Loading…
Loading…
5,542 results • Best match
Providing Men and Machinery for Instant Repair team (IRT) for attending, CC Patches and Cross Cuttings for a period of 8 days in Mehdipatnam-70, Ward-12 area, Cir-12,KZ, GHMC (Item No.01)
Providing Men and Machinery for Instant Repair team (IRT) for attending, CC Patches and Cross Cuttings for a period of 8 days in Redhills-75, Ward-11 area, Cir-12,KZ, GHMC (Item No.08)
Engaging of Mini Mobile Monsoon Emergency teams of (04) nos and machinery (JCB, Hitachi & Breakers) for the year 2022 in Ward No.107, 108, 109 & 110 in Chandanagar Division.21, SLPZ, GHMC (Item No.3)
Providing of Men, Materials & Machinery for Instant Repairs Team (IRT) for period of 6 months from Nov 2019 to April 2020 in Ward-92-Venkateshwara colony ward, Cir No.18 (CZ) GHMC (Item No.1)
Estimate for Providing, Men, Material & Machinery for instant Repair Team for a period of 3 months i.e (01/06/2020 to 31/08/2020) in Goshamahal Division, Circle- 14, KZ, GHMC. (Rs. 6.80 Lakhs) (Recall)
Repairs and maintenance of road, footpath and storm water drains by engaging men & machinery and material from Jubile hills check post to Madhapur from the month of February - 2020 to April - 2020 in corridor-III
Providing of machinery and labour (24hours) for clearing debris and garbage at various places in Serilingampally Circle-20, Slp Zone , GHMC. In view of 72nd Miss world Festival (May 7 th to May 31st) - 2025.
Providing, Men, Material & Machinery for instant Repair Team for a period of 12 months in 101-Erragadda division and 102 -Rahemath nagar division in Division 19, SLZ,GHMC (Reserved for SC, ST, Waddera Labour societies)
Repairs and maintenance of road and storm water drains to avoid water stagnation by engaging men & machinery and material from Malakpet Metro Station to Nampally Metro Station for the year 2018-19 in Corridor-I
Providing lane marking and studs from Tolichowki junction to Golconda fort (On the occasion of Global Enterpreneur Sumit) under Tolichowki-68, Div.13, CZ, GHMC (Only for those who have own machinery of lane marking)
Engaging of JCB & Tractor With Trally and Dozer with labour and other machinery in W No 33 to 38 in Sangareddy Municipality for Pattana Pragathi 4th Phase Programme under PP/Municipal General Funds 2022-23
Engaging of JCB & Tractor With Trally and Dozer with labour and other machinery in W No 1 to 8 in Sangareddy Municipality for Pattana Pragathi 4th Phase Programme under PP/Municipal General Funds 2022-23
Engaging of JCB & Tractor With Trally and Dozer with labour and other machinery in W No 25 to 32 in Sangareddy Municipality for Pattana Pragathi 4th Phase Programme under PP/Municipal General Funds 2022-23
Engaging of JCB & Tractor With Trally and Dozer with labour and other machinery in W No 17 to 24 in Sangareddy Municipality for Pattana Pragathi 4th Phase Programme under PP/Municipal General Funds 2022-23
Desilting of open Major nala from Opp. BSNL Office to Skill Arcade Srinagar Colony Main Road Using Machinery (Throughout the year 2022) in 97-Somajiguda division, division-17, KZ, GHMC (4th call) (Item No.02)
Providing, Men, Material & Machinery for instant Repair Team(IRT) for attending BT/CC Potholes /Patch work for a Period of (20) Days in 92- Venkateshwara colony,Cir-18, KZ, GHMC (Item No.1) 1st RECALL
Providing Men and Machinery for Instant Repair team (IRT) for attending, CC Patches and Cross Cuttings for a period of 8 days in Asifnagar-72, Ward-12 area, Cir-12,KZ, GHMC (Item No.03)
Package: Annual desilting of Major, Minor Nalas, SW Drains with machinery, manual and bucket cleaning in 79-Himayathnagar, 80-Kachiguda, 81-Nallkunta, 82-Golnaka, 83-Amberpet, 84-Bagh Amberpet in Amberpet Circle-16, SBZ, GHMC.
Providing Men material & machinery for instant repair Team (IRT) for a period of 4 months i.e., from 01-11-2021 to 28-02-2022 in Ward 94-Shaikpet Cir-18 (KZ) GHMC (Item No.3)
Engaging of JCB & Tractor With Trally and Dozer with labour and other machinery in W No 9 to 16 in Sangareddy Municipality for Pattana Pragathi 4th Phase Programme under PP/Municipal General Funds 2022-23
Premonsoon desilting and annual Maintenance of Major open nala (by machinery) from Sangrilla school to HUDA park and kandak at mothi darwaja in Golconda-67, Div-13, (KZ), GHMC for the year 2021 (1st Recall)
Providing Machinery and material for Monsoon Grievance cell complaints (Mini Mobile Monsoon Emergency Teams) of ward no.104 & 111(P) in Serilingampally Circle-20, SLP Zone, GHMC for the year 2024 (ITEM-01)(2nd call)
Providing of Men, Materials & Machinery for Instant Repairs Team (IRT) for period of 6 months from Nov 2019 to April 2020 in Ward-93- Banjara Hills ward, Cir No.18 (CZ) GHMC (Item No.2)
Premonsoon desilting and annual Maintenance of nala (by machinery) at Virasath Nagar Colony outlet and Nadeem Colony culvert & Shah Hatim tank outlets in Tolichowki-68, Div-13, (KZ), GHMC for the year 2021 (2nd Recall)
Annual Desilting and Annual maintenance of nala (by machinery) of BalkapurNala from Salar Bridge to 9-4-57/6/B in Nizam colony-129,Golconda circle-32(GZ),GHMC for the year 2026(2nd Recall)
Over hauling Kit (36 Months) of Compressor type 3 HC 55 of M/s Kirloskar make: 36 months replacement kit KPC Part No. - 0912012500. Consisting of 06 items. (Full Description is as per Annexure enclosed in the documents).
Over hauling kit for 54 months of Compressor type TRC 1000DCM of M/s ELGI make: Sl. No.1. Piston with Gudgeon Pin Dia -106 - 000477710 - Qty. 02Nos. 2. Piston with GP Dia 84 - 000477760 - Qty. 01No. 3
Set of items for Under Slung Mounted Auxiliary compressor of Type CRC-150. 1. Oil Seal DIA 60 of part no: 070411930---02 Nos. 2. Brush Holder Spring L1 of part no: 070411920---04 Nos. 3. Rubber Bush
IC-II Overhauling kit for HP Disc valve of TRC 1000 MN/ UG compressor of make - ELGI. Set consists of 3 items. (1) Suction valve spring. Part No: 000424350 - Qty/Set - 2 Nos. (2) Packing for 60 m
Piston (100mm) and Circlip assembly for Elgi Main Compressor Model TRC 1000 MN consisting of 2 Items: 1. Piston assembly 100 Dia With Gudgeon pin to ELGI Part No. 00 04 7777 0 Qty./Set:1 No. 2.
Piping 3D modelling (using SP3D version 2016 software) offloading for GAIL-Usar-Membrane- Feed Compressor (MCA1076) and GAIL-Usar-Propylene Compressor (MCA1077)
Removal of accumulated ash and Debris in pent house Drum deck area Dog House S Panel houses of gooseneck area ceiling girder Beams area on top of the boiler Pent house Buck stay Beams from 1st floor During the unit -9 overhaul period.
Dismantling, Servicing, Repairing and transporting of Coal and Oil Burner Assemblies, Burner Tilt Mechanism, Secondary Air dampers for all Four Corners and Removal and Re-erection of P.F. bends for Unit XI Boiler KTPS VI Stage, during the Capital Overhaul period 2021-22.
KTPS-VI Stage-BM-Online arresting of gland leaks, steam/feed water leaks from various HP/LP valve flanges while unit is in service pertaining to Unit-11/Boiler Maintenance of KTPS-VI stage as and when required during the year 2025-26
Lifting and Transportation of Mill rejects collected on the ground from mill pits and mill around area to reject Stockyard of mill reject system in Boiler Maintenance Division (1X500MW) for a period from 01.04.2025 or from actual date of utilization to 31.03.2026
Repair works of Economiser zone, duly replacing the damaged portions with spool piece/bends as per IBR welding procedure in Unit XI Boiler of KTPS VI Stage (1X500MW) as per field requirement in Unit-XI during Annual Overhaul for the FY 2023-24
BMD- Lifting and Transportation of mill rejects collected on the ground from mill pits , mill trenches, sumps and mill around area to reject stockyard of mill reject system in boiler maintenance division 1x500MW for aperiod from actual date of utilisation to 31.03.2023
BMD- Transportation of mill Reject ground coal from mill pits and mill around area to reject coal stockyards of mill reject system in Boiler Maintenance Division (1x600 MW) for a period of one year from 01.04.2018 or actual date of utilization to 31.03.2019.
Overhauling of Boiler feed pump Booster pump and Hydraulic Coupling, Inspection of DE and NDE bearings of BFP and BP etc Cleaning of BFP Working and Lube oil coolers in Units-1and 2 as and when required during the year 2024-25
Dismantling, Servicing, repairing, transportation of coal & oil burner assemblies, burner tilt mechanism, secondary air dampers for all four corners and removal and re-erection of P.F bends of Unit-XI boiler KTPS-VI Stage during the annual overhaul for the FY 2023-24
KTPS VI Stage BM Engaging tractor including carrier along with driver for transportation of Mill Rejects materials in Boiler Division and transportation of materials in CAM Division of KTPS VI Stage 1X500MW as and when required during the financial year 2026 2027
Carrying out the installation of load cell and Spherical Washer arrangement at Row A (Furnace Front wall panel 8 Nos Support location) Row K (Furnace Rear wall panel 8 No Support location) in all respect at Boiler Unit-1 of 2X800MW NT
Supply, delivery and fixing of new 1.5 TR high wall mounted split AC unit, copper piping and other accessories at O/o Director (Projects-1) anti room along with, PCBs, Compressors, Nitrile Rubbers insulation for the copper piping of VRF AC units of front admin. block under building and vehicle maintenance Sub Division in UFW Division.
Smart TV 65 inch for Compressor Test Facility
Pt.No.35112040, Silicon O Ring Pt.No.35360540H, Silicon O Ring for Un loader Piston Pt.No.35360540H, Connecting Rod Crank Shaft Assembly Pt.No.211702, GP Bush 100mm dia Pt.No.321210, Piston Assembly 100mm dia Pt.No.477770, Valve Plate Finger type 100mm dia Pt.No.330970, Cylinder 70mm dia Pt.No.210090, Piston Ring Sets 70mm dia Pt.No.22401049, Internal Circlip B18 Pt.No.917218, Internal Circlip B20 Pt.No.917220, Valve Cone Guide Pt.No.20491279, Fan Pulley Pt.No.20351170, Connecting Rod Crank Shaft Assembly Pt.No.211307, Piston Assembly 100mm dia Pt.No.20494560, Piston Assembly 60mm dia Pt.No.413120, Piston Ring Set 100mm dia Pt.No.22401059, Piston Ring Set 60mm dia Pt.No.22401039, Valve Plate Finger type 60mm dia Pt.No.330950, After Cooler Pipe with Ermeto Cons Pt.No.333720, Inter Cooler Pt.No.310091, Diaphram for Breather Pt.No.510060, Dry type filter elements Pt.No.317820, Packing Ring 30 x 38 x 2mm Pt.No.521910, Oil Level Indicator Pt.No.513440, Assembly Crank Shaft Complete Pt.No.32293565, Connecting Rod Assy Pt.No.32004152, Cylinder Pt.No.32293540, Cylinder 2.5 Pt.No.32247652, Piston Air Complete Pt.No.32293516, Piston Air Complete Pt.No.32293532, Set Piston Ring HP Pt.No.32307910, Set Piston Ring LP Pt.No.32307928, Assy. Valve Plate HP Pt.No.32310799, Assy. Valve Plate LP Pt.No.32248205, Valve Finger Inlet HP Pt.No.32236671, Valve Finger Discharge HP Pt.No.32241010, Valve Damper Discharge HP Pt.No.32295479, Valve Finger Inlet LP Pt.No.32248130, Valve Finger Discharge LP Pt.No.32248155, Valve Damper Discharge LP Pt.No.32294464, Tune Up Kit Pt.No.70241955, Valve Relief 60 PSIG Pt.No.70243245, O Ring Valve Plate High Pressure Pt.No.32246878, Element Filter Pt.No.32170979, Elbow Tube Pt.No.95031761, Gasket Set Pt.No.32301434, Assembly Connecting Rod, Piston complete Assembly, Set Piston Ring Pt.No.W114364T17, Set Piston Ring Pt.No.W114364T37, Check Valve Assembly Complete, Gasket Set
Awarding of Service contract for Loading and Transportation of Uncrushed coal from PKOC-II West Coal Yard to KCHP (i.e., SCCL Surface Crusher on B-Belt) on Wight basis with Single point weighment at unloading point i.e., on Clean Coal Weight Bridge (Global Washery) near KCHP for a period of one (1) year - Reg.
RDS-Repairs and Reconstruction of OT sluices and shuttering arrangements to D-37 at Km.127.80 on RDS canal (includes EM parts, Gate, Hoist with gear box Mechanism) in Undavelly (M), Jogulamba Gadwal District
Engaging of Dewatering pumps, UGD Cleaning Compressor for sanitation activities as a part of 100 Days Action plan in all 1-20 wards in Devarakonda Municipality under 15th finance / MGF grants (Reserved for Waddera/Sagara/ Uppera Socities or Individuals)
Set of spares for ELGI Main Compressor Model TRC 1000 MN consisting of 04 items. (1) Low Pressure (LP) cylinder to Elgi Part No.00 02 1010 A, Qty/Set 02 Nos. (2) High Pressure (HP) cylinder to Elgi
One Set Consisting of 4 items: 1)Pusher with nut for Compressor Side Coupling to ELGI part no. 000427400- 01 No. 2) Pusher with nut for motor size to ELGI part no.000427420-01 No. 3)Space flange for