Loading…
Loading…
54,538 results • Best match
Repairing of Road and Bridges and Culverts in Km 81 to 100 of Mandla Dindori road Damaged due to Rains of NH 543
Est.No.RAESD/OW/788/2023-24 Providing Providing streetlight and Beautification to Mangaon Railway Station near NH-66 Tal - Mangaon, Dist- Raigad Dist-Raigad
Providing Cement conctrete Pavement to to NH 222 to Mharalpada road VP Mharal Ch 0/00 -0/365 Km Tal Kalyan Dist Thane
Improvement to Nh 211 to Gaddevdhari Khatalwadi Jahagirdarwadi to Railway Station Road ODR 55 Km 8/900 to 9/190 Tq Dist Osmanabad
Periodical Renewal of Ferozepur to Shri Muktsar Sahib road from Km 269.960 to 273.880 section of NH.354 in the State of Punjab
Permanent Restoration of Flood damaged NH 543 Road in Km 56 bate 2 Between Sagartola and Shahdol I c Construction of Retaining Wall
Development of New A Site Retail Outlet from Aloda to Panchot Circle on NH-68 under Ahmedabad Divisional Office of Gujarat State Office
Strengthening between Km 119.00 to Km 147.00 on NH-154 including construction of Retaining walls at essential places in the State of Mizoram
Replacement of Damage Pole State Highway and National Highway in EDD Raniganj, Pratapgarh
Replacement of Damage Pole State Highway and National Highway in EDD I, Pratapgarh
Construction of boundary wall at national highway 62 sarv samaaj shamshan bhumi, Lunkaransar.
Replacement of Damage Pole State Highway and National Highway in EDD Lalganj, Pratapgarh
Construction of interlocking road from National Highway No. 30 to Raffan Ki Dukan
Replacement of Damage Pole State Highway and National Highway in EDD Lalganj Pratapgarh
Replacement of Damage Pole State Highway and National Highway in EDD Raniganj Pratapgarh
Tree Plantation And Maintainance for 3 Years Hardada Brahmangaon Chatari Unchavadad Karkhed to District Border MDR 62 Km 4 700 to 22 800 0 00 to 4 700 4 700 Lengh included in National Highway No 752 In Km 12 00 to 13 500 Tq Umarkhed Dist Yavatma
INSTALLATION OF NEW 5 MVA 33/11 KV CONVENSIONAL S/S. EXPANDABLE TO 2X5 WITH CONTROL ROOM WITH 33 KV LINE, 33 KV LINE FOR UNDER GROUND NATIONAL HIGHWAY, 33 KV D.P. STRUCTURE, 33 KV T.P. STRUCTURE, 11 KV LINE, 11 KV T.P. STRUCTURE, 11 KV D.P. STRUCTURE
Tree Plantation And 3 Year Maintainance Hardada Brahmangaon Chatari Unchavadad Karkhed to District Border MDR 62 Km 4 700 to 22 800 Km 0 00 to 4 700 Length included in National Highway No 752 I In Km 7 500 to 9 00 Tq Umarkhed Dist Yavatmal 600 Tre
2) PROPOSED CONSTRUCTION OF CC ROAD AND RCC DRAIN FROM NATIONAL HIGHWAY TO H/O BALA BHUTE TO BILGAYA SAW MILL IN PRABHAG NO -8 2) PROPOSED CONSTRUCTION OF CC ROAD FROM H/O DATTA DALAL TO CHURRE HOTEL IN PRABHAG NO 4 FOR MUNICIPAL COUNCIL AREA BRAMHAP
Construction Of 33 Kv Line 66.5 Ckm Overheadby Wolf Conductor By Rail Pole & 1 Km By Ug Cable (double Ckt)in Aurangabad, Gaya, Sasaram & Bhagalpur Circle From Different Gss/pss To Different Psss With All Associated Works Including Railway Crossing & ... & National Highway Crossing ...
Drain construction work from Sagar Ratna to PNT Center on NH-73 (New NH-344) (Ambala Road) in district Saharanpur.
MAINTENANCE OF HORTICULTURE WORKS ON TDI ROAD FROM JUNCTION 73-74 TO NH-5, AT SAHIBZADA AJIT SINGH NAGAR
Improvement to Arjunsond to NH 09 road VR 22 Km 0/000 to 3/000 Tal. Mohol, Dist. Solapur.
Improvement To NH 4 to Bhuinj Ozarde Road VR 105 Ch 2/500 To 5/00 Tal Wai Dist.Satara
Construction of H.L. bridge over Satgudum river at Bagudiya panchayat,Narsinghpur tola,Dumakocha in galudih on NH-18 to Asanpani West Bengal border road via Duarsini at Ghatshila block total length-885m for the year 2024-25
Maintenance of Culverts and Jungle cutting and drain clearance in between 3.00 Km to 12.00 Km of NH-55 (New NH-110) under National Highway Division No IX, in the Dist. of Darjeeling during the year 2025-26. (SL-02)
Maintenance of Culverts and Jungle cutting and drain clearance in between 15.00 Km to 21.00 Km of NH-55 (New NH-110) under National Highway Division No IX, in the Dist. of Darjeeling during the year 2025-26. (SL-01)
Construction of 4 Laning of part of Ramban to Banihal of NH-1A (NH44) Ch.158.650 to Ch.164.660 (NB) Ch.160.260 to Ch.163.406(SB connecting Existing Tunnel-T4) excluding Ch.161.350 to Ch.164.100 (NB) IC of twin tube tunnel (PKG-II) in UT of JK on EPC
IES for 4 laning from Godibandha to Ballahar Chhak to Banarapal and Banarapal to Start of Anugul bypass at Km.314.130 to Km.321.035 of NH53 at Km.75.200 to Km.84.000 of NH149 and at Km.84.000 to Km.85.750 of NH55 under NH(O) on HAM in Odisha
CS For AE For Supervision of balance work of 4-laning of Indore Gujarat/MP Border from km 106.210 to km 115.250 km 121.740 to 127.140 and Forest portion km 149.800 to km 150.850 km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in Madhya Pradesh
Ordinary Repair in KM 0.00 to KM 41.05 including Railing Repair at 28th KM for Road safety of Chaibasa Hata road of NH 220 under N.H Division, Chaibasa
Development of existing 2 lane pavement including strengthening of NH-36 from 160/000 Km to 166/880 Km in Dimapur city portion in the State of Nagaland
REPAIR AND POLISHING OF WOODEN FURNITURE AT MD ACCN AND OTHER OTM ACCN AT NCHC POWAI AND ULHASNAGAR, NH POWAI AND MO (MB) GHATKOPAR UNDER GE (NW) BHANDUP
Construction of new A Site RO MANKI TO GADAULI ON NH 344(LHS SAHA TO JAGADHARI) District Yamunanagar under Panipat Divisional Office of Delhi and Haryana State Office.
Green Highways Projects for (Km 275 to Km 285.000 of AS-16 (Stretch ID-30 PIU-Haflong, NH-54 (New NH-27), Km 285.000 to km 295.000 of AS-16 (Stretch ID-31 PIU-Haflong, NH-54 (New NH-27) and Km 295.000 to km 300.76 of AS-16 (Stretch ID-30 PIU)
Construction of Six Laning grade separated structure at Sangteda, at Manpura Machedi and Lakher and white topping of service road at 05nos. locations on Gurgaon Kotputli Jaipur section of NH 48 in the state of Rajasthan on EPC Mode
Short Term Improvement and Routine Maintenance of 4Laning from Km 300.760 to Km 275.000, Silchar to Balachera Section of NH 54E in the State of Assam, AS-01 on item rate (Percentage) basis at Risk and Cost of Contractor
Appointment of Safety Consultant for 2LPS and 4 lane of Khajuwala Poogal section and Poogal Dantor Jaggasar Gokul Goddu RanjeetPura Charanwala Naukh bap section of NH 911(Total Length 212.107 km) under BM Pariyojna in the State of Rajasthan
Construction of Stone Masonry Boundary wall with Y shaped iron angle and Concertina Coil with provisions of Gate at openings along both side of EMERGENCY LANDING STRIP from Km 41.430 to 44.430 on Sata Gandhav section of NH 925A
Strengthening of Service Roads with rigid pavement on Wardha Butibori Section and Construction of Foot Over Bridge at km 446.085 at village Bhidi on Yavatmal to Warda Section of NH-361 in the State of Maharashtra on EPC mode
Design and Construction of Flyover at Garha Tiraha Section at Ch. 150.350 Design Ch. 150.566 Jhansi Khajuraho project NH 39 PackageII for long term rectification of Black Spots BS ID MP06119 in the state of MP on EPC Mode
Emergency Repairs from Deolgaon Raja Chaufuli Kanhaiya Nagar Jalna to Dongaon Buldhana Dist. Border i.e. from Design Km.0.00 to Km.97.200 on NH-753C in the district of Jalna and Buldhana in the State of Maharashtra Package-1
Operation and Maintenance of facilities and amenities at Shirpur Toll Plaza (Km.205.000) on both sides (LHS RHS) under Highway Nest (Mini) including toilets on Madhya Pradesh-Maharashtra Border- hule Section of NH-52 in the State of Maharashtra
Rehabilitation of distressed portion of RE wall from Km.368.753 to Km.368.908 (near Karmaini) on UP Border to Devapur (WB-09) section of NH-27 (East West Corridor) in Gopalganj district in the state of Bihar (3rd Call).
One time improvement of Nandura Town stretch starting from Nandura Bypass Junction at Km.315.700-upto end of Nandura Bypass at Km.321.750 of Amravati-Chikhali Section of NH-53 in the State of Maharashtra on Item Rate basis
Construction Longterm Rectification of 03 Nos of Blackspots Gram Madai Village Gorakhpur Chauraha and Nagjhar Bypass Tiraha by Constructing 6 Lane Vehicular Underpasses at Km 550.650 Km 580.560 and Km 597.090 in Lakhnadon to Khawasa Section of NH 44
Development of Model Stretch-Provision of street lighting and beautification of Dhapewada Bridge and VoP on Saoner-Dhapewada-Kalmeshwar and Gondkhairi section of NH-547E from Km.4.700 to Km.33.575 in the State of Maharashtra on EPC Mode
Improvement measures at Two potential Blackspot locations from km 164.980 to km 165.640 (Bobasar Junction) and Km 181.250 to km 182.350 (Current Balaji Junction) on Salasar Nagaur Section of NH 58 in the State of Rajasthan on item rate
One Time Improvement in the bypass and realigned section (i)Pargaon village(ii)Georai Village(iii)Chousala Village(iv)Pachod Village(v)Rajapur village(vi)Adul village (vii) Pimpalgaon Pandhari on Yedshi-Aurangabad Section of NH-52 in Maharashtra
Operation and Maintenance of facilities, amenities at Karanja Toll Plaza (Km.76.130) on both sides under Highway Nest (Mini) including toilets on Kondhali-Talegaon Section of NH-53 in the State of Maharashtra under the jurisdiction of RO, Nagpur