Loading…
Loading…
5,544 results • Best match
Over hauling kit for 36months of compressor type 3HC55 of M/s Kirloskar (KPC) make 36 months replacement kit KPC Part No.0912012500. Consisting of 06 items 1) LP Cylinder Liner-0910030350-02 Nos.2) LP Piston- 0910138850 02 Nos.3) HP Cylinder-0910126550-01 No.4) HP Piston-0910138750-02 Nos.5) Oil Pump Assembly-0910050050-01 Nos.6) Oil Seal Housing-0910020500-01No.
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Asifnagar-72, cir-12, KZ, GHMC
Providing men, material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc., under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021in Golconda-67, Circle-13, KZ, GHMC (Item No.04)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Ahmednagar-74, cir-12, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Mallepally-76, cir-12, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 63-Mangalhat cir-14, KZ, GHMC
Providing men material & machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc., for a period of 7 months from 01-11-2024 to 31-05-2025 in Nanal Nagar-69, Cir-13, KZ, GHMC.
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 77-Jambagh cir-14, KZ, GHMC
Supply, Delivery and applying/filling of grease,cardium compound and lubricant oil for annual maintenance of Manjira Barrage Gates for Cleaning and applying grease to the Hoist machinery, cardium compound to wire ropes and lubricant oil in Radicom chambers of Spill way gates and B.C weir gates of Manjira Barrage under EAM Section, EAM Cell-I, Kalabgoor, O&MDivision No.VIII, Patancheru
Providing men, material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc., under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 91-Khairatabad, Cir-17, KZ, GHMC
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits and levelling of the site in plantation areas
Engaging of men and machinery (IRT) for attending patch works, potholes, replacement of damaged Catchpit covers, removing debris, removing water stagnation, and other emergency works for a period of 5 months i.e. From (01-01-2024 to 31-05-2024) in Ward.No.14B.N.Reddy Nagar of Hayath Nagar Circle-3, GHMC (Reserved for Individual ST Contractors, Proprietaryship/ Partnerships & Labour Contract Co-op Societies.)
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc., for a period of 5 months from 1-01-2024 to 31-5-2024 in 62-Jiyaguda, Cir-13, KZ, GHMC
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazaar stores to site etc ., for a period of 7 months from 1-11-2022 to 31-5-2023 in Nanal Nagar-69 ,Cir-13, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-05-2022 to 31-05-2022 in Karwan-65, cir-13, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-05-2022 to 31-05-2022 in Tolichowki-68, cir-13, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 51-Goshamahal cir-14, KZ, GHMC (RECALL)
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Mehdipatnam-70, cir-12, KZ, GHMC
Providing men material & machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc., for a period of 7 months from 01-11-2024 to 31-05-2025 in Golconda-67, Cir-13, KZ, GHMC.
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Redhills-75, cir-12, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-05-2022 to 31-05-2022 in Langer House-66, cir-13, KZ, GHMC
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazaar stores to site etc ., for a period of 7 months from 1-11-2022 to 31-5-2023 in Golconda-67 ,Cir-13, KZ, GHMC
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazaar stores to site etc ., for a period of 7 months from 1-11-2022 to 31-5-2023 in Karwan-65 ,Cir-13, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-05-2022 to 31-05-2022 in Jiyaguda-62, cir-13, KZ, GHMC
Providing men, material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc., under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 97-Somjiguda, Cir-17, KZ, GHMC
Providing men, material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc., under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 98-Ameerpet, Cir-17, KZ, GHMC
Providing men material & machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc., for a period of 7 months from 01-11-2024 to 31-05-2025 in Jiyaguda-62, Cir-13, KZ, GHMC.
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc., under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 100-Sanath Ngar, Cir-17, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-05-2022 to 31-05-2022 in Nanal Nagar-69, cir-13, KZ, GHMC
SYP- Stage II, Phase I of Sripada Yellampally Project Investigation, Design, soil exploration, design, supply, installation, testing, and Commissioning of Pumping Machinery, Transformers, Sub stations, Raising mains including Delivery cisterns etc in the upland areas of Karimnagar district from Stage II Phase I of SYP Supply and Laying of 11 KV XLPE 1000 sq.mm Incomer cables of Medaram Pump house Emergency works
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 64-Dattatreya Nagar cir-14, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Vijaynagar Colony-73, cir-12, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 78-Gunfoundry cir-14, KZ, GHMC
Digging of Periphery Trench around the periphery of 2025 BP Buggapadu-A Bit-I and 2025 BP Buggapadu-A Bit-II plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. XII of Sathupalli Division.
ngaging of men and machinery (IRT) for attending patch works, potholes, replacement of damaged Catchpit covers, removing debris, removing water stagnation, and other emergency works for a period of 7 months i.e. From (01-11-2024 to 31-05-2025) in Ward.No.19, Saroornagar of Saroornagar Nagar Circle-5, GHMC. (Reserved for Individual ST Contractors, Proprietaryship/ Partnerships & Labour Contract Co-op Societies.)
Digging of Periphery Trench around the periphery of 2025 BP Vedhanthapur-A Bit-I and 2025 BP Vedhanthapur Bit-II plantation with a size of Lx1.25M ((1.5M Top and 1.0M Bottom) x 1.0M Depth) by using heavy machinery i.e. 200LC and above excavators fitted with 0.90 cubic meters and above capacity Bucket for in Package No. XII of Sathupalli Division.
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc ., for a period of 5 months from 1-01-2024 to 31-5-2024 in 65-Karwan, Cir-13, KZ, GHMC
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in 50-Begum Bazar cir-14, KZ, GHMC
Providing men material & machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc., for a period of 7 months from 01-11-2024 to 31-05-2025 in Karwan-65, Cir-13, KZ, GHMC.
BALANCE INSULATION OF SPRAY STATION, SPRAY LINE, CBD AND IBD LINE, MILL INERT LINE, ETC OF BOILER UNIT 4 AT 4x270 MW MANUGURU THERMAL POWER PROJECT
Balance mechanical works in Mills, Feeder, APH and Fans and liquidation of punch points and attending the defects of recent COD activity in Boiler Unit-1
Deployment of agency for carrying out the L-SOFA support modification work of Boiler Unit#2 at 2X800MW NTPC TELANGANA STPP, Ramagundam, DISTRICT- KARIMNAGAR, STATE-TELANGANA.
Filling of pot holes with CC patches and Crusher stone dust and gravel at various places in Div No.54 on ocassion of Vinayaka Chavithi festival of MCK Est. cost of Rs. 0.60 Lakhs under MGF
Filling of pot holes with CC patches and Crusher stone dust and gravel at various places in Div No.35 on ocassion of Vinayaka Chavithi festival of MCK Est. cost of Rs. 1.00 Lakhs under MGF
Filling of pot holes with CC patches and Crusher stone dust and gravel at various places in Div No.6 on ocassion of Vinayaka Chavithi festival of MCK Est. cost of Rs. 1.00 Lakhs under MGF
Filling of pot holes with CC patches and Crusher stone dust and gravel at various places in Div No.53 on ocassion of Vinayaka Chavithi festival of MCK Est. cost of Rs. 1.95 Lakhs under MGF
STORAGE BAY-1 FOR CG PINION HOUSING AS PER DRAWING ALONG WITH FASTENERS (Q3), STORAGE BAY-2 FOR CG GEARBOX AS PER DRAWING ALONG WITH SLEEVE AND FASTENERS (Q3), STORAGE BAY-3 FOR EP PINION HOUSING AS PER DRAWING ALONG WITH FASTENERS (Q3)