Loading…
Loading…
13,550 results • Best match
TTPS Operation Circle MPM I Unit III Replacement of eroded Coal pipe lines, bends and fittings between Mills D, E and F and Boiler during the forthcoming overhaul.
MTPS I TM Unit I to IV Replacement of 2 Nos existing Service hour Completed emergency replacement of Boiler Feed Pump Cartridge by a Reconditioned Cartridge and commissioning
TTPS Mech II BM Unit V Overhauling of High Pressure and safety valves in boiler and PRDS station of Unit V during overhaul for the year 2025 2026
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit III Boiler during the year 2025 2026
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit II Boiler during the year 2025 2026
MTPS I BM Unit I Boiler Statutory Inspection 2022 23 Flue Gas duct B side Patch up works and other repair works between APH outlet to ESP inlet
TTPS Mech II BM Unit II Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2023 2024
TTPS Mech II BM Unit IV Overhauling of High Pressure and safety valves in boiler and PRDS station of Unit IV during overhaul for the year 2021 2022
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends and fittings between Mills A, B and C and Boiler during the forthcoming overhaul
TTPS Mech II BM Unit II Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2024 2025
TTPS Mech II BM Unit V Dismantling Erection and testing of Cassette Baffles for LTSH coil assemblies in Unit V Boiler during overhaul for the year 2025 26
MTPS I BM Unit I Boiler Statutory Inspection 2022 23 Flue Gas duct A side Patch up works and other repair works between APH outlet to ESP inlet
TTPS Mech II BM Unit II Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2021 2022
TTPS Mech II BM Unit I Replacement of coutant bottom acute bends Front in I st pass of Unit I Boiler during overhaul for the year 2019 2020
MTPS I BM Unit I Boiler Statutory Inspection 2020 21 Flue Gas duct B side Patch up works and other repair works between APH outlet to ESP inlet
TTPS Mech II BM Unit IV Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit IV Boiler during the year 2021 2022
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 3 4 in Unit II Boiler during the year 2024 2025
TTPS Mech II BM Unit IV V Overhauling of High Pressure and safety valves in boiler and PRDS station of Unit IV V for the year 2022 23
MTPS I TM Unit I Overhauling of Turbine Lub Oil Cooler Booster Pumps Overhauling of Hydrazine Dozing Pumps and Phosphate Dozing Pumps during Boiler license renewal 2020 2021
TTPS ES EM II Annual Service Maintenance Contract for 2 Nos freight cum passengers lift in Unit I II and III Boiler area period from 01042024 to 31032025
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit III Boiler during the year 2024 2025
TTPS Mech II BM Unit III Repairing of worn out skin casing inside the doghouse and coutant bottom area in boiler during overhaul for the year 2022 23
TTPS Mech II BM Unit III Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2023 2024
TTPS Mech II BM Unit II Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2025 2026
TTPS Mech II BM Unit I Strengthening of structural supports rectification of defects in the hangers rods at 56 mtr elevation boiler roof during the overhaul 2023 2024
TTPS Mech II BM Unit IV Overhauling of High Pressure and safety valves in boiler and PRDS station of Unit IV during overhaul for the year 2024 2025
SUPPLY OF FINNED ECONOMIZER COIL J BEND OF SIZE 44.5 X 4.5 MM, MATERIAL SA 210 GR A1 RADIUS 180 degree PITCH 228 MM FOR UNIT I BOILER
MTPS I BM Unit III Boiler Statutory Inspection 2020 21 Flue Gas duct A side Patch up works and other repair works between APH outlet to ESP inlet
Replacement of damaged galvalume sheet and painting of structurals in Recovery Boiler No.3 side cladding and louvers from 25.0mtr to 60.0mtr - Phase I at TNPL Unit I
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit II Boiler during the year 2024 2025
Site fabrication of welded Box-400X400-25/25 End Plate required for the repair of Damaged Girders of unit no.5 Boiler at NLCIL-TS-II, Neyveli (210MW)
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit III Boiler during the year 2025 2026
MTPS I TM Unit I Overhauling of Valves in Feed Water Main Condensate Extraction Steam Auxiliary steam and Drain Water lines during Boiler License Renewal Work 2020 21
MTPS I TM Unit I to IV Replacement of 2 Nos existing Service hour Completed emergency replacement of Boiler Feed Pump Cartridge by a Reconditioned Cartridge and commissioning
TTPS Mech II BM Unit I Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit I Boiler during the year 2020 2021
TTPS Mech II TM I Unit II Renewal of defective 250 NB class 2500 class in Boiler feed pump 2A discharge line NRV during the forthcoming annual overhaul
MTPS I TM Reconditioning of 3 Nos Cartridges of Boiler Feed Pump Model FK6D 30 Cartridge No P 86010 88016 P 86082 released from BFP 1A 2A 3C
Design, Engineering, Manufacturing, Supply, Erection, Commissioning and fulfillment of Performance Guarantees of One (1) no. 125 tph AFBC Power Boiler along with other accessories, Auxiliaries and Spare parts
TTPS Mech II BM Unit II Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 in Unit II Boiler during the year 2023 2024
MTPS I TM Unit I to IV Replacement of 3 Nos existing Service hour Completed emergency replacement of Boiler Feed Pump Cartridge by a Reconditioned Cartridge and commissioning
MTPS I BM AOH 2021 22 Unit IV Boiler pressure parts Replacing overheated HRH coil header stub bends and other circuit bends at penthouse area and allied works
MTPS I TM Unit III Overhauling of Turbine Lub Oil Cooler Booster Pumps Overhauling of Hydrazine Dozing Pumps and Phosphate Dozing Pumps during Boiler license renewal 2020 2021
TTPS Operation Circle MPM I Unit II Replacement of eroded Coal pipe lines, bends and fittings between Mills D, E and F and Boiler during the forthcoming overhaul
Tender for procurement of Hot End, Hot Intermediate and Cold End heating element basket assembly suitable for Air preheater 1 A and 1B for 600MW unit-I Boiler
TTPS Mech II BM Unit IV V Overhauling of wind box SADC AC DC scanner fans of Unit IV V Boiler during overhaul for the year 2022 23
Design Manufacturing Testing Supply Supervision of Installation and Commissioning of Uninterrupted Power Supply (2x40 KVA UPS) System for Boiler 8 of RSPS 2 Project at TNPL Unit I
MTPS I TM Reconditioning of 2 Nos defective Cartridge of Boiler Feed Pump Model FK6D 30 Cartridge No 701432 A P 85021 released from BFP 1A and 2A
TTPS Mech II BM Unit II Cutting grinding and rewelding of Hot reheater coil dissimilar weld joints in Unit II Boiler during overhaul for the year 2023 2024
TTPS Mech II BM Unit III Overhauling of Coal oil burner and its tilting mechanism of corner 1 2 of Unit III Boiler during the year 2020 2021
MTPS I TM Unit I Overhauling of Valves in Feed Water Main Condensate Extraction Steam Auxiliary steam and Drain Water lines during Unit I boiler statutory inspection 2022