Loading…
Loading…
2,209 results • Best match
Annual Maintenance
NBR O - Ring for Self Closing Valves of LPG Cylinders (Q3)
MAINTENANCE
Anual Maintenance
1Road development work from Bhadravati to Sasvehalli (Honnali Taluk border) via Holehonnur, Sidlipura, Sanyasikodamagge, Nagasamudra, Mangote, Anaveri, Lymmagundi and Sider Kallahalli road chain from 31.23 to 34.71 km.2) Bhadravati Taluk ... Agaradahalli NH 13 ... Taluka, NH 206, ...
Annual Maintenance of Moka Basarkodu km 0.00 to 3.5 and km 5.10 to km 8.4 Moka to MB road via BD halli chaganuru km 0.00 to 1.60 ,1.70 to 1.8 ,1.9 to 2.1, 2.4 to 2.9,3.0 to 3.5 ,3.6 to 5.5,5.7 to 6.00, 6.20 to 6.4,6.6 to 7.00,7.20 to 7.50 ,7.8 to ... to NH 63 ...
Multifunction Machine MFM (V2) (Q2) (3 (3 ))
line matrix printer (Q2) (3 (3 ))
Procurement of Spares for Ball Valve of ROV in 12" Liquid LPG Line of Mounded Storage Vessel
Supply, Installation, Testing and Commissioning of hydrotesting unit (tilting type) and allied faci
Procurement of 12 Inch (300NB) EFCV for Mounded storage vessel at Indane Bottling Plant, Belgaum
High_sensitive_Valve, Pressure_Control_Valve, Flow_Control_Valve, SS_Ball_with_Spindle_with_spindle, Pressure_Roller_set_for_Wrench, TORQUE_CONTROL_VALVE, SS_Outer_Barrel_for_Wrench_Head_Block, Interlock_Inner_Shaft_for_SS_Outer_Barrel, SS_Bush_with_Alien_Bolt_for_Interlock_Shaft, Wrench_Socket_with_spring_for_VCWE_Machine, Wearing_part_kit_for_bell_housing_TOP_Head, Wearing_part_kit_for_bell_housing_assemb, SS_Rail_Shaft_for_Lifting_Table, PTFE_Seal_for_Bell_Housing, Wearing_Parts_Kits_for_Hydraulic_Cylinde, PU_Face_Seal, 5_3_Centrally_Located_Detent_Type_Hand_Lever_Valve
Servers (V2) (Q2) (3 (3 ))
GSM Cutter (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate, OEM Annual Turnover, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2 Bid Number : GEM/2025/B/6964303 Dated : 15-12-2025 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 3 Number of Auto Extension count 3 Past Performance 30 % Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 20 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank AXIS BANK LTD (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 39 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : 2/11 Managing Director Tumkur Co operative Milk Producers Societies Union Ltd., Tumkur (The Managing Director)
Non Refrigerated Centrifuge for General Purpose and research (Q3) ( ( 3 3 ))
Multifunction Machine MFM (V2) (Q2) (3 (3 ))
Moisture analyser (Q3) (3 (3 ))
Electronic Milk Analyser with adulteration testing equipment (Q3) (3 (3 ))
Bursting Strength Tester (Q3) (3 (3 ))
Bacterial and Somatic Cell Analyser (Q3) (3 (3 ))
Servers (V2) (Q2) (3 (3 ))
Water Quality Meters/Analyzers (Q3)
Tamper Evident Seals for LPG cylinders (Q3)
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) ( ( 3 3 ))
Procurement of Batteries on Buyback for Fire Engine and UPS at Indane Bottling Plant, Belgaum
Hot Air Oven (FSSAI) (Q2) (3 (3 ))
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
Entry and Mid Level Laptop - Notebook (Q2) (3 (3 ))
DIGITAL BUTYRO REFRACTOMETER FOR DAIRY PRODUCTS (Q3) ( ( 3 3 ))
Computer Printer (V2) (Q2) ( ( 3 3 ))
Laboratory Incubators (Q3) (3 (3 ))
Micro/Semi-Micro/Analytical weighing balance (Q2) ( ( 3 3 ))
Split Air Conditioner Including Green AC, Wall Mount Type (V2) (Q2) ( ( 3 3 ))
Heat Recovery Unit for Bulk Milk Cooler (Q3)
Enamel, Synthetic, Exterior (A) Undercoating (B) Finishing (V4) Confirming to IS 2932 (Q3) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/7052749 Dated : 07-01-2026 Bid Document 1/7 Number of Auto Extension count 1 Bid to RA enabled No RCM Applicable Yes Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 4613346 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 12 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : DGM (LPG-O), KASO IOCL Marketing SRO RCC, INDIAN OIL CORPORATION LIMITED, Marketing Division, Ministry of Petroleum and Natural Gas (Prafulla Kumar Singh)
water baths (Q3) (3 (3 ))
Depth Micrometer (Q3)
USB_hub_4_port_DIN_bracket_mount, Optocoupler_in_5VDC_out_4-48VDC, 3, 3_VDC_Input_to_Exi_Output_IEC, Board, _pITX- E38_QC_1, 91GHz_E3845, MikroTik_hAP_5_port_router_Wireless_fiber, Chameleon_USB2_cam, _CMLN-13S2C-CS, Cable_SBC_to_USB-B_male, USB_triggercable, _2, 8m, Mark_II_Keyboard, Mark_III_Keyboard, Screw_M4x8_ISO_7380_elz, Terminal_box, V-buffer, Plate, Console, Fixation_bracket_for_ball_guide, Console_for_ball_guide, Buffer_M16x1, 5, Adjustable_bracket_for_foot_piece, Rubber_suspension_w, _shaft, Shaft, Turning_joint, Lifting_rail, Lifting_rail_type_2, Service_Kit_for_Central_Column, Coal_12, 5x25x25Carbon_Bush, Threaded_Flange, Central_pipe_339B784, Driving_wheel, Locking_ring, Distance_ring, Hydraulic_motor_FHGS, Coubling_pumppart_A19, A_Alu, Coubling_motorpart_A19_24, 24H7_Alu, Coupling_element_ZK19_92shA_rubber_spider, V- belt_C_22_Antistatic, Chain_wheel_76_tds, Chain_wheel_duplex, Roller_chain_duplex, Adjusting_screw_M10x40, Reflector_round_83, Centering_arm_for_UFM_ATEX_V2, Pipe_for_filling_head_15mm_elbow, Pipe_Ermeto_1300_tower, Pressure_switches_1-5_bar, Wear_plate1, GSV_Seal_Kit, Gas_stop_valve, Valve_spindle_shaft_for_gas_stop_valve_M8, Circlip_J_42_DIN_472-css, O-ring_PUR90, Gasket_PUR70, Spring_comp_Lo42_dt1, 7_Du15, Straight_coupl_Connector, Valve_spindle, DP_Valve_Service_Kit, Plate_spring, O- ring_NBR70, Vibration_absorber_AD-3025_black, Diffuser_plate, Air_distributor_mat, Screw_DIN84A_M2x5, Sealing_ring, Straight_female_plug_Strait_male_plug_4_contacts_0, 8_m, M12_female_to_double_M12_male, Seal_housing_compact, Top_housing_Compact_India, Arm_complete, _centring_unit, _Right, Arm_complete, _centring_unit, _Left, Toggle_joint, Shaft_for_guide_rotary_centering_RF, Threaded_rod_DIN975_M10x195_4, 6elz, Cylinder_lifting_complete, POWER_CABLE_FM, _CS, _VLD, _OLD, LOAD_CELL_CABLE_CAR_1_FM, INPUT_OUTPUT_CABLE_CAR_1, LOAD_CELL_CABLE_CAR_2_FM, INPUT_OUTPUT_CABLE_CAR_2, Cable_for_16_input_CUC, Cable_for_16_output_CUC, Check_Scale_LOAD_CELL_Cable_and_GD_CIR_cable, Sensor_Cable_4-pole, _M12-plug, _blue_5, 0m, Cable_between_two_T-connector, T_Connection_Box, Diffuse_Sensor, Magnetic_inductive_sensor_Namur, Inductive_sensor_Namur_2mm_M12, Inductive_sensor_Namur_5mm_M12, Lens_for_fiber_optic_Z017400, Fork, CPV-Ex_Pilot_valve- Ex_ia_IIB_T6
Custom Bid for Services - Supply and installation of Access control system through flap barrier head count management system and security gadgets at Belgaum BP Similar Category Issuance of Smart Cards/ID Cards
Customized AMC/CMC for Pre-owned Products - ANNUAL MAINTENANCE CONTRACT FOR MECHANICAL MAINTENANCE & MAINTENANCE OF SAFETY EQUIPMENT AT BELGAUM BOTTLING PLANT, KARNATAKA; --; Annual Maintenance Contract (AMC); Daily; Yes
Operation and Maintenance Of Electrical Systems/Electrical Installations - Complete System
Custom Bid for Services - SINGLE TENDER FOR MODIFICATION IN GMS SYSTEM AND SOFTWARE FOR ACKNOWLEDGEMENT FROM FIELD (FTU) AS PER IOCL HO CIRCULAR AT INDANE BOTTLING PLANT BELGAUM Similar Category AMC/CMC of Fire Detection, Fire Alarm, Fire Hydrant and Sprinkler System
Facility Management Services - LumpSum Based - SOR Part A as per Tender; SOR Part A as per Tender; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SOR Part B as per Tender; SOR Part B as per Tender; Consumables to be provided by service provider (inclusive in contract cost), Facility Management Services - LumpSum Based - SOR Part C as per Tender; SOR Part C as per Tender; Consumables to be provided by service provider (inclusive in contract cost)
Roads and Bridge
Maintenance of Yapaldinni-Dongarampur via kalvaldoddi Road From KM. 0.00 to 7.20, Raichur-Burdipad Road from K.m 1.20 to Potgal village From KM. 0.00 to 4.20, Yapaldinni-Dongarampur Road via Athkur From KM. 0.00 to 8.60, Yapaldinni - Waddepalli Road ... to NH -167 ... 13.09, NH -167 ... to NH -167 ... 15.22, NH -167 ... & NH -167 ...
Air Conditioner Air Conditioner ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC Window AC, High wall Split AC, Ceiling Mounted Split AC (Cassette AC), ... 560073, NHAI , ... ( NH -4),
Air Conditioner Air Conditioner ( 1 ) Technical Specifications Specification Specification Name Values Allowed Values CAPACITY/GENERIC Type of Air conditioner High wall Split AC Window AC, High wall Split AC, Ceiling Mounted Split AC (Cassette AC), ... 560073, NHAI , ... ( NH -4), ...
Supply of Battery Bank at ER1, Dismantling Installation and Commisioning, Supply of Spare Cells, Dismantling, Installation and Commisioning, Supply of Battery Bank at NR1, Supply of Battery Bank at SR2, Supply of Battery Bank at Odisha
Cyanoacrylate Chamber
All in One PC (Q2)