Loading…
Loading…
13,550 results • Best match
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit III Boiler during the year 2020 2021
TTPS Mech II BM Unit I Replacement of coutant bottom Nipple bend in I st pass of Unit I Boiler during the overhaul for the year 2019 2020
TTPS Mech II BM Unit IV Cleaning and Painting of Safety valve silencers Vent pipes Coutant bottom enclosure structures in boiler during overhaul for the year 2024 2025
Replacing the existing wornout MSRoof by a new Galvanume sheet in ID fan Motor 5A 5BPA fan Motor 5AFD Fan Motor 5A 5B in Unit 5 Boiler Area
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit II Boiler during the year 2025 2026
MTPS I TM Unit III Overhauling of Valves in Feed Water Main Condensate Extraction Steam Auxiliary steam and Drain Water lines during Boiler License Renewal Work 2020 21
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit I Boiler during the year 2023 2024
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit I Boiler during the year 2023 2024
MTPS I - Civil Circle - Replacing the damaged ACC Sheets with new galvalume sheets (0.8 mm) for the South side roof top of Boiler Unit-IV at MTPS I
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit II Boiler during the year 2021 2022
TTPS Mech II BM Unit I Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2020 2021
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 of Unit II Boiler during the year 2019 2020
TTPS Mech II BM Unit V Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit V Boiler during the year 2021 2022
MTPS I BM Unit I Boiler pressure parts AOH 2024 Dismantling cleaning and rectification of defective seal trough seal plates S S woven wire mesh Providing patch plate
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit I Boiler during the year 2024 2025
TTPS Operation Circle MPM II Unit IV Replacement of pulverized coal pipes bends and fittings between and upto 32 mtr level of boiler area during the forthcoming overhaul
Replacement of defective Geared Motor, Rotary Valves and chutes in Boiler 1, 2 and 3 Under Grate and Dust Rotary Valves at Energy Mechanical in TNPL Unit -1.
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 of Unit III Boiler during the year 2019 2020
TTPS Mech II BM Unit V Cleaning and Painting of Safety valve silencers Vent pipes Coutant bottom enclosure structures in boiler during overhaul for the year 2025 2026
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 of Unit I Boiler during the year 2020 2021
TTPS Mech II BM Unit V Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit V Boiler during the year 2025 2026
TTPS Mech II BM Unit V Overhauling of High pressure and Safety valves in Boiler and PRDS station of Unit V during overhaul for the Year 2019 20
MTPS I BM Unit I Boiler Statutory Inspection 2020 21 Flue Gas duct A side Patch up works and other repair works between APH outlet to ESP inlet.
TTPS Mech II BM Unit III Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2025 2026
Spares For Boiler Feed Booster Pump Model FA1B56 Make Ms WEIR ENGG size 4.25 inches Mech Seal DE and NDE as per specification 2 items each 6 numbers
TTPS Mech II BM Unit III Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2024 2025
TTPS Mech II BM Unit IV Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit IV Boiler during the year 2024 2025
NCTPS II 2 600 MW MI Circle BM Unit II Boiler 600 MW Annual Overhauling of Coal / oil burner assemblies and burner tilting mechanism in corner 2 during
Supply of Finned Econo mizer coil J bend of size O 44.5 X 4.5mm Material SA 210 Gr A1/ Radius 180/ Pitch 228 mm for Unit- II Boiler
MTPS I BM UNIT III Boiler pressure parts AOH 2025 Inspection and Rectification of worn out lines and bends of Super heater header drain lines and allied works
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit I Boiler during the year 2025 2026
TTPS Mech II BM Unit V Overhauling of High Pressure and safety valves in boiler and PRDS station of Unit V during overhaul for the year 2021 2022
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit II Boiler during the year 2023 2024
TTPS Mech II BM Unit V Strengthening of attachment welding joint in radiant roof tube rear side of Unit V Boiler during overhaul for the year 2025 2026
TTPS Operation Circle MPM I Unit I Replacement of eroded Coal pipe lines, bends and fittings between Mills A, B and C and Boiler during the forthcoming overhaul
TTPS Operation Circle MPM I Unit I Replacement of eroded Coal pipe lines, bends and fittings between Mills D, E and F and Boiler during the forthcoming overhaul
MTPS I BM Unit III Boiler pressure parts AOH 2026 Dismantling cleaning and rectification of defective seal trough seal plates S S woven wire mesh providing patch plate
Replacement of defective Geared Motor, Rotary Valves and chutes in Boiler # 1, 2 and 3 Under Grate and Dust Rotary Valves at Energy Mechanical in TNPL Unit 1
TTPS Mech II BM Unit I Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2025 2026
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit I Boiler during the year 2025 2026
Removal of chocking in the catch pits in the Mill and Boiler areas and clearing the drains around the Power House of Units 4 and 5 stage 3
Custom Bid for Services - Rerouting of C and I cables for vital signals inside boiler area in Unit 1 and Unit 2 of Thermal Power Station 1 Expansion
Custom Bid for Services - Biennial Maintenance Contract for Running & Breakdown Maintenance service of two units of Boiler and auxiliaries for two years (2026-28) Similar Category Support Services
TTPS Mech II TM II Overhauling of various size of valves in Instrument and Service Air Compressors of Unit IV Pressure Vessel testing Hydrostatic test in Air Receiver Tanks and Air drier plant tanks of Unit IV and V
TTPS MechII TMI Unit III III Inspection and Cleaning of suction strainer caisson inspection Rectification of thrust bearing Breakdown works of MC Pumps Drip Pumps and Air compressors for the period from 01 04 2023 to 31 03 2024
Portable air Compressors 350 lpm min, 12 bar working pressure, Two stage compression max weight 150 kgs, should include a reservoir of 200 l, 3 HP max , as per GROZ part No. RAC/3-21-200 or better qua
SPARES FOR SULLAIR COMPRESSORS, MODEL NO: LS 20S 200L AC. 1. BLOW DOWN VALVE, PART NO: 02250100-042, QTY - 05 NOS, 2. MPV KIT, PART NO: 250018-262, QTY - 03 NOS, SL Nos: 1 AND 2 WITH QUANTITIES MENTIO
Set of service kit for RR20100 CG(M) compressors, Set consists of 3 items as given below: 1) Disc Valve Service kit as per ELGI Part No.022400989 - 15 Nos/Set 2) Discharge Valve Service kit as per EL
Supply, Erection of 2HP compressor motor with pump and water supply pipe line arrangement and repairing of 9.0m,8.0m curing tanks at PSC yard Vaniyankulam
Procurement Of 1K-2B/C Compressor Suction KOD and 1-C08 Product Separator and 9-C-501A Inert Gas Knock Out Drum At CPCL Manali