Loading…
Loading…
13,519 results • Best match
TTPS Mech II BM Unit III Replacement of boiler pressure parts tubes bends in I pass of Unit III Boiler during the year 2024 2025
TTPS Mech II BM Unit II Replacement of boiler pressure parts tubes bends in I pass of Unit II Boiler during the year 2024 2025
MTPS I BM Unit III Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
TTPS Mech II BM Unit II Replacement of boiler pressure parts tubes bends in I pass of Unit II Boiler during the year 2023 2024
MTPS I BM Unit II Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
TTPS MechII BM Unit I Replacement of boiler pressure parts tubes and bends in I pass of Unit I Boiler during the year 2023 2024
MTPS I BM AOH 2021 Unit I Boiler Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler IInd pass area
TTPS Mech II BM Unit II Replacement of boiler pressure parts tubes bends in I pass of Unit II Boiler during the year 2025 2026
MTPSI BM AOH 2020 21 Unit IV Boiler Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler IInd pass area
MTPS I BM AOH 2021 Unit II Boiler Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler IInd pass area
MTPS I BM Unit II Boiler AOH 2020 Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler IInd pass area
TTPS Mech II BM Unit I Replacement of eroded boiler pressure parts tubes bends in II pass and inter pass area of Unit I boiler
MTPS I BM Unit III Boiler pressure parts AOH 2026 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
TTPS Mech II BM Unit V Replacement of eroded boiler pressure parts tubes bends in II pass and inter pass area of Unit V Boiler
Fabrication and erection of structural supports for Boiler # 8 concrete floor, boiler MCC staircase and silo staircase for RSPS # 2 project at TNPL Unit I
MTPS I BM Unit IV Boiler pressure parts AOH 2025 Rectification Replacement of defective tubes in LTSH Coils Economizer hanger at boiler IInd pass area
TTPS Mech II BM Unit I Replacement of boiler pressure parts tubes bends in I pass of Unit I Boiler during the year 2025 2026
MTPS I BM Unit III Boiler COH 2019 Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler II pass area
MTPS I BM Unit IV Boiler AOH 2019 Rectification Replacement of Defective tubes in LTSH Coils and Economizer hanger tubes at boiler II pass area
Unit III - Strengthening of structural supports, rectification of defects in the hangers rods at 56 mtr elevation boiler roof during overhaul 2018-19
MTPS I TM Unit II Complete overhauling and painting of Instrument Air Compressors IAC 2A 2B 2C
MTPS I TM II Unit I Complete overhauling and painting of Instrument Air Compressors 1A 1B 1C
Deployment of Service Engineer to supervise the maintenance activities of Atlas Copco make compressors and air driers
MTPS I TM Unit I Complete overhauling and painting of Instrument Air Compressors 1A 1B and 1C
MTPS I TM Unit IV Complete overhauling and painting of Instrument Air Compressors IAC 4A 4B 4C
various size of pipes and pipes fittings for IA PA compressors cooling water line at KGTPS Maruthur
MTPS I TM II Unit I Complete overhauling and painting of Service Air Compressors 1A 1B 1C
Air Filter, Part No: 88290003-111 for sullair compressors, Model No: LS 20S 200L AC. Make: SULLAIR.
Rear Guard for RR20100 CG(M) Compressors to ELGI Part No. 070315440. FIRM'S OFFER :-Make Brand : ELGI
Customized AMC/CMC for Pre-owned Products - Air Compressors; Atlas Copco; Annual Maintenance Contract (AMC); Monthly; No
Custom Bid for Services - Biennial Maintenance Contract for servicing of air compressors in Thermal Power Station 2
NCTPS I SE MI circle AOH 24 25 MPM Dn Unit III Mills 3A 3B 3D and 3F Checking the gear box internals TI chute overhaul work Under bowl body side liner wear plate Air direction vane renewal seal renewal work during annual overhaul for the year 2024
PCB ANNUNCIATION CARD USED IN ELGI MAKE COMPRESSOR, pcb disply card with cable used in elgi make compressor of dry ash system
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 01.04.2024 to 31.03.2025
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 08.04.2021 to 30.09.2021
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 08.04.2022 to 30.09.2022
TTPS Operation Circle MPM II Unit IV, V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 08.04.20 to 30.09.20
NCTPS I SE MII Circle ECHS Dn Overhauling and Reconditioning of belt feeder Gear Box of Ratio 1 140 0855 for shore unloaders I and II at coal berth I of KPL
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 01.04.2023 to 31.03.2024
TTPS Operation Circle MPM II Unit IV V mills Checking the alignment of mill motor with gear box and setting the axial and radial clearance for a period from 01.04.2025 to 31.03.2026
Supply and installation of Worm reduction gear box In SWIVEL TYPE-EOT CRANE Model:SNU U 6'', Ratio:40:1. Make: ELECON, SHANTI GEARS, BHARAT GEARS, ROTECTransmission only The supply should accompany wi
TTPS Operation Circle MPM II Unit V Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 5A, 5B and 5C during 2018-19 annual overhaul.
TTPS Operation Circle MPM II Unit V Overhauling of mill, gear box, under bowl, mill outlets, classifier assembly etc and painting in Mills 5D, 5E and 5F during 2018-19 annual overhaul
Wear Protection Shileds for Boiler Water Wall Screen Tubes with Clamps
1.5 TR Compressor for split NON inverter type AC (Q3), 2 TR rotary compressor Inverter make daikin (Q3)
MAIN COMPRESSOR COMPLETE ASSEMBLY WITH DRIVING MOTOR MCP
PROCUREMENT OF AC COMPRESSOR ONBOARD ICGS C-453
procurement of AC Compressor onboard ICGS C-440
AVIATION COMPRESSOR AK150C OR AK150CB/155.38. 067- 1
AVIATION COMPRESSOR AK150C OR AK150CB TO DRG NO.