Loading…
Loading…
13,550 results • Best match
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors
Cleaning and Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors
TTPS Mech II BM Unit I II III Boiler Breakdown maintenance works in Burner and H O Guns in Unit I II III for the period from the date on or after 08 04 19 and upto 30 09 19
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned Coal nozzle Coal tips for Boiler Burner Overhauling works for the year 2025 26
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III Residual Life Assessment RLA Life Extension LE of 210 MW Boiler and its Auxiliaries bearing Regy No T 6285 Unit III during Annual overhaul 2024 25
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III Residual Life Assessment RLA Life Extension LE of 210 MW Boiler and its Auxiliaries bearing Reg No T 6285 Unit III during Annual overhaul 2024 25
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I III Dismantling cleaning and rectification of defective dislocated boiler seal trough seal plates S.S woven wire mesh providing patch plate and coating of LUMEROUS HR 47
NCTPS I SE MI circle AMC 25 26 BM Dn Unit I II III Attending boiler tube puncture and Breakdown works during shutdown for the period from the date of handing over of site upto 31 03 2026
NCTPS I SE MI Circle AOH 24 25 BM Dn Reconditioning of defective passing of SH RH spray station control valves and CBD EBD valves with build up ends for Unit III boiler during the year 2024 25
NCTPS I ES Circle EM I Dn GM Sdn V Measuring the dimensions of slip rings fixing the lathe machine Groove cutting and polishing the slip ring to the required dimensions in Unit II during the AOH for period of 2020 21
NCTPS I ES Circle EM I Dn GM S dn V Measuring the dimensions of slip rings fixing the lathe machine Groove cutting and polishing the slip ring to the required dimensions in Unit I during the AOH for period of 2020 21
NEUTRAL INSERTS FOR UNDER FLOOR PIT WHEEL LATHE TO SANDVIK ASIA INDIA LTD PART NO 175/32/1919 -40-25 mm,WIDIA INDIA LTD PART NO-44 315 820 2152 GRADE ATM, INDICARB LTD PART NO.191940 N GRADE IND 2 M 2
Goods Transport Service – Per Trip based Service - Machinery & Equipment; MINI VAN LCV TATA ACE 0 TO 30 KM; MINI VAN LCV TATA ACE 0 TO 30 KM, Goods Transport Service – Per Trip based Service - Machinery & Equipment; MINI VAN LCV TATA ACE 30 TO 60 KM; ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ... - Machinery & ...
Goods Transport Service – Per KM Based Service - Machinery & Equipment; CLOSE BODY 19 FEET TRUCK OUTSIDE STATE; CLOSE BODY 19 FEET TRUCK OUTSIDE STATE
Goods Transport Service – Per KM Based Service - Machinery & Equipment; CLOSE BODY 19 FT TRUCK WITHIN STATE; CLOSE BODY 19 FT TRUCK WITHIN STATE
Providing machinery shed and Paddy loading and unloading shed the newly constructing Mega DPC at Panchanathikottai Village in Orathanadu Taluk in Thanjavur District.
Construction of Machinery Room at Resource Recovery Park in Valavanur Town Panchayat, Villupuram District under 15th FC (Tied Grant-II Instalment) -2022-23
Desilting Rettai Vaikkal Canel from Rathinam Salai to Railway Road using Necessary earth Moving Machinery at Zone 2 in Karur City Municipal Corporation.
Goods Transport Service – Per Trip based Service - Machinery & Equipment; 4 x 40 ft trailer from Chennai port to kochi; 4 x 40ft trailer
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Transportation and safe delivery of Reactor Headers, through Road, from BHEL Trichy to NPCIL KAIGA Site, by engaging suitable capacity Mechanical Vehicles (60 feet Mechanical..
Boiler Maintenance Division Auxiliary Boiler Boiler Make No 7789 Overhauling of auxiliary boiler steam and feed water system fuel firing system air and flue gas system soot blowing system and chemical dosing system and for Boiler license renewal
NCTPS I SE MI circle R and M 25 26 BM Dn Unit I II III Strengthening of corroded Damaged supporting structures in boiler additional supports in inter connecting walk way approaching platform from 37 Mtr elevation
PROVIDING WELD MESH FENCE TO THE EXISTING GRILL NEAR EMPLOYEE GATE, CANTEEN BOILER AREA AND SS HAND RAIL WORKS TO MAIN GATE SECURITY OFFICE AT TNPL UNIT-II TRICHY
MONTRG AND ATTENDING INTERUPTIONS IN CRUSHER OPN ETC
NCTPS I SE MI Circle AMC 25 26 BM Dn Lifts Daily maintenance and breakdown maintenance of Freight cum Passenger lift in Unit I II III Boiler from the date of taken over of site upto 31 03 2026
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II III Supply and Installation of Air Sealants in Penthouse of Unit II III to avoid ash leakage air ingression to the boiler during Annual Overhaul 2025 26
NCTPS I SE MI Circle AOH 24 25 BM Dn Unit III Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned coal nozzle and coal tips for Boiler Burner overhauling works for the year 2024 25
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned Coal nozzle and Coal tips for Boiler Burner Overhauling works for the year 2025 26
NCTPS I SEMI Circle AOH 25 26 BM Dn Unit I Providing cup lock metallic scaffolding arrangements inside the boiler furnace up to the radiant roof to facilitate for inspection tube thickness survey in water wall platen SH inspection
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I III Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned coal nozzle coal tips for Boiler Burner overhauling works for the year 2024 25
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Removal relaying boiler Insulation and its accessories in Burner corner windbox pent house 1st pass Drum encloser WWSB Dockhouse Eco ring header S panel 2nd pass Dockhouse
NCTPS I SE MI Circle AOH 26 27 BM Dn Unit I II III Dismantling cleaning and rectification of defective dislocated boiler seal trough seal plates SS woven wire mesh providing patch plate and coating of LUMEROUS HR 47
NCTPS I SE MI Circle AOH 26 27 BM Dn Unit I Reconditioning of defective Coal nozzles Coal tip and Hard facing of reconditioned coal nozzle and coal tips for Boiler Burner overhauling works for the year 2026 27
Design, Supply, Erection, Commissioning, Installation and Testing of 10 LLPD capacity Fully Automatic Dairy Processing and Sachet Packing, Stacking Plant and Two Nos. of 6000 kg/hr. capacity Dual Burner (CNG and Furnace oil) Fired Steam Boiler with C
MTPS I BM UNIT IV Boiler pressure parts AOH 2020 21 Reconditioning of worn out damaged fin welding Renewal reconditioning of header Shield plates Overhauling of peep hole manhole door assemblies and allied works
Inclien Infeed Conveyor 1500mm by 500mm, Potato Sorting Unit, Accept Conveyor 1250mm by 500mm, Reject Conveyor 1250mm by 500mm, Three Phase 3HP Motor Starter
Inclien Infeed conveyor 1500mm by 500mm, Potato sorting unit, Accept conveyor 1250mm by 500mm, Reject conveyor 1250mm by 500mm, Three phase 3HP motor starter
ECHP-I- Replacement of complete worn out damaged asbestos roofing sheet and erection of new colour coated M.S roofing sheet 0.6mm thick diverted from UTPP in side portions of 6th floor roofing structure at Secondary Crusher House-I.
ECHP-I- Replacement of worn out portion of side brazing iron and steel structure (39 mtr. Level to 49 mtr. Level) by a new one and painting of newly erected brazing iron and steel structure at Secondary Crusher
Lubricating oil for Centrifugal Compressor, DHB-024 -1 PAIL- 19 litres- -Part No.AC7101002024- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014., Oil Filter Core, DCLC -Part No.ACDUNYLQ-90001-1- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014., Filter Drier Core, 48- DC -023U4381- -Part No. ACBLK42- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014., Mechanical Seal and Wear Kit for ACTC system. -Part No. ESSP0599- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014., 1.5 inch- Control valve with Actuator for ACTC system -Part No. ESSP0388- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014., Ball collector Glass Window -Part No. ESPR1081- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014., Ball collector - O- Ring -Part No.ESPR1095- for 600 TR Centrifugal Chiller of Model VLCF D60ED vide S.No.2C11900013 and S. No. 2C11900014.
ICHP- Reconditioning of various sizes of idler rollers for Stage-III Conveyors.
various sizes of bearings for pulley of ECHS conveyors and its equipments
Goods Transport Service – Per Trip based Service - Machinery & Equipment; Open Body LCV Truck; Three type of LCV 10Ton, 6Ton, 3Ton capacity with including loading and unloading of stores As Per SOR
NCTPS I SE MI Circle AOH 25 26 BM Unit I Complete Removal of worn out damaged insulation in boiler Drum down comer pipe line 6 Nos ring header areas during Annual Overhaul Long shutdown and relaying of insulation while unit in service
MTPSI TM Unit I II Preventive Breakdown maintenance works Repairing works of Air Compressors Make KG Khosla Model No 2HA2QT Air Dryers Make Khosla on As When required Basis for a period of One year in the year 2026 2027
NCTPS I SE MI circle AOH COH 25 26 BM Dn Unit II Conducting tube thickness survey and repair work in 1st Pass Inter Pass overhauling of Ignitor scanner air fan system Boiler Drum Overhauling and renewal of defective tubes
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I Removal of damaged broken ACC sheets and Renewal of colour molded corrugated sheet in boiler roofing at 64 Mtr elevation during Annual overhaul for the year 2025 26
NCTPS I SE MI Circle AOH 25 26 BM Dn Unit I II III Overhauling rectification of boiler safety valves spray station control valves HP LP hand operated valves and safety valves floating during Annual overhaul for the year 2025 26
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III Renewal Rectification of damaged radiant roof skin casing sheets Penthouse roof and plastering of refractory in radiant roof area of boiler Ist Pass during Annual overhaul 2024 25
NCTPS I SE MI circle AOH 24 25 BM Dn Unit I Renewal Rectification of damaged radiant roof skin casing sheets Penthouse roof and plastering of refractory in radiant roof area of boiler Ist Pass during Annual Overhaul 2024 25