82 live41 closing this weekmost from TELANGANA POWER GENERATION CORPORATION LIMITED and South Central Railway
82 results • Best match
Design, Manufacture, Inspection, Supply, Transportation to site, Supervision on erection, Testing and Commissioning of 1No. Reciprocating Air Compressor with 55Kg/Cm2 discharge pressure and 7m3/Min. inlet flowrate capacity along with Suitable Motor, Control Panel, Sensors, Indicators, Electrical Cables, PLC Controls etc at Nagarjunasagar Main Power House
EPC Contract for Design, Supply, Erection, Commissioning, Testing and Trial Run of Coal Evacuation System by Belt Conveyors and Dispatch through Rapid Loading System (RLS) with Silo at VK CHP (6 MTPA), KGM Area, including Operation and Maintenance during the five-year Defect Liability Period (DLP).
Procurement of 100 NB MS pipes to replace damaged bracing pipes in both unit boiler ducts (APH, ESP and ID fan inlet/outlet ducts) in AOH at STPP, Jaipur, Mancherial, Telangana
Providing Facility Management and Housekeeping Services including deployment of manpower, housekeeping consumables and machinery for the Second Shift at Cyberabad Municipal Corporation, NAC Building, Madhapur Circle-50
Over hauling kit for 36months of Compressor type TRC 1000DCM of M/s ELGI make. 1. LP Cylinder with Liners - 070301440 - 01No. 2. Cylinder HP side 84 dia - 000218840 - 01No.
Supply of Auxiliary Contactors, Timers and MCBs for 18Nos Compressors of BOP area
KTPS-V Stage- BM- Provide skilled labor, specifically IBR Welders and Grinders, to replace the boiler tubes in Unit-X of the KTPS-V stage during the Annual Overhaul period for the year 2026-27-Reg
Set of items required for inlet and outlet disc Valve Plates of Compressor RR20100CG/RR20100CG(M), as per M/s Elgi Part Nos. Set consists of 05 items. Set details as per Annexure-A
Supply of spares for Boiler HEA Ignition system
BMD-Conducting Radiography test of welded joints of Boiler Pressure parts for 1X500 MW Boiler during COH works for the year 2026-27
TGGENCO-YTPS-Supply of Fin Bar Plates for Boiler.
Supply of spares for burner tilt mechanism suitable for 600MW boiler
Supply of Spare parts of Flowmore make 5614 AWS model Boiler Blow Down pump and 5612 AWS model Boiler /TG Floor wash pump in ETP of CAM Division/Stage-II/BTPS
TGGENCO-YTPS-Supply of 36 inch Gravimetric Feeder Spares for Boiler - III Division of YTPS.
TGGENCO-YTPS-Supply of 36 inch Gravimetric Feeder Spares for Boiler-IV Division of YTPS.
Water boiler of 30 ltrs capacity for hot buffet LHB type coaches generally confirming to IS:3412 or latest along with control box and necessary plumbing & tap arrangement on a common base plate confirming to RCFs Specification No. EDTS-118, REV -E with amendment No.2 or latest & Drg.No. LH 72211, Alt - b or latest.
BMD-Service Charges for online testing and pressure setting of Boiler Safety valves of 1X500 MW KTPP Unit
Water boiler of 30 ltrs capacity for hot buffet LHB type coaches generally confirming to IS:3412 or latest along with control box and necessary plumbing & tap arrangement on a common base plate confirming to RCF s Specification No. EDTS-118, REV -E with amendment No.2 or latest & Drg.No. LH 72221, Alt- a or latest
TGGENCO-YTPS-Supply of Seal ring segments for HP1103 Bowl mills required for Boiler-III and IV/YTPS/Stg-II.
BMD-Availing the services to carry out various Non-destructive examinations (NDE) in 1X500MW boiler during upcoming capital overhauls 2026-27
TGGENCO-YTPS-Supply of T and P items like Welding Machines, Electrode Drying ovens required for Unit-II Boiler, Stage-I.
Single Lip Oil Seals for Jumbo Size: 51.5mm x 76.5mm x 16mm as per Annexure A, Single Lip Oil Seals for NH 26 Lathe Machine Size: 26mm x 38mm x 6mm as per Annexure A
Supply of Flexible Dry Type complete coupling set between Drive Turbine to Boiler Feed Pump for TDBFPs of 1X500MW Unit for Capital Overhaul 2026-27.
Supply of Seal plate for Closing of openings/gaps on sides and bottom of 6A/B and 7 A/B Conveyor Gallery Structure in CHP area of BTPS, Manuguru
TGGENCO-KTPP-Stage-II-BMD-Service charges for deputation of Service Engineer for servicing of various actuators of boiler/Stage-II/KTPP for the financial year 2026-27
Cleaning of roads, drains, removal of vegetation, up-keeping of various facilities etc., around FOUPH, Crusher House, MCC-2 to 3, STP, Raw water reservoir, FOFPH and Oil Dyke of BTPS, Manuguru from October 2026 or actual date of utilization to March 2027
" TC9765632703 USPCV, 3" " 300RF, SS316L, SET: 7~ 9KG/CM2G with CE marking, Machinery directive and PED, " TC9765632754 DSPCV, SET: 2~ 5KG/CM2G with CE marking
TGGENCO-YTPS- Supply of Porosint Mortar with Liquid Binder, SS Mesh and SS Pins for Refractory Gap Sealing at First pass, extended Pass Junction and pent house for Boiler/U-I and II/Stg-I/YTPS.
TGGENCO YTPS 5x800MW CHP Clearing of TTR Grid jams, Chute Jams of TP25, TP9, TP10, TP11, TP12, TP13, TP14, TP15 and Belt jams, Pulley Jams of their respective conveyors for smooth facilitation of coal feeding activity to unit bunkers and any other coal related works as instructed by engineer incharge for a period of 30 days from actual date of commencement during FY 2026-27
Cleaning of roads drains removal of vegetation, up keeping of various facilities etc around Wagon tippler Track Hopper Conveyor 3 A/B Stock Piles MCC-I and Civil office shed etc in CHP area of BTPS from October 2026 or actual date of utilization to March 2027
terminals as per sample (kanthal) as and when required as per direction of EIC Qty 16Nos, Custom Bid for Services - Supply of High density furance wool as and when required as per direction of EIC Qty 3Nos, Custom Bid for Services - Supply of 230 ... existing boiler as ... 50KW boiler as ...
FIRM PREMISES AS PER SCOPE OF WORK ENCLOSED; THIRD PARTY INSPECTION OF 100 SETS OF WATER RADIATOR 765- 03-SB17.., Hiring of Third-Party Inspection Agency - THIRD PARTY INSPECTION OF 100 SETS OF EJECTOR AND AIR CLEANER 675-10-CD2 ITEM LF ... OF COMPRESSOR PLANT ... OF COMPRESSOR PLANT ...