Loading…
Loading…
5,543 results • Best match
Providing Men, Material,& Machinery for Replacement of catch pit covers and frames, filling of pot holes, clearing road side silt, clearing choukages of SW Drains, for a period of 2 months at Jillelguda area in Meerpet Municipal Corporation Under 2023-24
Hiring of JCB (bucket/ breaker), Hitachi and other machinery for dismantling works under town planning, sanitation works and other emergency works in Manikonda Municipality under MGF 2025-26. (Specifically for attending to damages occurring during and after the monsoon period)
CHIP BRUSH B3101-STEEL, HYDRAULIC MOTOR-OML-8, CONVEYOR CHAIN WITH ANGLES PRE MOUNTED, SCRAPER
MANUFACTURING, INSPECTION. TESTING, PACKING SUPPLY, I&C OF BA COMPRESSOR SYSTEM
Dismantling the Reciprocating type compressor with 115 TR capacity chiller package
Supply and Installation of Evacuation Compressor at Indane Bottling Plant, Thimmapur
HT India HEA ignitor spares for Auxillar
RDS-SUPPLYING AND FIXING OF SHUTTERS GEAR BOX WITH SCREW ROD AND THREADING CHARGES FOR OT SLUICES D/24 ANDWALKWAY BRIDGE @ KM. 43.00, KM.67.700,KM. 74.400 AND KM.83.400 OF RDS MAIN CANAL IN WADDEPALLY (M), JOGULAMABAGADWAL DISTRICT
KTPS-VI Stage -BM- Repair Works of Economizer Zone duly replacing the damaged portions with spool piece/bends as per IBR welding procedure in Unit XI Boiler of KTPS VI Stage(1x500MW) as per field requirement in Unit-XI during Annual Overhaul period for the year 2025-26
WATER BOILER OF 30 LTRS CAPACITY FOR HOT BUFFET LHB TYPE COACHES GENERALLY CONFORMING TO IS:3412 ALONG WITH CONTROL BASE & NECESSARY PLUMBING & TAP ARRANGEMENT ON A COMMON BASE PLATE CONFORMING TO RCF'S SPECIFICATION NO EDTS-118, REV-'E' OR LATEST & DRG. NO. LH 72221 ALT-'a' OR LATEST
Set of items for ELGI make Main Compressor type RR 10070 OF consisting of 3 items.1. Ring over lap dia 85 TS10/15OF Part No. B016806960003-4nos.,2. Ring gas tight dia110 TS10 OF Part No.B016806960007-2nos.,3. Breather valve assy Part No.A020030-1no.
Additional safety sling for compressor to loco body on Soft mount side of 3 phase electric loco as per ELS/LGD Drg. No. C/ELS/LGD/Aux/3/43 Alt-1 ref no.1 to ref no.9. For set details see attached annexure.
Additional safety sling for compressor to loco body on Soft mount side of 3 phase electric loco as per ELS/LGD Drg. No. C/ELS/LGD/Aux/3/43 Alt-1 ref no.1 to ref no.9. For set details see attached annexure.
Replacement of existing damaged Air Tee mani fold pipe along with sluice valves and Air valves with new Air Tee manifold pipe along with new 200mm dia sluice valves and Air valves existing on 2200 mm dia MS Pumping Main of KDWSP Phase-I at canal off ... valve gear box and ...
Supply, Trnasportation and Delivery Trommels, Air Blower (1500 CFM), Shredder (Twin Shaft Shredder), Twin Box Bailing Machine, Dry Waste Shredder (TPH), Windrow Turner, Weigh Bridge, Magnetic separator, Sorting Conveyor Belt System 50 TPD, Installation of Solar Systems and Annual operation and Maintenance (O and M) in Siddipet Municipality under SBM Grants (Recall)
ANNUAL MAINTENACNE OF AUXILIARY BOILER FOR THE YEAR 2023 AT MAIN PLANT OF HWPM
Clutch Plate Assy, Clutch Master Cyl Assy, Element Oil Filter, Universal Joint, Relay Solenoid Eng Starter Electricals, Main Relay, Gear Box Gasket Kit Coprisin, Kit For Selector Shaft Consisting, Catridge Lub Oil Filter, Relay, Assy Cable Complete, Clutch Release Bearing
Goods Transport Service – Per KM Based Service - Construction Material, Vehicles, Textile Goods, Machinery & Equipment; Truck with Trailer; 20 Ton, Machinery & Equipment; Truck with Trailer; 40 Ton, Goods Transport Service – Per KM Based Service - ... - Machinery & ...
Goods Transport Service – Per KM Based Service - Construction Material, Vehicles, Textile Goods, Machinery & Equipment; Truck with Trailer; 20 Ton, Machinery & Equipment; Truck with Trailer; 40 Ton, Goods Transport Service – Per KM Based Service - ... - Machinery & ...
Custom Bid for Services - Supply of Consumable Items for Cylinder Repair and Handling at Hyderabad LPG Plants Similar Category Operation And Maintenance Of Gas Compressor Station Operation and Maintenance Power House/Power Plant Operation And Maintenance Of Other Machines And Plants Repair, Maintenance and Installation of Plant Systems/Equipments
BTPS-CHP-Removal of spilled over coal & fine dust and wet coal at tail end, head end, along the BCN-7A/B, 6A/B, Bunker floor and TP-5 area by head loads on to running conveyor for the period from 01.04.2024 or from actual date of commencement of work to 31.07.2024
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end, along the BCN-4AB, 5AB, BCN-10, TP-3, TP-4 and ERH area by head loads on to running conveyor for the period from 01.04.2025 or from actual date of commencement of work to 31.07.2025
Removal of spilled over coal & fine dust and wet coal at tail end, head end, along the BCN-4A/B, 5A/B, BCN-10, ERH & TP-3, TP-4 area by head loads on to running conveyor for the period from 01.04.2024 or from actual date of commencement of work to 31.07.2024
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end along the BCN-4AB, 5A/B, BCN-10, ERH & TP-3, TP-4 area by head loads on to running conveyor for the period from 01.12.2024 or actual date of commencement of work to 31.03.2025
Removal of spilled over coal, fine dust and wet coal at BCN-3AB tunnel, ground portal, gallery & head end areas and contingency-1&2 area of 3AB including FG floors by head loads on to running conveyor for the period from 01.12.2023 or from actual date of commencement of work to 31.03.2024
Air Filter Element, (Part No. SAFRE 0075 TNK), for Pre- Heater New Compressor, Make: Deep Pneumatics, Oil Filter, (Part No. SOLFR 7500 MNK) for Pre-Heater New Compressor, Make: Deep Pneumatics, Model: D, DP Liqui Pro Mineral Oil, (Pt. No. ... New Compressor , ...
PJP Dam O and M -Supply and Application of Grease to the Hoist Machinery and filling of Gear Oil in Radicon chambers and Dial Assemblies of Radial Crest Gates P.J.P Dam Revulapally V, Dharoor Mandal, Jogulamba gadwal Dist for the year 2025-26
Engaging of Vehicles and machinery for removal of animal waste and garbage generated during Bakrid Festival 2020 from various Circles and Transfer stations of the Khairthabad Zone, GHMC (Cir 17 Khairtabad, Yousufugada transfer Station and Cir-18 Jubilee Hills) (Item No.6)
Pre Monsoon De-silting and Annual Maintenance of Storm water Katcha drain / Nala (by Machinery) from Kapra Lake down Stream to Nagaram Lake in Ward No.1 Kapra, Ward No.2 Dr.A.S Rao Nagar & Ward No.3 Cherlapally of Kapra Circle1, GHMC.
Annual Maintenance of Storm water Drain / Nala (by Manual with labour, Machinery and Bucket Cleaning) for the year 2024 at various places in Ward No.6 Nacharam of Kapra Circle-1, GHMC. (Reserved for Individual S.T. Contractors /Proprietorship Firms / Partnership Firms/ S.T. LCCS)
OVP Supply application of cardium compound to the wire ropes and supply application of grease to hoisting machinery, filling of rear oil in radicon chambers & dial assemblies, cleaning holes on horizontal girders of V.C gates of OVP Ramapanpad Madhanapuram (M) Wanaparthy Dist
Premonsoon Desilting and Annual Maintenance of Open Major Nala from Swarnajayanthi Complex to Begumpet MMTs Railway Station, Leela Nagar Using Machinery (hydraulic excavator ) and manual throughout the year 2022 in 98-Ameerpet Division, Circle - 17, KZ, GHMC (4th call) (Item No.03)
Providing multi-purpose Special Team for attending Emergency special works in view of Monsoon by providing machinery and labour (24/7 hours) in view of monsoon season for a period of 2 months in Mehdipatnam Circle-12, KZ, GHMC (Item No.14)
Engaging of vehicles and machinery of mini tipper, JCB and 10 Tonner tipper and 25 Tonner tipper on hire basis for removal of garbage/animal waste in view of Bakrid festival 2023 for circle - 10 Falaknuma and Miralam Transfer Station charminar zone, GHMC
Engaging of Mini Mobile Monsoon Emergency teams and Static team for attending Emergency Rescue Operations and machinery for a period of 5 months i.e. from 01.06.2024 to 31.10.2024 at various places in Ward No.107-Madhapur in Chandanagar Division-21, SLP Zone, GHMC
Engaging of Machinery Excavator 120Capacity in good condition for earthwork excavation / solid waste management work at Dumpyard for real working hours 665 houes as directed by Engineer in charge including the hire fuel crew and all other incidental charges etc complete job work
Arrangements for Ganesh Nimajjanam and Machinery for removal of Ganesh idols from Ganesh Immersion Pond and painting of area around pond and painting to barricading grills for the year 2023-2024 in ward no-134, Alwal Cirlce-27, GHMC(Item No.01)
Premonsoon desilting and annual Maintenance of nala (by machinery) of Balkapur Nala from Salar Bridge to 9-4-4/13/14/C,Patel Gully in Nanal Nagar-69,Div-13(KZ),GHMC for the year 2022 (6th Re-call)(Item No.07)
Engaging of Machinery and Man mazdoor for Cleaning and Upkeeping of Baby pond , Providing of Pandals,Stage and Chairs at Cherlapally baby pond in view of the Ganesh Nimajjanam-2025 in ward no 3 Cherlapally of Kapra Circle-01, GHMC.(Rs.13.00 Lakhs)
REPAIR/MAINT OF SWIMMING POOLS, MACHINERY ITEMS OF INSTALLATION, REP/RENEWAL OF CHLORINE GAS/BLEACHING DOZER/LIQUID BASE CHLORINATION, SUP OF CHEMICAL FOR WATER TREATMENT OF PUMP HOUSE, CLEANING OF OH/UG SUMP, TESTING OF WATER UNDER AGEE/M 1 OF GE(U)
Annual Desilting and Annual maintenance of open nala by engaging machinery and manually from Dhankota outlet to Laxmi Nagar and from HUDA park culvert to Moosi River via Prashanth Nagar in Ibrahimbagh-133, Cir-32, GZ, GHMC for the year 2026 (2nd Recall)
TGGENCO-YTPS(5X800MW)-Clearing of Mill Rejects, coal, debris,coal on feeders floor area,mill pits,mill around area at zero meter,loading, unloading and Transportation for Unit-2/Boiler Maintenance/Stage-I of YTPS at Veerlapalem(V) for the period from 01.04.2025 or actual date of commencement to 31.03.2026
Bal insulation and Patch up works from 93 meter to 61 meter in First pass and Second Pass, 61 meter to 24 meter in First pass and 61 meter to 42 meter in Second pass
Annual maintenance of Auxiliary Boiler at Main Plant of HWP Manuguru for the year 2024
Carrying out the Piping Hanger modifications of Boiler-2 at 2X800 MW, NTPC Ramagundam Project
Lifting, Transporting and unloading of spilled and piled up coal etc., at conveyors of pit head CHP to coal yard at Kistaram OC, Sathupalli, Khammam District, Telangana State
00010 M5507106205 BELT, CONVEYOR, NN, FR, 500MM, 630KN/M/3, 5MM, 00020 M5507106204 BELT, 800KN/M/4
LCD Display Volumetric Weighing Machine Specifications Confirming to CE standards ISO certification for manufacturer Type of DWS Machine Static Rated Load/ Capacity (kg)60Resolution (gms)10Weighing Accuracy%B110 Material of Platform SS Pan/ Platform ... of conveyor paired ... of conveyor NA ... no conveyor provided ... the Conveyor in ...
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end head end along the BCN-7A/B, 6A/B head end, gallery, bunkers floor and TP- 5 area by head loads on to running conveyor for the period from 01.08.2025 or actual date of commencement of work to 30.11.2025
BTPS - CHP - Removal of spilled over coal, fine dust and wet coal at tail end, head end along the BCN-4A/B, 5A/B, BCN-10, TP-3, TP-4,6A/B tail end and ERH area by head loads on to running conveyor from 01.08.2025 or actual date of commencement of work to 30.11.2025