Loading…
Loading…
5,543 results • Best match
Set of end covers for Auxiliary compressor of model CRC 150 of M/s. ELGI make as follows. Set consisting of 02 items. (1) Front Cover as per M/s. ELGI Part No. 3FCC104100. Qty/ set = 10 Nos. (2) R
Over hauling kit for 36 Months of Compressor type TRC 1000DCM of M/s ELGI make. (1) LP Cylinder with liner part No. 070301440 Qty 1No. (2) Cylinder HP Side 84 Dia part No. 000218840 Qty 1 No. Offer Ac
Over hauling kit for (54 Months) of Compressor type TRC 1000 DCM of M/s ELGI consisting of 10 items 1) 000477710 Piston with Gudgeon pin dia 106 - 2 Nos. 2) 000477760 Piston with GP dia 84 - 1 No 3
Safety sling for main compressor of WAG9/WAP7 locos as per Rly Drg.No.C/ELS/LGD/Aux/4/39 Alt-1 along with U clamps 4 Nos. per sling and Hex Head bolt M16x65 (steel En24). - 4 Nos. per sling and other
VFD COMPRESSOR UNIT 7.6 KVA OF MEDHA PART NO : SP675UV2101041, INPUT : 415 V AC +/-10 %, 50 HZ, OUTPUT : 173 V AC TO 380 V AC, 20 AMPS,30 HZ TO 100 HZ, TYPE: MAE675UV2-VFDCOMPRESSOR OF M/S. MEDHA SERV
MAIN COMPRESSOR 1745 LPM WITH MOUNTING ACCESSORIES ALONG WITH MOTOR AS PER RDSO SPEC No. 1) RDSO/2018/EL/SPEC/0137 REV-0 or latest. 2) SPEC/E- 10/3/09 MOTOR WITH AMENDMENTS Nos. 01 to 06 or latest.
Removal and Refixing of Insulation Rock wool mattresses Aluminium or GP cladding either damaged or required at different elevations of FG PA and SA Ducts ESPs Mills and fans piping systems and Main Boiler Area for Unit IX andX during the year 2024-25.
BMD-I - Transportation of Mill Reject ground coal from mill pits and mill around area to rejects coal Stockyards for mills A to G of mill rejects system in Boiler Maintenance Division(1X500MW) for a period from 01.04.2020 or actual date of utilisation to 31.03.2021.
Repair Works of Economiser Zone, duly replacing the damaged portions with spool piece/bends as per IBR welding procedure in Unit XI Boiler of KTPS VI Stage(1x500MW) as per field requirement in Unit-XI during Capital Overhaul period for the year 2021-22.
BMD- Transportation of mill Reject ground coal from mill pits and mill around area to reject coal stockyards of mills A to H of mill reject system in Boiler Maintenance Division (1X600MW) for a period from 01.04.2020 or actual date of utilization to 31.03.2021
KTPS VI Stage BM Removal and Re-fixing of insulation including Cladding on Boiler and its auxiliaries in Unit11 of KTPS VI stage as and when required for the period from 01 04 2026 or from the date of commencement to 31 03 2027
KTPS VI Stage BM Online arresting of Gland leaks, steam/feed water leaks from various HP/LP valves and flanges while unit is in service pertaining to Unit XI Boiler maintenance of KTPS VI Stage as and when required during the year 2026 27
Providing of Men, Materials & Machinery for Instant Repairs Team (IRT) for period of 5 months from 01-11-2019 to 31-03-2019 in Ward-95-Jubilee Hills ward, Cir No.18 (CZ) GHMC (Item No.4)
Providing, Men, Material & Machinery for instant Repair Team (IRT) for a period of 4 Months in 96- Yousufguda division, 99-Vengal rao nagar division and 101- Erragadda division in Cir-19, SLPZ, GHMC (Reserved for ST Communities)
Construction of Model Inspection and Certification Center for Vehicle Fitness at Malkapur Village, Choutuppal Mandal, Nalgonda District (Balance Work: Construction of Equipment Pits to Internal Machinery of Model Inspection and Certification center for Vehicle Fitness (3rd call).
Premonsoon Desilting And Annual Maintenance Of Balkapur nala (by machinery) from Old KGN to 9-4-4/13/14/C in Under Nanal Nagar -69,Ward -9, cir-13, KZ,GHMC. (for the year-2021) (2nd Recall)
Engaging monsoon teams and vehicles JCB, DCM, Tractor, Labour, Materials and Machinery for the period of 5 months i.e. from 01.06.2024 to 31.10.2024 in for wards 128 and 129 of Gajularamaram circle 26 Circle GHMC(2nd call)
Annual Maintenance of SW Drains/ Open Nalas at various places, Open Nala at MM Pahadi, Open Nala at Akbari Masjid to NPA wall at Indranagar in Ward No. 57- Sulemannagar in Rajendranagar Circle, GHMC (By Machinery) (Recall)
Engaging of vehicles and machinery of mini tipper, JCB, 10 Tonner tipper and bobcat on hire basis for removal of garbage/animal waste in view of Bakrid festival 2023 for circle - 6 Malakpet of Charminar zone, GHMC
Estimate for providing Men, Material & Machinery for instant Repair Team for a period of 3 months i.e., (01/06/2020 to 31/08/2020) in Jubilee Hills, Cir No.18 (CZ) GHMC (Item No.1) 1st RECALL
Engaging of Mini Mobile Monsoon Emergency teams of (1)nos and machinery (JCB & Hitachi & Breakers) for the year 2023 in Ward No.110 in Chandanagar Division-21, SLP Zone, GHMC - Re Call (Reserved for Waddera / Sagara communities)
HORIZONTAL CONVEYOR BELT BUCKET ELEVATOR PIPING DRIVES ERECTION AND COMM WORKS FABRICATION WORKS
1- PGB SPECIAL OIL-ISO VG 320 2- OIL FOR DC GEARBOX 3-SERVOGEM HTXX GREASE 4- GREASE FOR DRIVE ASSY OF DC
BTPS - CHP - Cold and Hot vulcanization belt joints, pulley lagging for the conveyors BCN-1A/B, 2A/B, 3A/B Reclaim belt conveyors and Dribble Feeders as and when required in MM-I sub division of MM/CHP/BTPS for the period from 01.04.2026 or from the actual date of commencement of work to 30.09.2026.
Carrying Out Floor Finishing Works at 30mtrs, 55mtr 61mtrs Boiler Unit-1
Out sourcing for Manufacturing of 20mm dia. Roof Bolts using SCCL Machinery at Central Workshop on piece rated basis along with supply and fixing of Nut ,Domed washer and Conical seat-through critical mode e-Reverse auction-reg.
PJP Supply and Application of Grease to the Hoist Machinery and filling of Gear Oil in Radicon chambers and Dial Assemblies of Radial Crest Gates P.J.P.Dam, Revulapally (V), Dharoor (M), Jogulamba gadwal (Dist) for the year 2023-24
Engaging of vehicles and machinery of mini tipper, JCB, 10 Tonner tipper and bobcat on hire basis for removal of garbage/animal waste in view of Bakrid festival 2023 for circle - 7 santosh nagar of charminar zone, GHMC
Annual Maintenance (Desilting) of Laxmi Nagar nala and Public garden nala using Machinery Hydraulic Excavator (JCB) in 75-Red Hills, ward No.11, Div-12, Circle-12, KZ, GHMC for the year 2022. (item No.2) (7th Recall)
Desilting and Annual Maintenance of Open Major and Minor Nala from Swarnajayanthi Complex to Begumpet MMTs Railway Station, Leela Nagar Using Machinery (hydralic excavator ) and mannual throughout the year 2020 in 98-Ameerpet Division, Circle - 17, KZ, GHMC.
Annual Desilting and Annual maintenance of nala (by machinery) of Balkapur Nala from Salar Bridge to 9-4-4/13/14/C,Patel Gully in Nanal Nagar-69,Div-13(KZ),GHMC for the year 2025(Item.No.22)
Surveillance system with CC TV Cameras at PK OC -II, Manuguru as Pilot project to capture the visuals of HEMM machinery & human movements in quarry and mining Areas under BOO concept for a period of 3 (three) years.
Engaging of Vehicle and Machinery for Handling and Immersion of Ganesh Idols for the Year 2023-24 at Various Lakes and Ponds in Hayathnagar Circle-3, L.B. Nagar Circle-4 & Saroornagar Circle-5 of LB Nagar Zone, GHMC.
Engaging of Vehicle and Machinery for Handling and Immersion of Ganesh Idols for the Year 2022-23 at Various Lakes and Ponds in Hayathnagar Circle-3, L.B. Nagar Circle-4 & Saroornagar Circle-5 of LB Nagar Zone, GHMC.
Providing machinery and labor (24 hours) for clearing debris and garbage at Road No.s 40,41,44, 45,36 ,56 Jubilee Hills & Road No.2 ,12 Banjara Hills for a period of 3 months in Cir-18, Jubilee Hills , (KZ), GHMC.
Engaging of Mini Mobile Monsoon Emergency teams of (01) nos and machinery (JCB, Hitchi & Breakers) for a period of 5 months i.e. from 01.06.2024 to 31.10.2024 in Ward No.109 Hafeezpet in Chandanagar Division-21, SLP Zone, GHMC
DESIGN, SUPPLY , FABRICATION, ERECTION and COMMISSIONING OF CBIP MAKE (IMPORTED) P-15 SCREW PRESS, DIGESTER CAP 4500LTRS ALONG WITH HYDRAULIC POWER PACK (DOLPHIN), STRUCTURAL PLATFORM, INLET AND RETURN CONVEYOR EXTENSION INCLUDING ELECTRICAL CABLE AND ACCESSORIES FOR OUR OIL PALM PROCESSING PLANT AT APPARAOPET, BHADRADRI KOTHAGUDEM DIST TELANGANA STATE, India
Removal of spilled over coal, fine dust and wet coal at tail end head end along the BCN-7A/B, 6A/B head end, gallery, bunkers floor and TP-5 area by head loads on to running conveyor from 01.12.2025 or actual date of commencement of work to 31.03.2026.
Laying, Erection and Commissioning of 3.3KV OHT lines along proposed new Belt Conveyor System, in Pit Crushers, GL Bunker and PWWLS at OCP, SRP Area on Rate Contract (Value Contract) basis for a period of 18 months as per the Scope of work, Terms and Conditions of NIT
BTPS - CHP - Removal of spilled over coal fine dust and wet coal at tail end, head end, along the BCN-7A/B, 6A/B, bunkers floor and TP-5 area by head loads on to running conveyor from 01.08.2024 or actual date of commencement of work to 30.11.2024
Kaleshwaram Project Link IV Parallel conveyor system Package no 1 Lifting of 333 cumecs of water from Mid Manair Reservoir to Ananthagiri Reservoir comprising construction of approach channel Gravity Canal forebay open pump house EM and HM works pressure mains delivery cistern including CM and CD works etc
Kaleshwaram Project Link IV Parallel Conveyor System Package No 2 Lifting of 333 cumecs of water from Ananthagiri reservoir to Delivery Cistern at Chinnagundavally Village comprising of construction of approach channel forebay open pump house EM and HM works pressure mains delivery cistern including CM&CD works etc
Removal of spilled over coal, fine dust and wet coal at tail end head end along the BCN-7A/B, 6A/B head end, gallery, bunkers floor and TP-5 area by head loads on to running conveyor from 01.12.2025 or actual date of commencement of work to 31.03.2026.
Cleaning, Painting and Arts letter writings of Surface installations i.e, Main mechanical ventilation fans, Coal Bunkers, Support Girders, Haulers, Belt Conveyor Units, Gantries etc. at various Mines and Departments of SRP Area for a period of TWO YEARS as per the Scope of work, Terms and Conditions of NIT
BALANCE DISC SEAT Part No.602, Model HDB125 BY 10 Make KSB Pumps Pump Sl.No.419012-17, BALANCE DISC, Part No.601, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, CASING WEAR RING SUCTION SIDE, Size 200 X 215 X 25 MM, Part No.502.1, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, IMPELLER SUCTION STAGE, Size HDB125 BY 10 340 X 19 MM, Part No.231, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, IMPELLER STAGE, Size HDB125 BY 10 340 X 20.5 MM, Part No.230, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, SHAFT WITH KEYS Part No.210, Model HDB125 BY 10 Make KSB Pumps, Pump Sl.No.419012-17, SPACER SLEEVE Size 78 X 94.7 DIA X 93 MM, Part No.525, Model HDB125 BY 10 Make KSB Pumps, Pump Sl.No.419012-17, SET OF GASKET AND O RINGS SET OF 14 NOS PART NO.99-9, MODEL HDB 125 BY 10, MAKE KSB PUMPS, PUMP SL NO.419012-1, O RING Size 110 X 4 MM Part No.412, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, O RING Size 185 X 4.5 MM, Part No.412, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, O RING Size 280 X 4 MM, Part No.412, Model HDB125 BY 10 Make KSB Pumps, Pump Sl.No.419012-17, O RING Size 250 X 5 MM, Part No.412, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17, SPACER SLEEVE BLIND STAGE, Size 78 X 91.7 DIA X 105 MM, Part No.525, Model HDB125 BY 10, Make KSB Pumps, Pump Sl.No.419012-17
Metal Filling and Skimming of Disc Front Brake, Metal Filling and Threading of Side Gear Box Shaft, Overhauling of Engine Assy, Metal Filling and Surfacing of Cyl Head Assy, Grinding of Exhaust Valves, Grinding of Inlet Valves
O and M Replacement of Shutters D 59 A and gear box of D 59 Old on Nizamsagar main canal Supply and application of grease to automatic flood gates of Masani tank in Mugpal Mandal Nizamabad District
Complete Overhauling of Gear Box Assy, Rectification of Pulling Power of Eng Assy, Rectification of Oil Leakage from Crank Shaft, Change of all belts Rectify Rear Break Jam, Rectification of new Rear Bumper Assy and Bumper Pads
Seal Plate Seal Carrier Ring Bottom of HIP A100 System, Gas Compressor Rod Seals of HIP A65 System, Gas Compressor Rod Seals of HIP A100 System
Transportation of mill reject Coal from reject hopper of stage-I to stock yard of mill rejects and trench cleaning of mills A to G in Boiler Maintenance Division (1X500MW) for a period from 01.04.2025 to from actual date of utilization to till Date of completion