Loading…
Loading…
5,544 results • Best match
Engaging of Machinery and manpower for cleaning works on Rajeev Highway HKR roads and other areas in RMC (under GF)
olid Waste Management Machinery and Equipment with total fabrication and required civil works for Miryalaguda Municipality under SBM/15th FC
Outsourcing services of Picking of shale/stone/timber/tramp Iron and other foreign materials from coal on running conveyor belts and coal yards at OCP1 CHP RG-3 Area
Utilization of Service Engineer for servicing of various boiler and turbine actuators of Stage I KTPP during Unit Capital Overhaul Works 2026 27 and Regular Maintenance Works
BMD-Repair works of Reheater tubes duly replacing with spool pieces as per IBR welding procedures in Boiler Reheater area during the Capital overhaul works 2026-27
BMD-Inspection and rectification of ESP fields of A,B,C and D passes of Boiler Maintenance Division, KTPP, Stage-I, During Capital Overhaul of 2026-27
TGGENCO-YTPS(5X800MW)-Up-keeping of Boiler all floors from top EL+95 meters to ground floor, Checking of operation of soot blowers (LRSB) and wall blowers (WB) round the clock and if operational failure to be rectified, Servicing of wall blowers (WB), Servicing of soot blowers (LRSB) and cleaning of LDO and HFO oil gun of Unit-2 from 01.04.2025 or from the date of commencement of the work to 31.03.2026
TGGENCO-YTPS(5X800MW)-Up-keeping of Boiler all floors from top EL+95 meters to ground floor, Checking of operation of soot blowers (LRSB) and wall blowers (WB) round the clock and if operational failure to be rectified, Servicing of wall blowers (WB), Servicing of soot blowers (LRSB) and cleaning of LDO and HFO oil gun of Unit-2 from 01.04.2025 or from the date of commencement of the work to 31.03.2026
Custom Bid for Services - 200150920, Contract for Compressors and Dewatering Pumps maintenance in TM BM/OS/AHP/CHP/MGR areas at NTPC Ramagundam for the year 2026-27 & 2027-28 Similar Category Operation and Maintenance Power House/Power Plant
Filling of pot holes with crusher stone dust and gravel at various places at Gopalpur and Durshed in Div No.4 on ocassion of Vinayaka Chavithi festival of MCK Est. cost of Rs. 2.00 Lakhs under MGF
Providing Machinery for Removal and Transportation of Ganesh Idols during Ganesh Festival for Dundigal circle 59 in Quthbullapur Zone CMC 2026
Providing Machinery for Removal and Transportation of Ganesh Idols during Ganesh Festival for Medchal Circle 60 in Quthbullapur Zone CMC 2026
Purchasing of Tree Guards and engaging required Men / Machinery for plantation for Vanamahotsavam programme in Gummadidala Municipality under MGF 2026-27
Providing Machinery for Removal and Transportation of Ganesh Idols during Ganesh Festival for Jeedimetla Circle 55 in Quthbullapur Zone CMC 2026
Ventilator for Adult & Paediatric Ventilation MSME Exemption For Years Of Experience And Turnover Yes Ventilator For Adult & Paediatric Ventilation ( 11 ) Technical Specifications * As per GeM Category Specification Specification Specification Name ... Medical Air Compressor Ventilator ... Medical Air compressor snap ... Medical Air compressor . ... Medical Air compressor . ... Medical Air Compressor should ... the compressor , ... medical air compressor unit ... medical air compressor unit ...
PR 100258084 00010 M4662120212 U-CLAMP ASSLY, SAO- MO2-SM-A3K-326-0, PR 100258084 00020 M4662120346 RAM HYRAULIC CYLDER, PR 100258084 00030 M4662110222 AIR REGULATING RING, BOILER
00010 M4641050336 COOLING PIECE, SAO-MO2-SM-A3U-053-2, Delivery Days 00020 M4641050071 PROTECTION PIPE HALF, 00030 M4641050202 SPRAY NOZZLE, SAO M02 S M A3U 003+ , BOILER
Providing Stone chips and crusher stone dust at Temples for Bonal Festivals in various places for the year (2026--27) of Ward No.190 Turkapally and ward no 191 Machabollarum in Alwal Circle(02), MMC. (Item No.1)
TSGENCO - Maintenance of Vidyut Soudha and TSSHAKTHI ERP building, Erragadda- Providing comprehensive Annual maintenance of 1.0TR split 1.5 Window/Split, 2TR split/cassette 3.0TR cassette, 4.0TR cassette air conditioner of different make, ... except compressor replacement ...
TSGENCO - Maintenance of Vidyut Soudha and TSSHAKTHI ERP building, Erragadda - Providing comprehensive Annual maintenance of 1.0/ 1.5/ 2.0 TR split, 2.0/ 3.0/ 4.0TR cassette, 5.5/ 8.3/ 8.5/ 8.75/ 16.5 TR ductable Air Conditioners of different make, ... (except compressor replacement) ...
TGGENCO - Maintenance of Vidyut Soudha and TGGENCO building, Erragadda - Providing comprehensive Annual maintenance of 1.0/ 1.5/ 2.0 TR split, 1.5/ 2.0/ 3.0/ 4.0TR cassette, 5.5/ 8.3/ 8.5/ 8.75/ 16.5 TR ductable Air Conditioners of different make, 60 ... (except compressor replacement) ...
TGGENCO-YTPS(5x800MW)-SE/EM-I/-CandI-II- Removing, Cleaning, testing and refixing of solenoid seal kits, Pressure /Vacuum switches,limit switches auto drain valves, timer based drain valves, Pressure/ Vacuum transmitters, level switches, level ... plant Compressor house ...
TGGENCO YTPS (5x800MW) CHP Carrying out the physical inspection of conveyors and chutes to give clearance for running of BCN 21A/B, BCN 22A/B, BCN 23A/B, RBCN 2A/B, TPC 2A/B, BF 5,6,7,8, BCN 24A/B, BCN 27A/B, BCN 25,BCN 26,BCN 7 ERH 1,BCN 8A/B, BCN 9A/B, BCN 10A/B, BCN 11A/B, BCN 12A/B, BCN 13A/B, BCN 14A/B, BCN 15A/B for ensuring uninterrupted coal unloading for further feeding to Unit 1 and 2 Bunkers or stockyard for a period of 30 days from actual date of commencement during the FY 25 26.
For Empanelment of Manufacturers / Cooperatives / Vendors / Suppliers at the Hyderabad Agricultural Co-operative Association (HACA) Ltd Hyderabad for supply of Printing Stationery Office Furniture Office Equipment Food grains Food commodities Edible ... / Machinery / ...
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits and levelling of the site at at 2020 EP Rangampalli (1994) plantation areas
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package-21)
Providing men, material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 7 months Days from 1-11-2022 to 31-05-2023in 100-Sanath Nagar, Cir-17, KZ, GHMC (Item No.04)
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazaar stores to site etc ., for a period of 7 months from 1-11-2022 to 31-5-2023 in Langer House-66 ,Cir-13, KZ, GHMC (Reserved for Wadderas /Sagaras)
Providing men material &machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazaar stores to site etc ., for a period of 7 months from 1-11-2022 to 31-5-2023 in Tolichowki-68 ,Cir-13, KZ, GHMC (Reserved for STs)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (package-2)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package-22)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package -11)
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-05-2022 to 31-05-2022 in Golconda-67, cir-13, KZ, GHMC (Reserved for SCs)
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits and levelling of the site at 2020 EP Pentlam (1978) plantation areas
Providing men,material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc.,under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Gudimalkapur-71, cir-12, KZ, GHMC (Reserved for SCs)
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits and levelling of the site at at 2020 EP Kankur (1994) plantation areas
Providing men material & machinery for replacement of catchpit covers and frames ,BT Patch work, filling of potholes,clearing road side silt ,clearing choukages of SW drains, carting of silt/debris and transportation of BT From Chudi bazar stores to site etc., for a period of 7 months from 01-11-2024 to 31-05-2025 in Tolichowki-68, Cir-13, KZ, GHMC. (Reserved for STs)
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits and levelling of the site at at 2020 EP Wailal (1998) plantation areas
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package - 24)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e., excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package - 22)
Uprootal of stumps , tilling over the entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.9 cum meters and above capacity bucket, collectiion and removal of all available uprooted stumps of all sozes, dragging to outside the plantation area and stacking, filling the resultant pits with soil and levelling pf the site in the plantation area ( package xvii|)
Uprootal of stumps and tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket and collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits and levelling of the site at at 2020 EP Gurjala (1987) plantation areas
Providing men, material & Machinery for Instant Repair Team for Motorable Roads including BT/CC patch work, filling of pot holes, carting of silt / debris and transportation of BT from Chudi bazar stores to site etc., under intensive pothole free programme for a period of 20 Days from 10-11-2021 to 30-11-2021 in Tolichowki-68, Circle-13, KZ, GHMC (Item No.05)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package-4)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas(Package-10)
Engaging of men and machinery (IRT) for attending patch works, potholes, replacement of damaged Catchpit covers, removing debris, removing water stagnation, and other emergency works for a period of 7 months i.e. From (01-11-2024 to 31-05-2025) in Ward.No.20, R K Puram of Saroornagar Nagar Circle-5, GHMC. (Reserved for Individual SC Contractors, Proprietaryship/ Partnerships & Labour Contract Co-op Societies.)
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package-1)
Providing men,material & Machinery for Instant Repair Team for replacement of catchpit covers and frames, BT patch work, filling of pot holes, clearing road side silt, clearing choukages of SW drains, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc., for a period of one month from 1st May-2021 to 31st May-2021 in Jiyaguda-62, Cir-13, KZ, GHMC
Uprootal of stumps, tilling of soil over entire area to a depth of 0.45 m using heavy machinery i.e. excavators fitted with 0.90 cubic meters and above capacity bucket, collection and removal of all available uprooted stumps of all sizes, dragging to outside the plantation area and stacking, filling of resultant pits with soil and levelling of the site in plantation areas (Package-8)
Providing men,material & Machinery for Instant Repair Team for replacement of catchpit covers and frames, BT patch work, filling of pot holes, clearing road side silt, clearing choukages of SW drains, carting of silt / debris and tranportation of BT from Chudi bazar stores to site etc., for a period of one month from 1st May-2021 to 31st May-2021 in Karwan-65, Cir-13, KZ, GHMC