Loading…
Loading…
1,033 live452 closing this weekmost from National Highways Authority of India and Ministry of Road Transport and Highways
1,033 results • Best match
Upgradation of the missing link of the Amritsar Jamnagar Economic Corridor between Maliya and Pipaliya section of NH151A (Length 24.2 km) in the State of Gujarat on EPC.
Six Laning of Gandhidham (Kandla) Mundra Port from km 0/000 to km 71/400 (Length 71.40 km) section of NH41 in the state of Gujarat on EPC.
Engagement of user fee agency through e-quotation for Borvihir Fee Plaza, at 4/6 laning of Bodhre to Dhule section from km. 390.000 to km. 457.231 in Maharashtra
Engagement of user fee collection agency on the basis of EQ through e tender at Kozhinjipatti Toll Plaza at Km 392.921 for the Dindigul Samayanallur section from Km 373.726 to Km 426.775 in Tamil Nadu
Develop. of High Speed AC GF Corridor from Shamli Gorakhpur from Ch. 579.950 to Ch.662.400 in the State of Uttar Pradesh on HAM mode Package-11 Design Length 82.450 Km
Engagement of user fee agency through ETender at Mejia Fee Plaza in the State of West Bengal and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through ETender at Nuruddinpur Toll Plaza in the state of Uttar Pradesh and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through ETender at Bagaliya FP and Baggar FP in the State of Rajasthan and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through EQ for Itaunja Fee Plaza at Km. 468.000 and Khairabad Fee Plaza at Km. 420.000 on the Lucknow-Sitapur section in Uttar Pradesh
Engagement of user fee collection agency on the basis of EQ through etender for Rampei fee plaza in the State of Odisha and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through ETender at Mudiyapara Fee Plaza in the State of Chhatisgarh and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee collection agency for Abul Khurana FP in the state of Punjab and upkeep/maintenance of adjacent toilet blocks including recouping the consumable items.
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 212.600 to Ch. 274.000 in the State of Uttar Pradesh on HAM Mode (Package-5)
Development of Greenfield High-Speed Access Controlled Corridor from Shamli-Gorakhpur from Ch.143.100 to Ch.212.600 in the State of Uttar Pradesh on HAM Mode (Package-3)
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I
Engagement of User Fee agency through E-Tender at Burakayalakota fee plaza for the section Rehabilitation up-gradation from two lane to 2/4 lane with paved shoulders of Mulakalacheuvu to Madanapalle section in Andhra Pradesh
Rectification of 25 no of Accident Spots Blackspots in Karur Dindigul Madurai Kayathar sec of NH44 Chettikulam Natham sec of NH785 and Const of Combined Office Building for RO n PIU Madurai in Tamil Nadu on EPC mode
Consultancy Services for preparation of Feasibility Report and Detailed Project Report (DPR) for development of a four lane Ring Road around the Jharia Coalfields in the State of Jharkhand.
Reconst/rehab of existing bridges in Ranchi Rargaon Mahulia sec 140.000 to 224.8000 of NH33 (new NH43) and 224.800 to 277.568 of NH33 (new NH18) and existing bridges in Mahulia Bahragora sec of NH33 (new NH18)(277.568 to 333.500) of NH33(new NH18) EP
Engagement of user fee agency through ETender at Jasnathnagar FP Motisar/Khanori FP n Morani/Pokaran FP in Rajasthan and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items.
IE Services for (PKG-2) Cons.of 6L access controlled greenfield highway from Ahilyanagar (km 290.000) to Hasapur (km 512.000) in the State of Maharashtra on BOT (Toll) Mode 2nd call
CS for Supervision Consultant during OnM of 8L AC GF DVE NH148N starting at Sohna Gurugram Road NH248A near Alipur vill to Haryana Rajasthan Border Ch.0.000 to Ch.78.800 in Haryana on EPC mode under Bharatmala Pariyojana
Construction of 6L access controlled greenfield highway from Ahilyanagar km 290.000 to Hasapur km 512.000 (AHILYANAGAR BYPASS PKG 2)
Develop of 6L access controlled greenfield highway starting from Junction with NH60 at Adgaon km. 138.00 to Ahilyanagar km. 290.000 (Ahilyanagar Bypass pkg I)
CS for AE for Balance work for Construction of 8Lane Access Controlled Expressway from Km 128.0 to Km 154.6 of Vadodara Mumbai Expressway Karvad to Jujuwa Section in Gujarat Pkg IX
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Construction of 4lane GF Amritsar-Katra connectivity of Amritsar with DAK Expressway from MDR Junction at ch.40.900 Dhunda Village-Junction NH3 and Taran Taran Bypass near Mannawalla village ch.70.950 (Km 40.900-Km 70.950 Pkg-2) on EPC Mode in Punjab
Development of High-Speed Access Controlled Greenfield Corridor from Shamli Gorakhpur from Ch. 422.500 to Ch.466.000 in the State of Uttar Pradesh on HAM mode (Package8) (Design length 43.500 Km.).
Const of 6L LVUP SVUP in vil Sahuwala Km271.890n272.093 LVUPnSVUP in vil Odhan Km. 285.513n285.765 LVUP in vill Chormar Khera Km292.030 n LVUP in vil Sawant Khera Km306.317 with Slip SR on both sides on Hisar to Dabwali sec of NH9 Old NH10 in Haryana
Construction and Upgradation of existing 2L.PS to 4L with Paved Shoulder configuration from Km 0.000 (Tansen Chowk Purani Chhawani Gwalior) to Km 77.000 (Near Village Prithvipur) of NH719 in Madhya Pradesh on Hybrid Annuity Mode (Package1).
Rehabilitation and Upgradation of exist 2L to 4L of NH146 from Km 0.000 Km 158.600 near Berkheri vill to Km 23.423 Km 181.800 near Lehdara vill in the State of Madhya Pradesh on EPC Mode TL 23.423 km
Development of Interchange at Starting Point of Ahmedabad Dholera Expressway meeting with Sardar Patel Ring Road SPRR in Ahmedabad Gujarat on EPC Mode.
Construction of Perimeter Roads on Both sides of Emergency Landing Facilities (ELF) including ATC Plinth (50m x 50m) on Chilakaluripeta Nellore Section of NH16 from Km. 1210.000 to Km. 1214.600 in Andhra Pradesh on EPC Mode
RFP for Selection of Acquirer Bank for FASTag ANPR based Multi Lane Free Flow MLFF User Fee Collection at 03 Fee Plazas in the State of Delhi Bundle-DL 04 on Fixed Transaction Fee Model
Construction of 2 Lane Service Road of STRR (West side) NH948A Balagondapalli (Tamil Nadu) to Karnataka/Tamil Nadu border from km 144.170 to km 179.936 in Tamil Nadu on EPC Mode.
Engagement of user fee agency on the basis of CB through etender for Pata fee plaza in the State of Jharkhand and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Consultancy services for preparation of the Detailed Project Report for 4 laning of the section from Ghazipur in the state of Uttar Pradesh to Chausa in the State of Bihar.
Development of High-Speed Access Controlled Greenfield Corridor from Shamli-Gorakhpur from Ch. 510.700 to Ch.579.950 in the State of Uttar Pradesh on HAM mode (Package-10) (Design length 69.25 Km.)
Construction of a two-lane Secondary Service Road along UER-II within the available RoW in the State of Delhi on EPC mode.
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 274.000 to Ch. 348.039 in the State of Uttar Pradesh on HAM Mode (Package-6)
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode
Engagement of User Fee agency through ETender at Katiyara Fee Plaza in the State of Bihar and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items
Engagement of user fee agency through ETender at Nimbi Jodha FP in the State of Rajasthan and upkeep/ maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through E-Tender at Malian FP at Km 127.400 on Lambra- Shahkot- Moga- Barnalai Section from Km 12.000 to Km 136.070 including construction of Nakodar Shahkot Dharamkot and Barnala bypasses in Punjab
Engagement of user fee agency through ETender at Bhagawas Chaurasi Fee Plaza at km 04.360 for Two lane with paved shoulder of Shahpura Thanagazi Section of NH248A in the state of Rajasthan
Development of Greenfield High Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 84.500 to Ch. 143.100 in the State of Uttar Pradesh on HAM Mode (Package 2)
Consultancy Services for preparation of DPR /Feasibility Report for new Mumbai-Pune greenfield expressway in the State of Maharashtra (Approx. Length 130 km)
Development/upgradation of existing 4 lane to 6 lane of Lucknow Sitapur section km 412.745 to km 479.327 (Length 66.582 km) of new NH30 in the State of Uttar Pradesh on BOT (Toll) Mode
Upgradation of existing Highway to 4 laning Standard from Pachpadara Bypass (Ch. 95.780) to Patau Interchange (Ch. 115.003) Section of NH25 in the State of Rajasthan on EPC mode.