Cleaning Clearing the spilled Red hot bottom ash from DRYCON screw conveyor surrounding bottom ash hoppers area and Crusher house area transporting the ash to upper ash dyke by using the contractors vehicles of JCB and Tractors and unloading
TTPS Mech II BM Unit IV V Certain specified works to be carried out in different locations of unit IV V boilers in Water Wall CRH water wall hanger water wall screen and extended water walls etc during overhaul for the year 2022 23
TTPS ES EM III Replacing the existing wornout MS roof by a new galvanume sheet in PA fan Motor 4B and 5B in Unit 4 and 5 Boiler area
TTPS Mech II BM Unit IV Overhauling of High Pressure valves safety valves in boiler and PRDS station valves of Unit IV during overhaul for the year 2025 2026
TTPS EM III Load testing of 4 Nos 10 Tonne capacity wire rope Electric Hoists at FD Fan and PA Fan Motor 4A 4B of Unit IV Boiler area
TTPS M II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 3 and 4 in Unit III Boiler during the year 2023 2024
TTPS Mech II BM Unit IV Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof overhaul for the year 2025 2026
TTPS Mech II BM Unit V Repairing of worn out skin casing inside the dog house and coutant bottom area in boiler during overhaul for the year 2025 2026
TTPS ES Circle EM III Providing of MS support stand for 6 6 kV HT Power Cables in Coal Mill motors Terminal Box end in Unit 4 Boiler area
MTPS I BM Unit III and IV Boiler AOH 2022 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied work
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 4 during the forthcoming overhaul
TTPS Mech II BM Unit IV Overhauling of High Pressure valves and safety valves in boiler and PRDS station of Unit IV during overhaul for the year 2023 2024
TTPS Mech II BM Unit V Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof overhaul for the year 2025 2026
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends and fittings between Mills A, B and C and Boiler during 2021-2022 annual overhaul
Design, Manufacture, Testing, Supply, Erection and Commissioning of Low side HVAC works for proposed Boiler#8 MCC and ESP MCC Building under RSPS#2 Project at TNPL Unit-I
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 4 during the forthcoming overhaul
TTPS Mech II BM Unit I III Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2021 2022
TTPS Mech II BM Unit V Overhauling of High Pressure valves and safety valves in boiler and PRDS station of Unit V during overhaul for the year 2024 2025
MTPS I BM Unit II Boiler pressure parts AOH 2021 Inspection and Rectification of worn out lines and bends of Super heater header drain lines Blow down lines etc
TTPS Mech II BM Cleaning of Boiler IV V Zero meter area for a period from the date on or after 08 10 2020 and upto 31 03 2021
TTPS Mech II BM Unit IV Repairing of worn out skin casing inside the dog house and coutant bottom area in boiler during overhaul for the year 2024 2025
Complete coupling assembly for BFBP to BFP Motor Complete Coupling assembly for motor to Voith make hydraulic coupling Voith make hydraulic coupling to FK6D30 Boiler feed pump with fasteners
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator systems in Units IV V for the period from 01 04 2023 to 31 03 2024
TTPS Operation Circle MPM II Unit IV Replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator system in Units IV V for the period from 01 04 2025 to 31 03 2026
Providing Manpower for the Operation of Sewage Treatment Plant near TNPL ITI, Power Boiler Air Cooled Condenser and De-inking plant at Water Management-ETP in TNPL Unit -1.
Supply of 28inch Coal Nozzle Assembly, Tubular reach rod, Seal Plate, Guide Pipe diffuser assemblies of HFO and LDO oil guns and Forged C clamp suitable for 600MW Boiler
TTPS Operation Circle MPM II Unit V Replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
TTPS Operation Circle MPM-II Unit IV Replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
TTPS Operation Circle MPM II Unit IV Replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends and fittings between Mills D, E and F and Boiler during 2021-2022 annual overhaul
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 2 during the forthcoming overhaul
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 2 during the forthcoming overhaul
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator system in Units IV V for the period from 01 04 2024 to 31 03 2025
TTPS M II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 and 2 in Unit III Boiler during the year 2023 2024
TTPS Mech II TM II Breakdown maintenance of Boiler feed pump and Deaerator system in Units IV V for the period from 01 04 2026 to 31 03 2027
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 4 during the forthcoming overhaul
SUPPLY, INSTALLATION, TESTING, ERECTION AND COMMISSIONING OF THREE ELEMENT AUTOMATIC DRUM LEVEL CONTROL SYSTEM ALONG WITH AUTO CONTROL VALVE, PID CONTROLLERS AND FLOW TOTALIZERS FOR BOILER APPLICATION WITH ACCESSORIES
TTPS MII BM Unit III Seat cutting of direct spring loaded safety valves of 210MW boiler Drum safety valves and super heater safety valves during annual overhaul 2023 2024
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 2 during the forthcoming overhaul
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 2 during the forthcoming overhaul
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 4 during the forthcoming overhaul
TTPS Operation Circle MPM I Unit I Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 4 during the forthcoming overhaul
TTPS Operation Circle MPM I Unit III Replacement of eroded Coal pipe lines, bends and fittings between Mills D, E and F and Boiler during 2021 2022 Annual overhaul
TTPS Mech II BM Unit IV Repairing of worn out skin casing inside the dog-house and coutant bottom area in boiler during overhaul for the year 2023 2024
TTPS Mech II BM Unit IV V Cleaning and Painting of Safety valve Silencers Vent pipes Coutant bottom enclosure structures in boiler during overhaul for the year 2022 23
MTPS I BM Unit I and II Boiler AOH 2022 Re conditioning and hard facing of used and worn out coal nozzles fixing of divider plates and allied work
TTPS Operation Circle MPM-II Unit V Replacement of pulverized coal pipes, bends and fittings between mill and upto 32 mtr level of boiler area during the forthcoming overhaul
TTPS Operation Circle MPM I Unit III Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 1 2 during the forthcoming overhaul
TTPS MII BM Unit IV Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul for the year 2023 2024