Loading…
Loading…
922 results • Best match
Operation and Maintenance of Bidhipur to Dhilwan Section of NH-1 (New NH-03)from Km. 387.100 to Km. 407.100 in the state of Punjab
IE Services for 4 laning of Ambala Kala Amb section of NH 72 (Part of New NH 344 from Ambala Ring road (Design Chainage 0.800) to Shahzadpur and Part of New NH 7 from Shahzadpur to Kala Amb in Haryana and Punjab
Rehabilitation and Upgradation to 4 Lane configuration and Strengthening of Sihuni to Mataur from Km 51.000 to Km 78.090 of NH-20 (New NH-154) (Design Length 24.200 KM) of Pathankot-Mandi Section under NH(O) in HP on HAM basis (PKG-IIA).
Laying of tower foundations, Erection of Towers, Stringing and Sagging of conductor for Shifting of 220 KV D/C line Humbran-Ferozepur Road Ludhiana between TL 20 to TL 25 due to link of NH-1 and NH-95 on Sindhwan Canal (NHAI Deposit work).
Construction Of Street Near Nhai Road To Mundra Sweets Mc Zirakpur
Periodical renewal of existing road from km 171 350 to km 177 800 180 800 to 186 600 189 200 to 189 450 190 00 to 190 250 190 250 to 201 500 of NH 354A under National Highways Division No 1 PWD B R Amritsar in the state of Punjab for the year 202
Four Laning of existing 2-lane section from Malout (Design Km 45.600 of NH-07) via Abohar (Design Km 77.600 of NH-07) to Sadhuwali (Design Km 33.000 of NH-62) Design Length 65.000 Km in the State of Punjab under Bharatmala Pariyojana on HAM
Providing and Installation of New LED Street Light Points Infrastructure at National Highway 1 From Amritsar road Canal to Bhagat Singh Colony Canal side, Zone 2
CONSTRUCTION OF ROADS BERMS AND OTHER CIVIL WORK ON ROAD FROM ADDA MARKET ROAD TOWARD NATIONAL HIGHWAY ALONG WITH SIRHIND CANAL IN WARD NO. 14 NANGAL
IE Services for 4 laning of Phagwara to Hoshiarpur road (NH 344B) including Phagwara and Hoshiarpur Bypass under BMP (from Ch -0.600 to Ch. 46.902 of NH 344B and Ch. 7.780 to Ch. 8.900 of NH 344A Total design length 48.622 km) in Punjab on HAM
CS for AE for supervision of Rehabilitation and Up-gradation to 4 Lane configurations and Strengthening of Thanpuri to Paror section from Km 85.135 to Km 100.840 of NH-20 (New NH-154) of Pathankot-Mandi under NH-(O) in H.P (Package-IIC) on EPC mode
Development of New A Site RO at Kotkapura within Municipal Limit Not on State Highway and National Highway, Dist. Faridkot under Bathinda DO of Punjab State Office
IE services for SD of Jakh (Vijaypur)-Kunjwani NH-44 to 6-lane Exp. as part of Delhi-Amritsar-Katra Exp. Km 503.200-Km 515.000 of Kunjwani-Tawi Bridge NH-144A to 4-lane Ch.0.000-7.385 of NH-144A to Jammu Airport in JK on HAM (Phase II-Package XVI)
4 laning of existing Beas Baba Bakala Dera Baba Nanak (NH-503D)starting from Beas NH-3(Km. 417.700)and terminating at Kartarpur Sahib Corridor(Km. 0 of NH-354B and Km.153.800 of NH354 under BMP PKG-2(Design Ch Km 31.300 to Km 69.100 )on EPC in Punjab
Engagement of user fee agency through E-Tender at Chahar fee plaza at km 12.200 on Laddowal Bypass from 0.000 to 17.041 KM of NH-95 linking NH-95 with NH-1 via Laddowal seed farm at Ludhiana in the state of Punjab on HAM in the state of Punjab
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Custom Bid for Services - ---- Similar Category Project Management Consultancy (PMC) Service for NHAI
Providing running maintenance of vehicles on monthly hire basis for NHAI PIU Jalandhar
PL of 6 inch dia DIK7 water supply line at Guru Arjun Dev Nagar (Vishkarma Atta Chaki to Krishna Steel) National Highway in Ward No. 29 (Missing Link).
Engagement of user fee agency through E-Tender at Azizpur fee plaza at km 9.120 of Zirakpur Patiala section from Km 0.000 to km 50.000 of NH-64 (new NH-07) in the state of Punjab
Providing, running and maintenance of vehicles on monthly hire basis for NHAI, PIU-Bathinda.
Four laning of existing two lane road from Ghoman to Tanda (NH-503A) from Km 54.000 too Km 85.500 (Design Length 31.500 km) on Hybrid Annuity Mode in the State of Punjab under NH(O) (Package-II)
Construction of 4lane GF Delhi-Katra Expressway from Junction with Jalandhar-Kapurthala road NH-703A near Khojewal village-Junction with Amritsar-Tanda road NH-503A near Sri Hargobindpur Km 319.400-362.420 on EPC under BMP in Punjab
Engagement of user fee agency through E-Tender at Zidda fee plaza at km 267.488 from existing km 221.380 to km 287.215 on Faridkot Kotkapura Bathinda section of NH-15 (New NH-54) in the state of Punjab
Engagement of user fee agency through E-Tender at Kot-Karor Kalan fee plaza at km 205.000 from existing km 166.925 to km 221.380 on Harike Zira-Faridkot Section of NH-15 (New NH-54) in the state of Punjab
Independent Engineer Services for Four laning of existing two lane road from Ghoman to Tanda (NH-503A) from Km 54.000-Km 85.500 (Design Length 31.500 km) on Hybrid Annuity Mode in the State of Punjab under NH (O) (Package-II)
Lehrabega fee plaza at existing km 191.929 (design chainage km 199.097) form existing km 168.000 to km 209.405 on Tapa to Bathinda section of NH-64 (new NH-07) under NHDP-IV on EPC basis in the State of Punjab
CS for IE Services for Construction of 6lane access-controlled Spur connectivity starting from Ch. 15.100 of Ambala Chandigarh section of NH-205A and terminating at Ch. 2.500 of Zirakpur Bypass (TL 10.300 Km) under NH(O) in Punjab on HAM)
Hiring of Vehicles on monthly basis for use of Officers of NHAI PIU Office Patiala
Construction of Rotary at Ch.186.200 (Nabipur Chowk) on NH-354
Engagement of user fee agency through E-Tender at Bajheri FP at Km. 19.425 for the project Greenfield alignment IT City Chowk to Kurali from kilometer 0.000 to km 22.080 of NH 205A and part of NH-205 from km 22.080 in Punjab
IE Services for Rehabilitation and Upgradation to 2 Lane with Paved Shoulder configuration and Strengthening of Padhar to Bijni section from Km 180.000 to Km 202.815 of NH-154 of Pathankot-Mandi under NH(O) in HP on HAM basis (Package-VA)
IE Services for Rehabilitation and Upgradation to Four Lane configuration and Strengthening of Mo to Sihuni from Km 42.000 to Km 51.000 (Design Length 8.330 KM) of NH-20 (New NH-154) of Pathankot-Mandi Section in HP on (HAM) (Package-IB)
Rehabilitation and Up-Gradation to 4 Lane Configuration and Strengthening of Punjab/HP Border to Sihuni Section from Km 11.00 to Km 51.00 (Design Length 37.030 Km)of NH-20of Pathankot Mandi Section under NH (O) in HPon HAM basis (Package-I)
Rehabilitation and Upgradation to 2-Lane with Paved Shoulder configuration and Strengthening of Padhar to Bijni section from Km 180.000 to Km 202.815 of NH-154 (Design Length-19.050 KM) of Pathankot-Mandi under NH(O) in HP on HAM basis (Package-VA)
Engagement of user fee collection agency for Ferozshah Fee Plaza at km 183.730 for four laning of existing two lanes with paved shoulder road from Talwandi Bhai to Ferozepur NH-5 (Old NH-95) from Km 170.380 to Km 194.040 in the state of Punjab
Operation and Maintenance estimate of Punjab/Haryana Border Jind section of NH 52/352 (Old NH 71) from Km 238.695 to Km 292.712 and Km 0.000 to Km 16.191 (Total Length 70.178 km) in Haryana for a period of 5 years on (PBMC) mode
Construction of 4 by 6 lane Greenfield Ludhiana Rupnagar NH 205K from junction with NE 5 near to Manewal Ludhiana to junction with NH 205 near Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg-1 Section
Four laning of existing 2-lane road of Amritsar-Ghoman-Tanda-Una Section of NH-503A from Design Chainage Km 8.270 to Design Chainage Km 54.000 (design length 45.73 Km) in the State of Punjab on Hybrid Annuity Mode (Package-I) under NH-(O)
IE Services for Rehabilitation and Upgradation to Four Lane configuration and Strengthening of Punjab/HP Border to Mo from Km 11.000 to Km 42.000 (Design Length 28.700 KM) of NH-20 (New NH-154) of Pathankot-Mandi Section in HP on HAM (Package-IA)
Providing Water Supply System, Sewerage System, Construction of MPS, Rising Main and all other works contingent thereto in the area of Old Bus Stand along National Highway upto NCC Academy at Ropar.
HIRING OF 01 No Sedan VEHICLE for Superintending Engineer National Highway Circle Amritsar FOR 1 YEAR which may be extended upto 3 years Maruti Ciaz Maruti Dzire Hyundai Aura Honda Amaze Etc
Hiring of 1 No Sedan vehicle for Executive Engineer National Highway Division, Pathankot for 1 YEAR which may be extended upto 3 years (Maruti Ciaz Maruti Dzire Hyundai Aura Honda Amaze etc.
Beautification and Plantation in Separators on Four laning of Ludhiana to Talwandi section of NH-95 from Km. 92.000 to Km. 170.000 under NHDP Phase III under PIU Ludhiana Regional Office Chandigarh NHAI in the State of Punjab 2nd call