Loading…
Loading…
5,543 results • Best match
Supply of Sulzer make Boiler Centrifugal feed pump with 45.26 m3 per hr discharge and 997.7 meters of differential head
BMD- Testing and metallurgical analysis to find out root cause of failure in Boiler tubes for the year 2026-27
HYDRAULIC HOSE, AIR CLEANER (AIR SUCTION FILTER ELEMENT) COMPRESSOR, BRAKE SHOES, MASTER CYLINDER ASSY, EHEEL CYLINDER ASSY
SUPPLY OF PISTON ROD, COUNTER NUT, PISTON LOCK NUT AND PISTON BOX NUT FOR RECIPROCATING COMPRESSOR (Q3)
SUPPLY, DELIVERY, ERECTION, TESTING AND COMMISSIONING OF SORTING CONVEYOR BELT FOR 5 TPD CAPACITY FOR SOLID WASTE MANAGEMENT PROCESSING IN MAKTHAL MUNICIPALITY.
Manufacture, Testing and Supply of 3,000mtrs of FR Grade NYLON/NYLON Conveyor Belt required for coal handling plant of YTPS of TGGENCO.
Custom Bid for Services - Operation, Maintenance & Housekeeping Contract of WFGD Plant (Wet Flue Gas Desulphurization Plant) of 2x800Mw Boilers for Two years at NTPC Telangana Similar Category Operation and Maintenance Power House/Power Plant
TGGENCO-YTPS(5x800MW)-Unit-2-BM-Up keeping of ESP ERM and CRM gear boxes, FD,PA, ID fans, APH and Seal air fans areas and their lube oil pumps, Oil stations and arresting of oil leaks and minor oil leakage rectification for Unit-II Boiler maintenance for the FY 2025-26, i.e from actual date of commencement of work to 31.03.2026.
Providing of Labour assistance in maintenance for removal, cleaning their internals, testing and assembling of guns in all elevations in Boiler furnace and also for cleaning oil leakages if any and dust at Oil skids, steam lines for guns at Unit#3 and Unit#4 Stage-II/BTPS, Manuguru for the period from 01-04-2024 to 31-03-2025
BMD-Transportation of mill reject ground coal from mill pits , Mill trenches, Sumps and mill around area to reject coal stockyards of mills A to H of mill reject system and clearing of spillover coal and coal powder surrounding of mills (A to H) in ... in Boiler maintenance ...
Machining of Turbine bearing oil catchers, Generator bearing oil catchers, Generator hydrogen seal ring, Coupling bolts of Generator and Turbine, Turbine driven boiler feed pump oil seals and steam seals , Turbine U seal rings, Turbine shaft seals and Turbine governing valves of Unit-1(600MW) and Unit-2 (600MW) at Singareni Thermal Power Plant, Village:Pegadapalli, Mandal:Jaipur, District: Mancherial, State: Telangana.
TGGENCO-YTPS(5X800MW)-Certain preventive maintenance, up-keeping and break down works round the clock of HP-1103 bowl mills, mill reject system, gravimetric feeders with dynamic classifier, other connected equipment and pulverized coal pipes of ... of Boiler - ...
KTPS-V stage -BM- Removal and Refixing of Insulation Rock wool mattresses,Aluminum GP Cladding either damaged or required at different elevations FG, PA and SA Ducts, ESP S, Mills, fans for Overhaul of Unit-X in 2026-27 and Removal and Re-fixing of ... of Boiler in ...
Comprehensive AMC for Goods cum passenger lift at ACHP Crusher House in CHP/KTPS V and VI Stages of M/s. Omega Elevators, Hyderabad for the year 2026-27.
Goods Transport Service – Per Trip based Service - Household/Office, Machinery & Equipment; Pickup Truck; Light Duty
Goods Transport Services - Per MT - Household/Office, Machinery & Equipment; Containerized Truck; 32 FT Single Axle
Supply, application of Cardium compound to the wire ropes and Supply , application of Grease to hoisting machinery, Filling of gear oil in Radicon chambers & dial assemblies, Cleaning of drain holes on horizontal girders and Supply ,removal and refixing of coupling bolts and rubber bushes of 19 V.C gates of O.V.P., Ramanpad, Wanaparthy (dist).
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2025 BP Srirampur-I in package III of Kothagudem Division
Providing men, material and machinery for Instant Repair team (IRT) for attending complaints like filling pot holes, clearing catchpits, carting debris / silt, replacing damaged RCC covers & frames and other miscellaneous works for a period of 7 months in 93-Banjara Hills, Cir-18 (KZ) GHMC, Banjara Hills, Cir-18, KZ,G HMC
Digging of Periphery Trench around the periphery with a size of Lx1.25M ((1.5M Top & 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2024 BP SRIRAMPUR-II & 2024 EP NAGUPALLY in package III of Kothagudem Division
Engaging of Vehicles and Machinery of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival-2021 under Chandryangutta Circle No:8, CRZ, GHMC. (Bandlaguda Temporary Transfer Station under Circle No:8)
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2025 BP Srirampur-II in package IV of Kothagudem Division
Engaging of Vehicles and Machinery of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival-2021 under Rajendranagar Circle No:11, CRZ, GHMC. (Kattedan Transfer Station under Circle No:11)
Engaging of Vehicles and Machinery of Mini Tipper(without labour), Tipper (10T), Tipper (25T), Skid Steer Loader(Bobcat) and Back Hoe Loader(JCB) on hire basis for removal of Garbage/Animal Waste in view of Bakrid Festival-2021 under Falaknuma Circle No:10, CRZ, GHMC. (Miralam Transfer Station under Circle No:10)
EXTRACTION OF 74.434 LBCM OF COAL/SHALE WITH SURFACE MINER TECHNOLOGY AND OTHER MACHINERY INCLUDING LOADING, TRANSPORTATION & DUMPING (AT THE PLACES SHOWN BY PROJECT AUTHORITIES) AND INCLUDING 10LBCM OF BLASTED COAL WHENEVER NECESSARY, RE-HANDLING OF ABOUT 6.0 LCM OF G-13 AND G-17 IN PIT-I OF KOCP-II, YELLANDU AREA.
Digging of Periphery Trench around the periphery of 2025 BP Gandugulapalli Bit-II plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. X of Sathupalli Division.
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2025 BP Nagupally-II in package II of Kothagudem Division
Digging of Cattle Proof Trench around the periphery with a size of Lx1.25M (1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket in Plantation of 2025 BP Nagupally-I in package I of Kothagudem Division
Engaging of men and machinery (IRT) for attending patch works, potholes, replacement of damaged Catchpit covers, removing debris, removing water stagnation,and other emergency works for a period of 7 months i.e. From 01-11-2024 to 31-05-2025 in Ward.No.14 BN Reddy Nagar of Hayath Nagar Circle-3, GHMC.
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1AB at TP-1 including FG floor, gallery area, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor required in MM/CHP/BTPS from 01.08.2025 or actual date of commencement of work to 30.11.2025
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1AB at TP-1 including FG floor, gallery area, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor required in MM/CHP/BTPS from 01.12.2025 or actual date of commencement of work to 31.03.2026.
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1AB at TP-1 including FG floor, gallery area, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor required in MM/CHP/BTPS from 01.08.2025 or actual date of commencement of work to 30.11.2025
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at head end area of BCN-1AB at TP-1 including FG floor, gallery area, MH-2, module-1 to 10 and tail end area at MH-1 including HGTU by head loads on to running conveyor required in MM/CHP/BTPS from 01.12.2025 or actual date of commencement of work to 31.03.2026.
Combined tender for: 1.Shifting of North side sub station for quary with gates. 2. Chain link mesh to indoor and out door sub station. 3. CC platform and elevated platform with ladder including chain link mesh and replacement of damaged sheets near ... of conveyor operator ...
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS Liner plates to the hitting areas of discharge chutes, patch welding for the conveyor BCN-9 connecting chutes at BCN-6AB, 7AB, TP-5, ILMS and Tippers in MM-III sub division of CHP/BTPS as and when required for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-7A/B, 6A/B, bunkers floor and TP- 5 area by head loads on to running conveyor and removal of coal at each floor of 6A/B, 7A/B take up pulley structure from 01.12.2024 or actual date of commencement of work to 31.03.2025
Repairs and replacement of various spare parts to existing 1 No. 18HP outdoor compressor unit for facilitating and functioning of 8 Nos 2.8TR Indoor Cassette type IVRF/BVRF (Blue star make) AC units installed in each executive chambers at 5th floor of Front administrative building block under Building and Vehicle Maintenance Sub Division in UFW Division, HMWSSB, Khairatabad.
PR 100260630 00010 M4662120090 SILENT BLOCK BUSH, SAO-MO2-SM-A3K-458-1, PR 100260630 00020 M4662110213 SHELL WEAR PLATE, BOILER
Reciprocating Air Compressors - Electric Motor Driven (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate, Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7102748 Dated : 28-01-2026 Bid Document 1/9, -- Number of days for which Bid would be auto -- extended 10 Number of Auto Extension count 3 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 17 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. 2/9 Beneficiary : The Director DMRL, P.O. Kanchanbagh, Hyderabad-500058 (Director)
drive assy, water filter, fuel filter, clutch cable, speedometer sensor, tail light assy rh, selector shaft, ac compressor
HY8442080627 - BEARINGS SET -SPINDLE GEAR SHIFTER- PAMA - AS PER SPEC (Q3), HY8431350709 - BEARINGS SET- C AXIS DRIVE SYS-SCHULER - AS PER SPEC (Q3), HY8452500513 - BEARINGS SET-STEADY REST-TACCHI LATHE - AS PER SPEC (Q3)
Operation check list for current readings as per format MU R C1 23 1 of 2, Operation check list for Current readings as per format MU R C1 23 2 of 2, Operation check list for Crusher A and B as per format MU R C1 09 1 of 2, Operation check list for ... for Crusher A ... Belt Conveyor 5A ... Belt Conveyor 5A ... Belt Conveyor 1A ... Belt Conveyor 1A ... Belt Conveyor 3A ...
LENS REFLECTOR ASSY, LAMP 24V 32WD, FIXTURE FOR CHECKING HUB BEARING PLAY, FUEL INJECTION PUMP (MICO), HANDLE DOOR, POWER STEERING PUMP, TARPAULIN ASSY CANOPY, SLEEVE CYL REPARI KIT, FUEL FILTER, ASSY PULL CABLE, LIGHT BLACK OUT, STOP LIGHT SWITCH, ... FRT, AIR COMPRESSOR , ...
00010 M3400080101 HEAD, COMPRESSOR, 7-8KSC, 10- 20M3/MIN (Q3), 00020 M3460756236 T-BTD-RM: AIR RECEIVER TANK (Q3)
Engaging machinery and dismantling and reconstruction of RRB compound wall or apporach way to leakage site for arresting water supply leakage on 300mm dia MS pipe of air valve existing on 1200mm dia MS main of Phase-II Ring Main-II at RUB Alugaddabavi Mettuguda under KWS Monitoring section, SD.No.II, O&M Div.No.XI, Sahebnagar
Supply and delivery of fasteners along with hire charges of machinery for fixing of 9 Nos, 900mm dia PN 16, Butterfly and NRV (non slam check valve) valves for the 3MW HSC pump sets on delivery main at Kondapaka clear water pump house under EAM Cell, SD-IV(Electrical), Transmission Division - IV, Control room, Secunderabad
Supply and delivery of fasteners along with hire charges of machinery for fixing of 10 Nos, 900mm dia PN 16, Butterfly and NRV (non slam check valve) valves for the 3MW HSC pump sets on delivery main at Murmur raw water pump house under EAM Cell, SD-IV(Electrical), Transmission Division - IV, Control room, Secunderabad
Engaging of Machinery & Manmazdoor for Cleaning and Upkeeping of Baby pond, Providing of Pandals, Stage and Chairs, Levelling of ground for improvement of Cherlapally lake platform at Cherlapally Cheruvu in view of the Ganesh Nimajjanam-2023 in Kapra Circle-01, GHMC. (Reserved for Individual S.C. Contractors /Proprietorship Firms / Partnership Firms/ S.C. LCCS)(Rs.7.50 Lakhs)
PR 100246201 00010 M5512990209 MID SCRN PLT, CHP/MM/02, PR 100246201 00020 M5512990208 SIDE SCRN PLT, CRUSHER, CHP/MM/03, PR 100246201 00030 M5512990210 BREAKER PLATE, CHP/MM/04, 890X520MM
Providing Crusher stone dust for Bonalu festival in ward no.279 and 280 Rodamestri nagar and Jagathgirigutta in Chintal Circle-54, Quthbullapur zone,CMC (Item no.7) (Completion Period 0.5 Month)