Loading…
Loading…
467 results • Best match
Development of Six Lane Baraja Kandili Section of NH-130 CD Road from km 338.500 to km 342.500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package OD7)
Repair and Maintenance of FOREST SECTIONS on Chhattisgarh and Maharashtra Border (Km.405.000) to Wainganga Bridge (Km.485.000) Section of NH-53 in the State of Maharashtra
Engagement of user fee collection agency for Lahpatra FP at Design Km 205.200 for Rehabilitation and Up-gradation of NH-111 from Km 163.400 to Km 215.800 to 2-Lane with Paved Shoulder in Chhattisgarh
Development of Six Lane Sargi-Basanwahi Section of NH-130-CD Road from km 42.800 to km 99.500 under Raipur-Visakhapatnam Economic Corridor in the state of Chhattisgarh on Hybrid Annuity Mode (Package-CG-2)
Development of Six Lane Kantakapalle-Sabbavaram Section of NH-130-CD Road from km 445.100 to km 464.662 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package-4(AP)
Development of Six Lane Jakkuva-Korlam Section of NH-130-CD Road from km 396.800 to km 421.100 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package-2(AP)
Construction of 6-Lane Durg Raipur Arang Bypass section of NH-53 from design ch. 0.000 (Vill. Tendesara) to design ch. 44.500 (Vill. Parsada) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package A)
Consultancy Services for IE services for 4 laning of Bilaspur Urga section of NH 130A from design Ch. 0.00 to Ch. 70.200 under Bharatmala Pariyojna Raipur Dhanbad Economic Corridor in the State of Chhattisgarh on HAM
Development of Six Lane Korlam-Kantakapalle Section of NH-130-CD Road from km 421.100 to km 445.100 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package-3(AP)
Development of Six Lane Aluru-Jakkuva Section of NH-130-CD Road from km 365.033 to km 396.800 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode Package- 1 (AP)
Engagement of user fee agency through e-quotation for Narayanpur Toll Plaza at Km 208.289 near Narayanpur, Bikramganj, on NH-120 in Rohtas District (Bihar) under the project stretch from Bikramganj Dawath Maleyabagh Nawanagar Dumraon in Bihar
Consultancy Services for IE services for Supervision of Development of six lane of Raipur-Visakhapatnam Economic Corridor from Baraja to Tumbigura section Design Chainage 338.500 to 365.033 of NH-130-CD in Odisha on HAM OD-Package-III
Rehabilitation and up-gradation of NH-30 from Dhamtari-Kanker (Km. 81.50 to Km. 130.00), Bedma-Dahikonga (Km. 180.00 to Km. 241.00) and Dahikonga-Jagdalpur (Km. 241.00 to Km. 298.00) section to 2-Lanes with paved shoulders in Chhattisgarh
RFP for providing Manpower Services to Invit Concessionaire for collection of User Fee at Bhojpuri Fee Plaza of Simga to Bilaspur Section of NH 130 (Old NH200) and NH49 from Km.48.580 to Km.126.525 in the State of Chhattisgarh
Engagement of user fee agency through CB at Jagtara FP at km 94.995 for two/four lane with Paved shoulders section for the use of Dhamtari -Kanker section from design ch. 81.500 to km 129.912 of NH 43 in Chhattisgarh
CS for Independent Engineer services for Supervision of Development of Six Lane Basanwahi-Marangpuri Section of NH-130-CD from km 99.500 to km 124.661 of Raipur-Visakhapatnam Economic Corridor in the state of Chhattisgarh on HAM (PKG-CG-3)
Improvement work at the Identified Accidental location of eDAR spots of various NH under NH Division Ambikapur
Short Term Improvement and Routine Maintenance for the stretch in the state of Rajasthan 2 lane with Paved Shoulder Lambia Raipur Section (Km. 163.800 to Km 218.563) of NH 458 (Length 54.763 Km)
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF DESIGN AND CONSTRUCTION OF FLY OVER AND JUNCTION DEVELOPMENT AT TATIBANDH CHOWK AT KM. 281.700 ON RAIPUR-AURANG SECTION OF NH-06 NEW-53 IN THE STATE OF CHHATTISGARH AS A STANDALONE PROJECT ON EPC.
BT Patch repair of Kawardha Town portion in Km. 242.300 to 246.820 of NH 30 (Old NH 12A)
PERIODICAL RENEWAL WORK IN KM 2.00 TO 4.40, 32.00 TO 35.00, 36.00 TO 37.00 and 100.00 TO 108.00 (TOTAL LENGTH 14.40KM) OF AMBIKAPUR RAMANUJGANJ GARWA ROAD NH 343
Construction of cement concrete road work from national highway to railway crossing, national highway to village mohbhatta and salka road to shiv mandir in village mohbhatta block-bilha distt-bilaspur
Operation and Maintenance of Two Laning with paved shoulders of Lambia Raipur Section of NH 458 from Km 163.800 to Km 218.563 (Total Length 54.763 km) under NHDP Phase IV in the State of Rajasthan
B.T. Patch repair from Km.281.00 to 307.600 f NH 53 Old NH 06 Raipur Durg Four lane road
BT Patch repair work Km. 281.00 to 307.600 of NH 53 (Old NH 06) Raipur-Durg four lane road
SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM. 0.00 TO KM.10.900 OF NH-130B and KM. 50.878 TO 55.430 (KAWARDHA TOWN PORTION) OF NH-30 (OLD-12A) and KM. 4.325 TO KM.10.00 (RAIPUR TO SADANI DARBAR) OF NH-30 (OLD NH-43).
Operation and Maintenance of facilities / amenities at the 2 Highway Nest Mini including toilets, located near Sendurwafa Toll Plaza at km 449.200 on (either sides i.e.LHS and RHS) on Chhattisgarh/Maharashtra Border-Wainganga Bridge Section on NH-53
W.M.M. Patch repair from Km.281.00 to Km. 307.600 of NH-53 Old NH-06 Raipur-Durg four lane road
BT Patch repair work from Km.4.50 to 10.00 (MMI Chowk to Saddani Darbar) of NH 30 (Old NH 43)
BT Patch repair work from Km.281.00 to 307.600 of NH 53 (Old NH-006) (Raipur-Durg Four lane road)
Raising in Km. 503.600 (503.400-504.000) of NH 63 Old NH-16 Bhopalpatnam to Jagdalpur Road in the state of Chhattisgarh.
Road Safety work Km. 281.00 to 307.600 of NH 53 (Old NH 06) Raipur-Durg four lane road (Road Safety measures)
RCC Retaining Wall Length 85M between Km. 227.400 to 227.600 in Kondagaon City on NH-30 (Old NH-43) Dhamtari-Jagdalpur Road
Emergent repair work of Indravati Bridge at Km 294.600 on NH-30 in the Dahikonga-Jagdalpur Stretch under PIU-Dhamtari in the state of Chhattisgarh
SHORT TERM MAINTENANCE CONTRACT (STMC) OF ROAD FROM KM 0.000 TO 10.900 OF NH 130B AND KM 4.325 TO 10.000 OF NH - 30
Plantation work from Km.281.00 to 307.600 in Centre median of New NH 53 (Old NH 06) for 10 months (excluding Grade Separator length)
Plantation work from Km.281.00 to 307.600 in Centre median of New NH 53 Old NH 06 for 12 Months excluding Grade Separator length
Maintenance of Road, shoulder, face wall, RCC drain and supply of metal aggregates in Km.40.400 to 169800 of NH 130C in Km.4.325 to 10.00 of NH 30 and in Km.15.200 to Km.65.900 of NH 353.
Construction Of 4-Lane ROB NH LC No. KK-89 On Keshlur To Jagdalpur Road Km 14.200 Of NH-30 Old NH-22) At Railway Chainage 308/8-9 Near Keshlur In The State Of Chhattisgarh On EPC Mode
UNI SHAFT NUHYD NH 15 5 UNIVERSAL, UNI SHAFT NUHYD NH225 5 UNIVERSAL
FUSE HOLDER SV NH SV 934 RITTAL SIZE 00 ITEM NO 01, FUSE HOLDER SV NH SV 934 RITTAL SIZE 2 ITEM NO 02, FUSE HOLDER SV NH SV 934 RITTAL SIZE 1 ITEM NO 03, FUSE HOLDER SV NH SV 934 RITTAL SIZE 3 ITEM NO 04
Construction of CC road form National highway to Swami Aatmanand school at ward no 16 Arang.
Construction of 2-Lane ROB at NH LC No. AB-72 on Surajpur to Ambikapur Road in Km 357.370 of NH-78 (New NH-43) at Railway Chainage 1925.11-12 on Bishrampur to Ambikapur Railway Line Near Jainagar in Chhattisgarh
Construction Of 2-Lane Rob At NH L/C No.AB-72 On Surajpur To Ambikapur In Km 357.370 Of NH-78 (New NH- 43) At Railway Chainage 1825/11-12 On Bishrampur To Ambikapur Railway Line Near Jainagar In Chhattisgarh
CONSTRUCTION OF 2-LANE ROB AT LC NO.AB-27 (BELBAHARA ROB) ON MANENDRAGARH TO AMBIKAPUR SECTION OF NH-43 (OLD NH-78) AT NH KM 264.000 AND RAILWAY CHAINAGE 937/14-15 BETWEEN UDALKACHAR-BORIDAND STATIONS IN THE STATE OF CHHATTISGARH
Construction of 2-Lane ROB At LC No.AB-27 (Belbahara ROB) on Manendragarh To Ambikapur Section Of NH-43 (Old NH-78) At NH Km 264.000 and Railway Chainage 937.14-15 Between Udalkachar-Boridand Stations in the State of Chhattisgarh
Maintenance Work of Rainy Season in Km. 14.200 to 25.530 and Km. 31.540 to 51.000 on NH-30 (Old NH-221) Jagdalpur- Sukma- Konta Road.
Maintenance of Road in Km. 57.000 to 104.400 Total 47.400 Km. Of NH-30 (OLD NH-221) Jagdalpur-Sukma-Konta Road under Risk and Cost
Preparation of Detailed Project Report for up-gradation of Four laning of Kawardha bypass on NH-30 (Old NH-12A in the state of Chhattisgarh
Maintenance of Road including B.T. Patch repair, Signs Boards, Shoulder repair, and construction of Face wall of NH-30 (Old NH-221) Jagdalpur-Sukma-Konta Road