Loading…
Loading…
54,554 results • Best match
Construction of 4-lane of NH-53 from Km 2.65 to 3.35 (Junction improvement at Madhura Pool on NH-53 and NH-27 (East-West Corridor)under Annual Plan for the year 2021-22 under PWD NH Division in the State of Assam. Job. No. 53/AS/2021-22/224)
CS for DPR (i) Bypass of town Kot Ise Khan (NH-703B) Km.8.500-12.00 (ii) Bypass of town Bhikwind (NH-703B) Km.72.800-76.300 (iii) Bypass of town Bagha Purana on NH-254 Km.19.05-Km.26.15 (iv) Bypass of town Jalalabad (NH-754) Km.72.00 to SH-20 Punjab.
Engagement as Independent Auditor for Audit of tolls 1.Ochadi Toll NH-56, 2.Nimbahera Toll NH-156, 3.Narsinghgarh NH-56, 4.Sidhpura toll NH-56 for FY 2015-16 to 2024-25 on yearly basis, and for next two FY 2025-26 to 2026-27 on Quarterly basis
Baba Nanam Nagar NH-53 to Avdhan upto NH-60 and Avdhan Road And Ranmal NH-52 And Jail Road NH-53 upto SH 15 (A) (Improvement and Construction of Concrete Road Mehergaon Dhule Amalner khargaon road (Old Mumbai Agra Road)) SH-15(A) in Km.20/500 to 22/
Construction of R.C.C. Drain cum Footpath along the LHS and RHS on NH-44 (New NH-37) at 226th Km and 227th Km (Missing Link of NH-151) in stretches under Annual Plan for the year 2025-26 under PWD, Sribhumi NH Division.(Job No. 37/AS/2025-26/287)
Repair of existing Rain Shelter at Tara Devi Bazaar at RD 141/00 (Against NHAI Deposit
CLUTCH PLATE (INNER) 735032013 U5032201 NH 22 HMT (Q3), COMP SPRING 735032044 FOR NH 22 HMT (Q3), COMPRESSION SPRING STOCK NO (406010264) (H00330244) 1.2* 12* 75 H0033044 (Q3), HEXAGON SOCKET BUTTON HEAD SCREW M5X10 M02672700 FOR NH 22 (Q3), HEXAGON ... FOR NH 22
Short term Maintenance Contract for 19.230 km of NH-131A from km 0.900 to km 20.130 of NH-131A under NH Division No. VII, PW. (Roads) Directorate in the District of Malda during the year 2024-25 (Job No. NH-131A/WB/2024-25/STMC-03)
SH C/o B/wall and V-shape drain at km 204/680 to 204/710 and 205/260 to 205/310 for the year 2019-20 in the State of H.P.
SH C/o Retaining wall at RD 174/628 to 174/646 Balance Work
Short Term Maintenance Contract Ordinary Repairs from Km 33/610 -Km 44/010 of NH 336 (Old NH 210) Pudukottai -Tirchirappalli road.
Air Block 1st stage for Compressor Model NH 105 (Q3), AIR BLOCK 2ND STAGE FOR COMPRESSOR MODEL NH 190 (Q3)
PROOF MACHINED FORGED IMPELLER RING OD2585xID2350xTHICK 180mm- SPECN P355 NH, PROOF MACHINED FORGED IMPELLER RING OD3225xID2960xTHICK 230mm- SPECN P355 NH
Maintenance work of Four lane Kagvadar-Una section of NH-8E (New NH-51) from km 139.915 to km 180.478 (Design chainage from km 140.470 to km 181.450) in the State of Gujarat (Pkg-IV)
Emergent Erosion Control at Km 705.700 of NH-13 RHS Near Tezu Nallah River and Lohit River Confluence Point and River Training Works to prevent RHS Breach of NH-13
STBT NH 61 To Datemala Road At Ane Tal Junnar Dist Pune
NIT for NH Consultancy at Jhajjar Kotli NIT
Improvement to NH 753 A Walati Sawana Chandhai Dhodap Road MDR 102 Km 10/300 to 14/00 Tal. Chikhali Dist. Buldana.
Construction of CD work on NH - 12 to Chorpangra to Gowardhan Nagar road VR-09 Tq. Lonar Dist Buldana Ch. 1/600
4. Construction of Minor Bridge On NH.204 to Yelane Koparde Shiragaon Savate Shimpe road MDR.4 K.m.8.300 Tal.Shahuwadi Dist. Kolhapur.
Improvement To NH 4 to Kawathe to Ch. 119 Connecting Road VR 86 Ch 0/000 To 5/00 Tal Wai Dist.Satara
Construction of new concrete road from NH 117 to House of Binimay Patra at Shibpur Mouza Sansad No IX UNDER FRESERGANJ GP
Construction of Road With bridge on NH-222 To Mendhala (Bk) Road Ch 0/00 to 1/500 Tq. Ardhapur, Dist. Nanded.
Aaland Lonwadi Khopodi Wakodi to NH Road ODR-28 Ch. 3/00 to 4/500 Tq. Malkapur Dist-Buldana (With Hot Mix)
DEVELOPMENT OF FUEL STATION IN WSA SITE AT CHAINAGE 35(LHS), JHAJJAR KOTLI, ON NH 44, JAMMU AND KASHMIR UT DISTRICT JAMMU UNDER JAMMU DO UNDER PUNJAB STATE OFFICE
Special repair work on NH-73 (new NH 344) from km 36 via Gagalheri Saharanpur to Sarsawa. (Divider work)
Renewal work on the route from NH 73 (new NH 344) at km 36 Via Gagalhedi Saharanpur to Sarsawa
STRENGTHENING FROM KM 39/00 TO KM 41/00 KM 66/200 TO KM 66/840, KM 87/340 TO KM 88/300 AND JOINT FILLING OF CC REACHES OF 2.60 KM OF LALSOT - KARAULI SECTION OF NH-23 IN THE STATE OF RAJASTHAN UNDER ANNUAL PLAN 2025-26 (JOB NO. NH-23/RJ/2025-26/896)
Const.of cc road ward no 11 from NH 39 to H/O Dipak(under the scheme of CM GHOSNA )
SR of NH-2 in Km-267 to gram bhuda bhartara road in Km-2.30 to Nagla Tejan Road.
Construction of RCC drain on both sides from Km 7 of NH-72 to Km 31 of NH-73 via Fatehpur Chhutmalampur
Reconstruction of front side Compound wall coming under encroachment drive as per the norms of NHAI and raising of existing front boundary wall by 3 feet at ACRA Dhiansar
Providing approach road to the General stores from NHAI road to General stores including attending ancillary works for providing storage facility of cargo in existing general store warehouse 5Bays.
Patch work of road by CC and Interlocking tiles and Improvement of drain near raj rani guest house, NHAI Under Pass and different places in ward 96 Under Zone02.
Modification of Control room and shifting of equipment due to demolishing by NHAI for construction of 4 lane road widening at 132/33KV SS Ghanpur in OMC Circle, Warangal
Facility Services in NHAI Regional Office and its Project Implementation Units.(Providing manpower viz.Stenographers, Accountants, Computer Operators/Office Assistants,Site Engineers/Peon/ Chowkidar /Security Guards,Sweepers) for two years.
Custom Bid for Services - SOIL INVESTIGATION FOR PROVISION OF INFRSTRUCTURE FOR INDUCTION OF TRAINER AIRCRAFT AT AIR FORCE ACADEMY HYDERABAD Similar Category Project Management Consultancy (PMC) Service for NHAI
Pre monsoon -Monsoon precautionary work etc NH 183 from CH 106/700-136/600
Supply of Laboratory Glassware for Neelam and Heera Platforms Chemistry Labs of NH Asset
Consultancy Services of Authority Engineer during OandM Period of Four Laning of Koilwar to Bhojpur of NH-30 an 84 Chainage Km. 33.250 to Km. 77.100) Length- 43.850 Km.) and Four Laning of Bhojpur to Buxar Section Chainage from km. 77.100 to km. 125
Consultancy Services for Preparation of Detailed Project Report and providing Pre-Construction activities and Land Acquisition for Construction of 4-lane from Chainage 15.000 to Chainage 61.500 on NH-334A in the State of Uttarakhand.
Junction Improvement (LHS) and Construction of Service Road (RHS) at MoRTH Identified Black Spot ID TG - (02) - 131 (Manoharabad / Dandupally) on Nagpur to Hyderabad section of NH-44 in the State of Telangana. 4th Call.
engaging an Independent Engineer (IE) during Operation and Maintenance stage and Supervision of Black Spots construction for Hyderabad - Bangalore section NH-44 contract packages AP-03, AP-04, AP-05 in the State of Telangana.
Widening and Strengthening and Reconstruction of Malgo more On NH 23 to pabeya On sisai bhandra road Total Length 11.00 km
Improvement to NH 211 to Yedshi to SH 145 Road VR 07 Km 0/175 to 1/00 Tq Dist Osmanabad
One Time Improvement to bypassed NH-66 at Margao City from km 548.000 to km 555.300 in the state of Goa.
Short Term Maintenance Contract to NH-202 (Old-155) from 190.000 Km to Km241.000(Length 51.00 KM)under NH Division IVKiphirein the state of Nagaland.
Akkalkot Nagar Parishad District Solapur National Highway road widening, bifurcation and beautification of road from National Highway to Mangrule High School Chowk and Hatti Lake (Development of road from MSEB Chowk to HP Petrol Pump)
Short term maintenance of NH 716 from Km.95/0 to 105/0, Km 106/0 to 107/0 and Km 131/8 to 137/0 of Kadapa Renigunta Road in (RnB) NH Division, Kadapa in the State of Andhra Pradesh
Construction of Four Lane VUP at Km. 649.617 including Service Road and Drains at Hanuman Tekari and other miscellaneous work on Abu road- Swaroopganj Section of NH-27 in the state of Rajasthan on EPC mode