Loading…
Loading…
2,187 results • Best match
Construction of Cross Drainages works KM.123.00 of NH-169 at Sholapura-Mangaluru Section.
Providing and Laying 1016mm dia MS raw water rising main pipeline of Mandya water supply system in new alignment near M Shettihally from CH.121.862 to CH.121.615 of NH-275 under DC works of NHAI, Ramanagara (including 1 year DLP) (Lumpsum-No Variation)
4L with Paved Shoulders from KM136.100 to KM182.300 in Belgaum Hungund Raichur Section of NH748A in Karnataka on HAM under NH(O) Length 46.200KMs Pckg4
Reconstructing the part of the road damaged by Heavy rain in Selected reaches to connect National-Highway Hassan Bengaluru road via Bhuvanahalli, Sankenahalli, Lakshmipura connecting Doddapura road from Km 0.00 to 10.00 Km in Hassan Taluk.
Annual Maintenance Work for the year 2026 - 27 for the road connecting National Highway - 4 to Devanahalli Kempapura Road via Chakarasanahalli, from Chainage Km 0.00 to Km 10.49 in Kolar Taluk (0.00 km to 10.49 km)
Custom Bid for Services - PREPARATION OF DFR FOR MANUFACTURING PLANT Similar Category Project Management Consultancy (PMC) Service for NHAI
Request for Proposal (RFP) for Selection of Service Provider for Providing Video Incident Detection and Enforcement System (VIDES) at Bengaluru to Mysuru section of NH 275
Consultancy services for Preparation of Feasibility/DPR for Construction of Outer Ring Road on NH 766C for Shikaripura town in Shimoga Dist in the State of Karnataka under Annual Plan 2021-22.
ANNUAL MAINTENANCE OF MAGUNDI TO NATIONAL HIGHWAY-169 CONNECTING ROAD VIA BALEHONNUR, CHIKKAGRAHARA, KUDUREGUNDI ( Ch 80.96-92.97, 84.45-85.03, 85.09-85.91, 87.39-89.80, 90.67-91.76, 92.25-94.26, 96.66-124.86, 130.86-150.00) IN N.R,PURA/KOPPA TALUK CHIKMAGALUR DIST
Construction of drainage from Lodai Hospital to Hanagalla Road in Ward No. 31 and construction of road from ITI College to National Highway Underpass in Ward No. 31 in Haveri CMC under Amruth Nagarotthan Phase 4(200.00Lakhs)
Construction of Asphalt Road From Basaveshwar Circle to Busstand , Busstand to Kanti circle, CMC Office to KVG Bank, Gorbal Naka Bridge to National Highway 50 Road and Development of Beside Road of Gongadashetty Kalyanmantap in Ilkal city.
Performance Based Maintenance Contract PBMC under the jurisdiction of PWD NH Division Bengaluru for NH 766 212 NH 181 67 and NH 150A in the state of Karnataka
Providing Decorative Median street Lights to Sankeshwar City Limits from Old P.B. Road heera sugar factory cross to Circuit house gate and from Rani Chennamma Circle to National Highway Bridge(5054-04-337-0-01-154 MDR improvement)
CONSTRUCTION OF RETAINING WALL AND PROTECTION WORK TO SLIDED ROAD PORTION DUE TO HEAVY RAIN IN SH-252 ROAD JOINING TO NATIONAL HIGHWAY-169 VIA MAGUNDI TO BALEHONNUR, CHIKKAGRAHARA ,AND KUDREGUNDI AT CHAINAGE 113.00 KM IN N.R.PURA TALUK.
Recarpeting of the road Chadchana-Kannur Siddapur Jalageri Babanagar Tikota Babaleshwar Karajol Mulwad almatti to join National Highway 50 from Km 163.44 to km 166.67 in Basavanagudi Taluk of Vijayapura District. H.A 4059-80-051-0-60-132
Construction of Approach Road and Protection Works at Chainage 1.25 Km to 1.35 Km and 1.39Km to 1.60 Km (Bridge at 1.35 Km) Girenahalli village to connecting National Highway No 50 (VR-118) in Sandur Taluk Ballari Dist
CONSTRUCTION OF NEW A SITE RO DEOSUGAR ON NH 167 UNDER BELLARY DO OF KASO
Construction of New A site RO at Chintamani on NH 234, Thimasandra, Chintamani Town under Bangalore DO of KASO.
Consultancy Services for preparation of Detailed Project Report for construction of New Bridge near Old Bridge across Sharavathi River at Honnavara on NH-66 in the State of Karnataka
Two Laning with paved shoulder from km. 0.000 to km. 45.878 of Aurad-Bidar Section of NH-161A under Bharatmala Pariyojna in the state of Karnataka on EPC mode
Construction of 2 lane ROB in lieu of LC 110 E at existing Km 340.640 Sudha Cross in Ballari City Limits on old NH 63 New NH 67 on Hosapete to Ballari section in the State of Karnataka on EPC mode
Providing road safety measures and Curve Improvements work From Km. 53.775 to Km.55.060 at Bharatipura Near Thirthahalli of NH-169 on Shimoga-Manglore section in the state of Karnataka on EPC mode.(Job No. NH-169-KNT-2021-22-955)
Widening of existing road to 2 lane with Paved Shoulders from km 15.980 (Megaravalli) to km 30.750 (Agumbe) of NH-169A on Thirthahalli- Malpe section in the state of Karnataka on EPC mode (Job No. NH-169A-KNT-2021-22-948)
IE Services for addi. works to ensure Road Safety for 6lane Bangalore Mysore AC sec of NH275 in Karnataka on HAM under NH(O)(Project L 2.017 Km) 2nd Call
Engagement of Manpower Service Provider for collection of User Fee on Hebbalu User FP under Tolling Operation Maintenance and Transfer of Davangere to Chitradurga sec of NH-48 in Karnataka
Short Term Improvement and Routine Maintenance of Jevargi Shahapur section of NH 150A from Km.0.000 to Km.50.000 in the State of Karnataka
Improvements to Emmekoppalu Beejiganahalli Junction at KM 177 70 of NH 275 Bantwala Bangalore section in the state of Karnataka
Periodical Renewal from Km 279 990 to Km 286 405 in Maddur Town limit on NH 275 Bantwal Bangalore section
Periodical Renewal from Km 112.5 to 148.230 NH 766C Byndoor Ranebennur section in the State of Karnataka on EPC mode
Hiring of One commercial vehicle Bolero Scorpio or Equivalent on monthly rental basis for office use of NHAI PIU Hospet Karnataka
Engagement of user fee agency on the basis of competitive bidding through e-tender for Bangalore-Nelamangala section of NH-4 at 6 fee plazas located in the State of Karnataka
Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km. 515.000 to Km. 555.017 of NH-48 in the state of Karnataka on EPC mode under Bharatmala Pariyojana (Package-I)
Damged pipe culvert at ch 17 400km near Alanahalli on NH 275k outer ring road in Mysuru disrict in Karanataka state
AME of the road State Highway No-178, Solur (State Highway-75) to Sogala via Nagashettihalli, Magadi, Ajjanahalli, Kootagallu, Shanubhoganahalli (State Highway-94), Ramanagara (National Highway-275), and Channapatna, (Chainage 29.96 km to 47.78 km) in Kootagal Hobli of Ramanagara Taluk
Annual maintenance & repair of a) National Highway-4 from Aadi Jainwadi Sidnal Akkol Road km no. 0.00 to 13.00 , b) Nippani Shiraguppi Shendoor Road km no. 0.00 to 11.50 in Nippani Taluk of Belgavi Dist 3054 MDR MTN 2025-26.
4 Lane with Paved Shoulders from Design Ch.228.500 to Design Ch.273.400 in Belgaum Hungund Raichur Sec of NH ---(Ext.SH20) in the State of Karnataka on HAM Project Length 44.900 kms
Four Laning of Left-Over Works of Hospet-Bellary-Karnataka-AP border from Km. 280.080 (Design Chainage) to Km.375.450 (Design Chainage) of NH-63 in the State of Karnataka on EPC Mode
Four Lane with Paved Shoulders from Design Ch. 43.800 to Design Ch. 89.900 in Belgaum Hungund Raichur Section of NH748A in Karnataka on HAM Under NH(O) (Project Length 46.100 kms) (Package 2)
Widening to Four Lane with Paved Shoulders from Design Chainage Km 27.78 SH Chainage Km 459.5 to Km 57.32 SH Chainage Km. 489.04 Belur Hassan section of NH 373 in the State of Karnataka in EPC mode JOB No NH 373 KNT 2022 23 988
Four laning of Sannur to Bikarnakatte section from Existing km 698.850 (Design Km 691.350) to Existing km 744.190 (Design Km 736.362) of NH-169 under NHDP-IV in the State of Karnataka (Package-III)
Engagement of Manpower Service Provider for collection of User Fee on Bankapur User FP under Tolling Operation Maintenance and Transfer of Hubli to Haveri sec of NH48 (NH-04) in the State of Karnataka
Engagement of Manpower Service Provider for collection of User Fee on Chalageri User Fee Plaza under Tolling Operation Maintenance and Transfer of Davangere to Haveri section of NH-04 in the State of Karnataka
Consultancy Services For Independent Engineer services for Widening to Two Lane with Paved Shoulder of NH 73 New Spur Road Ujire Dharmasthala Periyashanthi in the State of Karnataka under on HAM under NH O Annual Plan 2023 24
Short Term Maintenance Contract STMC for NH 150A from km 89.300 to 112.750 in the State of Karnataka
Performance Based Maintenance Contract PBMC from Km 0 to 9 on NH 150E pertaining to National Highway Division, Kalaburagi in the State of Karnataka Job No NH 150E KNT Kalaburagi PBMC 2024 25
Engagement of user fee collection agency at Chalalgeri Toll Plaza located at Km.288.200 for the sec of Hadadi to Devgiri from Km 260 to Km 340 of NH-4 in the state of Karnataka
4-laning of Bangalore-Mangalore Section from km 270.270 (Periya Shanthi) to km 318.755 (Bantwal) including 6-lane Flyover at Kalladka Town in km. 311-km. 314 on NH-75 on EPC Basis in Karnataka
Construction of 4 lane with paved shoulders from Design Ch. 0.00 to Design Ch. 43.80 in Belgaum Hungund Raichur section of NH748A in Karnataka on HAM under NH(O) Project Length 43.80 Kms (Package-1)
Patching of pot holes and Restoration of damaged carriageway from km 24.125 to Km 58.125 of National Highway 373 (Belur to Hassan old Chainage Km 455.845 to Km 489.845 of SH 57) (selected reaches) (Job No TA-373-KNT-FDR-2022-23-88)
Construction of CC road and Other development works from National Highway to Pradhan Nagaraju house in ward no 25 and Development work from lambani bhavana to connecting M.G. School Road and Nilappa Teacher house extending road in ward no 31 at sira city