Loading…
Loading…
2,743 results • Best match
Widenning and strenthening of existing road from 3.75 to 10.00 mtr of Approach road from Tunkara -Balara- Rabriyawas to NH-158/SH-39 (Ras Merta Highway) KM 0/0 to 11/000
Annual rate contract for repair and maintenance work on various roads under Jurisdiction of PWD District Sub Dn Kolayat (Section I area LHS of NH 11 upto SH 87A and Block Boundary)
Widening and Strengthening of SH 119 from NH 52 Km 403/502 Unhel upto District Border via Bhalta Ratlai Karal Gaon Bhumara Mundla Karodiya Sunel Km. 24/100 to Km. 50/600
Patch Repair work on NH-15 to Khari Agneu 820 RD up to deli talai Km. 12/0 to 24/0 and Gajner to Ganga Sarovar Km. 2/0 to 9/0
Feasibility Study / Prepration of Detailed Engineering Report For Construction of Two Lane for Gudha to Jaipur (NH-8) via Kishore Sidhla Tibara Jhiri Andhi Ramgarh (SH-55) Andhi Bye Pass ( 2.50 Km)
Construction of Four Lane ROB at km 30.00 on NH-162E(Pali-Nadol Section)Crossing the Falna-Marwar Railway Section at LC No. C-67 near Somesar in the state of Rajasthan
Development of A Site RO at FROM KM STONE 52 TO KM STONE57 ON NH 113 ON RHS,VILLAGE-HANUMAN CHAURAHA, TEHSIL-PRATAPGARH, DISTRICT-PRATAPGARH under Udaipur DO of Rajasthan State Office
Strengthening Pavement from Km. 15/0 to 67/0 , 72/0 to 84/0 and 130/0 to 148/0 on NH-927A (Swaroopganj-Kotra-Som-Kherwara-Dungarpur-Sagwara-Banswara up MP boarder section) in Rajasthan State. (Total Km 82.00)
(Total length-76.680 km) on EPC Mode.(ii) Construction of 2 lane with paved shoulders of Northern Bypass Phase-II of Kota City in the State of Rajasthan on EPC Mode.
as per BoQ
Widening and Strengthening of Govindgarh (NH-52) to JeenmataJi via Hasteda, Itawa, Badhal, Pachar, Khachariyawas, Bay, Ganoda, Kochor Km 27/0 to 47/0 (Job No. CRIF/1115/ RJ/2023-24)
Development of A Site RO at FROM GULABPURA MUNCIPAL LIMITS (NOT ON NH-48) at VILLAGE-GULABPURA, TEHSIL-HURDA, DISTRICT-BHILWARA. (2023 SRMP Sr. No. 695) under Udaipur DO of Rajasthan State Office.
HT/LT LINE SHIFTING WORK FOR CONSTRUCTION OF SH-119 NH-52KM.403/502 UNHEL UPTO DISTICT BORDER VIA BHALTA RATLAI KARAL GAON BHUMARA MUNDLA KARODIYA SUNEL (KM.0/0 TO 24/100)
Annual Rate Contract for Repair and Maintenance work on Various Roads Under Jurisdiction of PWD District Sub Division Godu (Section-I On the Right Hand Side of SHW-87A and upto NH-911)
Utility Electrical Poles shifting (33/11KV) Work on Chaksu to Badarwas, Old NH-12 To SH-02 Via Azamnagar, Kalyanpura, Kareda Khurd, SH-02 to Titriya vis Thali ,sardarpura, Devkisanpura, Kareda Khurd Japur
Consultancy Services for Preparation of DPR for Construction of Two Lane with Paved Shoulders Ghatol Bypass From Existing KM 133/650 to KM 138/815 of NH 113 in the state of Rajasthan
Periodical renewal work and incident management services IMS from Km 180 500 End of Nagaur Bypass to Km 267 500 Netra Village of NH 62 in the state of Rajasthan on EPC mode
Construction of C C Sadak NH 12 Megha Hotal ke Piche hote huye Sitaram ke makan tak avm Ganw Mandir se avdesh sharma shiv mandir ki aur dayapura gram panchayat nimodiya PS Chaksu
Construction of Boundary Wall Haight-1.5 m and Angle Iron Fixing 2 Feet High, 2 Feet Bended 550 Rm. Work Place - Kota Byepass NH-76 from Near Vidhyanjali School to Bandha Dharmapura Road
Annual Rate contract for repair and maintainance work on various roads under jurisdiction of PWD Distt. Sub Dn Godu (Section -I On the Right Hand Site of SHW -87A and upto NH-911)
Development of New A Site RO between Between KMS 70 TO KMS 73 ON NH11B NEW NH 23 ON GANGAPUR CITY KARAULI DHOLPUR RD District Karauli under Jaipur Divisional Office SRMP D1 1654
Annual Rate contract for Repair and Maintenance work on Various Roads under Jurisdiction of PWD District sub Division Godu (Section I on the right Hand side of SHW 87A and upto NH 911)
Construction of Boundary Wall Haight-1.5 m and Angle Iron Fixing 2 Feet High, 2 Feet Bended, Length-1000 Rm. Work Place - Kota Byepass NH-76 from Asaram Ashram to UIT Plan side
Construction of Long Span Bridge on Pali-Kanawas-Dhaber-Bandai upto NH-62 at Ch 8/350,13/650 and 21/500 under PMGSY-III Batch-II (2022-23) in District Pali. Package No.RJ25P3LSB04
Widening and Stregnthening of Gogunda Majavda Ubeshwarji Dhar Rampura Sisrma Naya Kheda Nandesgwar upto NH-58E km 0/0 to 39/0 MDR-148 Distt Udaipur Job No CRIF-1156-RJ-2024-25
CC Road construction work from NH 21 to the house of Srimangal Ram Ji Bairwa and ward number 40, Dausa, near Bhagwati ITI in front of Ram Singh Meena in Ayodhya Nagar Colony.
HT/LT Line shifting work for Widening and Strengthening of SH 138 (Rameshwar Choraya) Akoda Fazalpura Dara Ka Nayagaon Bandgaon Bal Ren Sarsod Gothra upto NH 148 D with HLB Bridge at Badgaon.
Construction of Boundary Wall Haight-1.5 m and Angle Iron Fixing 2 Feet High, 2 Feet Bended, Length-1000 Rm. Work Place - Kota Byepass NH-76 from Suman Nagar to Bandha Dharmpura Side
Construction of Boundary Wall Haight-1.5 m and Angle Iron Fixing 2 Feet High, 2 Feet Bended 350 Rm. Work Place - Kota Byepass NH-76 from Suman Vihar to Bandha Dharmpura Road Side
Construction of Boundary Wall Haight-1.5 m and Angle Iron Fixing 2 Feet High, 2 Feet Bended 300 Rm. Work Place - Kota Byepass NH-76 from Hadoti Colony to Bandha Dharmapura Road Side
Widening and Strengthening of Butati (NH-89) to Jobner (SH-90) via- Bachhwari- Jalsu -Degana- Gachhipura -Harnawa -Badu -Parbatsar- Bhervai - Ujoli - Bhadoon - Chhapri - Shakambhari- Sambhar km 49/0 to 103/0 (SH-135)
WIDENING TO 2 LANE OF ROAD FROM MOKHAMPURA (NH-08) PHULERA SAMBHAR ROAD SH-57 KM. 16/00 TO 20/800 (JOB NO. 70/5054/SH/SRF/337/ SC/ST/GEN/2022-23)
Consultancy Services for preparation of Feasibility study and Detailed Engineering report for widening to Four Lane of Sikar-Bikaner Section on NH-11/52 in the State of Rajasthan (Total length 240.00 Km)
Construction of Long Span Bridge on Pali-Kanawas-Dhaber-Bandai upto NH-62 at Ch 8/350,13/650 and 21/500 under PMGSY-III Batch-II (2022-23) in District Pali. Package No.RJ25P3LSB04
Electrical work(11 KV and, 33KV LT line shifting) for widening and strengthening of existing road from 3.75 to 10.00 mtr of approach road from Tunkara- Barlara-Rabriyawas-to NH 158 Distt Beawar
Annual rate contract for repair and maintenance work on various roads under Jurisdiction of PWD District Sub Dn Godu Section I (On The Right Hand Side of SHW-87A and Upto NH-911)
ARMO towards Heat Ventilation and Air Conditioning system, water purification system and fire fighting for IIT Jodhpur, Karwar Pin-342030, NH-62, Jodhpur, Rajasthan during the period from March 2024 to February 2025
Construction of A Site RO with facilities like sales building Paver block driveway other allied civil and electrical works at location between KM Stone 39 to KM Stone 42 on NH 116 while moving from Tonk to Sawai Madhopur under Ajmer DO of RSO
by construction of Bypass for Town portion(1) Asotra-Brahmdham bypass(2) Siwana Bypass(3) Mokalsar Bypass(4) Major realignment at kathadi(5) Major realignment at Bishangarh(6)Jalore Bypass(7) Ahore Town portion(8) Dujana Bypass in State of Rajasthan
Construction of Atal Pargati Path Parbatsar to NH-89 Junction Via Piplad-Bherunda- Road Gram Bhag Harsor (SH-21A) Harsor Chouraha to Harsor Hospital and Harso Chouraha to Ludiyas Road Gram Harsor at Harsor
HT/LT LINE SHIFTING WORK FOR CONSTRUCTION OF SH-119 NH-52KM 403/502 UNHEL UPTO DISTRICT BORDER VIA BHALTA RATLAI KARAL GAON BHUMARA MUNDLA KARODIYA SUNEL CHAINAGE KM.24/100 TO 50/600
Renewal of nonpatchable road from Deshnoke (NH-89 to Kalu SH-06A Via Napasar Gusaisar Norangdesar, Bambloo, Ranisar, Kharda, Sahajrasar km 92/0 to 99/800 (MDR-297) KM 7.8 (RIDF 28 Phase-II)
Construction of Road from Sawarda (NH-08) to Ajmer via Naraina, Marwah, Roopangarh, Salemabad km 0/0 to 12/0 (SH-100) in compliance of CM Budget Announcement 2026-27 under Jaipur Rural District
Annual Rate contract for Repair and Maintenance Work on Various Roads Under Jurisdiction of PWD Distt. Sub Dn Kolayat (Section-II area RHS of NH-11 upto SH-87A, IGNP Canal and Block Boundary)
Widening and Strengthening on Kuchera (SH - 87) to Kanuta - (NH-58) Via Roopthal - Bodawa - Chhawata -101 (SH19) - Bugarda - Manjhara - Ratanga - Soneli - Chhapara -Tanwara - Ramsar - Gugariyali - Gudarohili Km 18/0 to 50/0 (MDR - 387).
Balance Work for Construction of Nagaur-Bikaner Section of NH-89 on Km 161.000 to Km 269.260 by two laning with paved shoulder in the state of Rajasthan through Engineering Procurement and Construction Mode.
Resectioning, Restoration, Safety Retaining wall and Structure Construction of Nalka Nallah, Forest Nallah and Banganga Nallah from NH 27 to Banganga and Nalka Nallah Junction Point (Km 10.400) including prorata charges, price escalation, contingency
Widening and Strengthening work of Road on Gadholi Mod Fatehpur Mothiyapura Teli ki Panseri Hindaun Lapawali Penchla Nangal Timawa Gudhachanderji Jahara Lal Palsar Bhandarej Mod upto NH 11 Km 0/0 to 62/0
Up-gradation to 2 lane with Paved shoulder from Charbhuja at Design km 0.00 (existing km 150.00) to Neechli Oden (Nathdwara) at Design Km 88.800 (existing km 55.950) of NH- 162E on EPC mode.
Operation and Maintenance of 2 Highway Nest Mini Facilities amenities at Dhaneshwar at Ch.1032.979) and Bassi toll at Ch. 929.629 plazas on Chittorgarh-Kota section of NH-27 under jurisdiction of PIU-Chittorgarh