nylon as per spec for BC-1A, 1800 mm BW 1250 by 4 FR Grade HD EP Polyester Nylon as per spec for BC-1B, 1800 mm BW 1250 by 4 FR Grade HD EP Polyester Nylon as per spec for BC-4A, 1800 mm BW 1250 by 4 FR Grade HD EP Polyester Nylon as per spec for BC-4B, 1800 mm BW 1000 by 4 FR Grade HD EP Polyester Nylon as per spec for BC-5A, 1800 mm BW 1000 by 4 FR Grade HD EP Polyester Nylon as per spec for BC-5B, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for RC-1, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-1A, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-1B, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-1C, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-1D, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-2A, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-2B, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-2C, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for TBC-2D, 1800 mm BW 800 by 4 FR Grade HD EP Polyester Nylon as per spec for mandatory spares, 1800 mm BW 1000 by 4 FR Grade HD EP Polyester Nylon as per spec for mandatory spares, 1800 mm BW 1250 by 4 FR Grade HD EP Polyester Nylon as per spec for mandatory spares
ECHP-I- Replacement of complete worn out damaged asbestos roofing sheet and erection of new colour coated M.S roofing sheet diverted from UTPP 0.6mm thick inside portions of 5th floor roofing structure at Secondary Crusher House-I
ECHP-I- Replacement of complete worn out damaged asbestos roofing sheet and erection of new colour coated M.S roofing sheet diverted from UTPP (0.6mm thick) inside portions of 4th floor roofing structure at Secondary Crusher House-I
Boiler Suit (NPCIL) (Q3), Lab Coat (NPCIL) (Q3), Cotton Canvas Hand Gloves (SAIL) (Q3), socks (Q3) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No -- Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6512277 Dated : 19-08-2025 Bid Document 1/21 Bid to RA enabled No Type of Bid Two Packet Bid Primary product category Cotton Canvas Hand Gloves (SAIL) Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Item wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India Schedule 1 EMD Amount (In INR) 9308 Schedule 2 EMD Amount (In INR) 12411 Schedule 3 EMD Amount (In INR) 6205 Schedule 4 EMD Amount (In INR) 12411 Schedule 5 EMD Amount (In INR) 18616 Schedule 6 EMD Amount (In INR) 6205 Schedule 7 EMD Amount (In INR) 3787 Schedule 8 EMD Amount (In INR) 5680 Schedule 9 EMD Amount (In INR) 5680 Schedule 10 EMD Amount (In INR) 2544 Schedule 11 EMD Amount (In INR) 1792 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 2/21 ( ) Duration of ePBG required (Months). 6 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Site Director TAMILNADU, Department of Atomic Energy, NUCLEAR POWER CORPORATION OF INDIA LIMITED, PMO (Kudankulam Nuclear Power Project) Splitting
MTPS I BM Unit III Boiler pressure parts AOH 2021 Overhauling of secondary air dampers Scanner Air Fans and its damper flap gate Reconditioning of damaged wind Box compartment dampers guide plates insulation etc
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 of Unit II Boiler during the year 2019 2020
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit I Boiler during the year 2020 2021
TTPS Mech II BM Unit III Removing and relaying of damaged insulation in boiler from 8 Mtr to 52 Mtr elevation in Unit III during 2023 2024 overhaul
MTPS I BM Unit III Boiler Statutory Inspection 2020 21 Flue Gas duct B side Patch up works and other repair works between APH outlet to ESP inlet
MTPS I BM Unit I Boiler Pressure parts Reconditioning and Hard facing of used and Wornout square coal nozzle tips and checking of deformation and matching with nozzle
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit III Boiler during the year 2019 2020
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit III Boiler during the year 2022 2023
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit III Boiler during the year 2022 2023
TTPS Mech II BM Unit V Overhauling of Coal oil burner and its tilting mechanism of Corner 3 4 in Unit V Boiler during the year 2025 2026
TTPS Mech II BM Unit III Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2020 2021
MTPS I TM Unit I to IV Replacement of 3 Nos existing Service hour Completed emergency replacement of Boiler Feed Pump Cartridge by a Reconditioned Cartridge and commissioning
SUPPLY OF FINNED ECONOMIZER COIL J BEND OF SIZE 44.5 X 4.5 MM, MATERIAL SA 210 GR A1 RADIUS 180 degree PITCH 228 MM FOR UNIT II BOILER
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit III Boiler during the year 2024 2025
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit II Boiler during the year 2020 2021