Loading…
Loading…
2,738 results • Best match
NH 90 to Bharupura Bazaar Basti Km 0/0 to 2/00
Construction of Road from NH-11 Nakodesar Jalabsar Udrasar Adsar 1Momasar Lachharsar
TREE PLANTATION WORK ON NH-11 TO BANDH MORA SAGAR MDR-219
cc road nirman karya jawahar mode se nh 21 highway ki aur
Shifting of HT LT line from sarwari gate to BHILWARA NH Ajmer
CONSTRUCTION OF ATAL PRAGATI PATH FROM NH-21 TO MANPUR ATAL PATH
Widening and Strengthening of Megha Highway Sointra to NH-125, 38 Mile
WIDENING WORK FROM NH 58 TO INDUSTRIAL AREA MASUDA. (BA 2026-27)
CONSTRUCTION WORK OF ROAD FROM SHAHPURA-JAIPUR NH-248 CHANDWAJI TO BHURANPURA
Construction of BT road from NH 62 Rasisar to Sowa 14.00 Km
Construction of Road from NH-758 to Industrial Area Khankhla District-Bhilwara
Strengthening, Widening of SH 135 Butati (NH 89) to Jobner (SH 90)
Construction of 100ft. Road from Seedling School to NH-76, Amberi. 2304
CONSTRUCTION OF ATAL PRAGATI PATH FROM NH-21 TO MANPUR ATAL PATH
Construction of Atal Pragati Path Khansurjapur (From NH-123 Towards Samesura Road)
NH-48 TO UPTO KHALYA KI DHANI VIA SAMOTA, RAJPUTON KI DHANI
Internal Road Construction Work NH Highway to Behrai Side, Gram Panchayat Ratiyapura
CONSTRUCTION OF CC ROAD FROM NH-162 TO KARNI MATA MANDIR, RAIPUR
05 - Urgent Flood restoration work at Bojunda to Semalpura Choraha NH 76
Drain construction work from Murari Lal Mehta barn to NH 27, Unee
Annual Repair and Maintenance Operation (A.R.M.O.) towards Substation, DG sets, Electrical Installation, UPS and Street Lights for Permanent Campus of IIT Jodhpur (Phase I , II) during 2022-23 at Karwar, NH-62, Jodhpur, Rajasthan
Emergent Work due to Heavy Rainfall on NH-927A(0/000 to 148/000) stretches under Udaipur NH Division in the State of Rajasthan under Special Repair works 2025-26.
Collection of Toll tax (including Private Vehicles) on Bikaner Bye Pass connecting NH-15 Ganganagar road to NH-15 Jaisalmer road km 0/0 to 26/0 for 922 days
Construction of two lane with paved shoulder of Ghatol Bypass from km 133.250 to km 140.950 of NH-56 (old NH-113) on EPC mode in the State of Rajasthan
HT/LT Line shifting work for Strengthening and widening work of NH 11 (Gangapura Fanta) to NH 911 (Gokulfanta) via Gangapura SurjadAgneu RD 820 Km. 0/0 to 44/00
Improvement of Riding Quality of road from Km. 4/500 to Km.11/0 of NH-114 (New NH-125) Jodhpur-Pokran road in the State of Rajasthanon EPC mode.
Construction of new A site Retail Outlet with facilities like Sales Building foundation, Canopy, Paver block driveway and other allied civil and electrical works at location Sanderaon bypass on NH-62 DISTT- Pali under Udaipur Divisional Office, Rajas
Interlock construction work from NH 52 bus stand to Raghunath Kumawats house village Bajor
Consultancy services for preparation of DPR for the works of 1.Const. on of 4L Mavli to Khandel NH-162A 2. Reh./Reconst. of existing Mahi bridge at Ch.226/045 on NH-927A 3. Const. of 4L Bagad Tiraha to Naugaon NH-248A (Alwar-Nuh section) in Rajasthan
Work of Improvement of Riding Quality Programme of pavement NH-927A (Swaroopganj Kotra-Som-Kherwara-) (Km 46.00) from km 8/0 to15/0,84/0 to 98/0 and 105/0 to 130/0 of NH-927A is laterally connected under NH division Udaipur in the state of Rajasthan
Consultancy Services for Feasibility/Detail Engineering report of bypasses (Lalsot, Mandawari, Khedli, Piplai, Salimpur, Karauli) Between Lalsot Gangapur Karauli Section of NH-23 (OLD-11B) for Two lane Paved Shoulder Length of Bypasses 25.00 Km
9.Remaining Work on NH-11 to Punjabi Ka Nagla via Malah Aghapur.
CONSULTANCY SERVICES FOR PREPARATION OF DPR FOR GRADE SEPRATED STRUCTURE WITH SLIP ROAD AT KM 0/00 (SHAHPURA JUNCTION) AND KM 86 (KATI GHATI ALWAR) OF SHAHPURA-ALWAR RAMGARH-NUH ROAD NH-248A
NH 62 to RHB Colony Water Works ke aage tak and anya sthano par Nala Nirman Karya (Retender)
Collection of Toll tax on Bikaner Bye Pass connecting NH-15 Ganganagar road to NH-15 Jaisalmer road km 0/0 to 26/0 for 204 days only (except Private vehicles)
WIDENING AND STRENGTHENING OF NH-21 TO NH-148 VIA CHATRIWALI DHANI, SIRRA KI DHANI, DURGA MANDIR, CHAWANDEDA, MALPURA, CHANDRANA UPTO DISTT. BORDER KM 0/00 TO 5/00 (ADDITIONAL WORK)
Collection of Toll tax (including Private Vehicles) on Bikaner Bye Pass (connecting NH-15 Ganganagar road to NH-15 Jaisalmer road) from km 0/0 to 26/0 for 515 days
Preparation of DPR for Constructon of Ring Road from NH-52 via Taranagar Road via Bhaleri Road to Sardarshahar Road Via Ratangarh Road via Depalsar Road Up To NH-52 Churu
Annual Running and Maintenance Operation (A.R. and M.O.) of lifts for academic and residence buildings during the period for 2 years i.e. 2022-24 at IIT Jodhpur, Karwar, NH-62, Nagour Road, Jodhpur, Rajasthan (Phase-2).
enterlok sdak nirma kary dhani udasingh walai se NH 48 ki or bajrangpura
SHYAM LAL KE MAKAN SE SADAK NIRMAN KARY NH 8 WARD NO 01
Construction of C.C./Bituminous Road from Brahmno Ka Ghudha to NH-76. 9408
Bijainagar NH 48 se Bijainagar riico road me highmast light lagane ka karya
NH 62 SE KISHAN SUTHAR KE KHET KI OR RASTA SUDRADHIKARAN KARY KHARA
Constt of Protection work on NH 11 to Loonch Via Kansujiya ki Dhani
Construction of L/R from NH-52 to village Kaithuda under KUMS Bundi
cc sadak may naali nirman karya NH 8 se Panchayat tak GP DAULATPURA
Construction of Nallah from NH-8 to A.No.-655 Rev. Village Balicha. 3205
Gram Panchayat Lampolai me Mukhye NH se kheto ki Taraf Nala Nirman karye
EARTH FILLING WORK IN PITS (WORK PLACE- KOTA NH-76 SIDE LAKHAVA-III)