Loading…
Loading…
54,602 results • Best match
STRENGTHENING WORK OF NH 444 FROM KM 186.61 TO KM 220.70 ON UNDER PROJECT BEACON IN THE UT OF JAMMU AND KASHMIR THROUGH EPC Mode
22.5 Widening and Improvement to NH.166 to Dhopeshwar Dhangarwadi Ainwadi Pathawade Man to SH.150 road MDR.121 k.m.12.500 to 15.000 Tal.Shahuwadi Dist.Kolhapur.
Improvement to NH 9 to Khanapur Katgaon Dhotri Khadki to Dist. Border Road ODR 80 Km 4/700 to 6/000 Tq. Tuljapur Dist. Dharashiv.
Improvement to NH 211 Pimparkhed Kandari VR 62 km 0/00 to 6/00 ( Act km 4/245 to 6/00 ) Tq. Paranda Dist. Osmanabad
Development of New A Site Retail Outlet Location- Within 3 Ghatkaintara Chowk On NH-57, Dist- Sonepur under Sambalpur Divisional Office of Odisha State Office.
Development of New A Site Retail Outlet at Village Nikhri on NH 8, District Rewari under Gurgaon Divisional Office of Delhi and Haryana State Office
22.12 Improvements to NH.204 to Dhopeshwar to Ainwadi Dhangarwadi to Patawade Man to SH.150 Road MDR.121 K.m.4.800 to 6.300 Tal.Shahuwadi Dist.Kolhapur.
9.9 Improvements to NH 204 to Dhopeshwar to Ainwadi Dhangarwadi to Patawade Man to SH 150 Road MDR 121 K.m.6.300 to 8.500 Tal.Shahuwadi Dist.Kolhapur.
Estt. For Proposed for Providing conductor theft of 11 KV Atarikhejda pump feeder near at Village Nolai and Dighore NH-146 Road under Gyaraspur DC
One Time Improvement of the various stretches and construction three cell box type structure on Radhanpur to Patan section from km 426.500 to km 483.200 of NH-68 in the state of Gujarat on item rate (percentage) basis
Execution of urgent work from Km. 222.400 to Km.230.000 (Kodinar Bypass) of stalled project of Four laning of Kodinar - Veraval section of NH-8E (Package-VI) in the State of Gujarat on Single Percentage Item Rate Contract.
Implementation of road furniture and other safety measures, short term measures at 2 nos blackspot locations, and annual maintenance including incident management on Ahm-Godhra section of NH-47 from Km04.200 to 122.420 in the state of Gujarat
Strengthening and overlay on various stretches of Palanpur-Radhanpur-Samakhiyali section of NH-27 from km 536.000 to km 430.100 in the state of Gujarat on TOT mode (TOT Bundle 5A2) at Risk and Cost of existing Concessionaire
Strengthening and overlay on various stretches of Palanpur-Radhanpur-Samakhiyali section of NH-27 from km 536.000 to km 589.600 in the state of Gujarat on TOT mode (TOT Bundle 5A1) at Risk and Cost of existing Concessionaire
Cons. of Long-Term Remedial mea. River cut/bank erosion at identified 19 locations (i.e. ARC-16 ARC-46 RC-28 RC-29 ARC-36 ARC-37 ARC-38 ARC-39 ARC-31 ARC-32 ARC-33 ARC-34 ARC-35 RC-16 ARC-17 ARC-18 RC-26 ARC-29 ARC-30) KULLU TO MANALI NH-03 in HP
Emergent repair work from Indore to Dhar section on Risk and Cost of the Concessionaire For 4 laning of Indore Gujrat MP Border on BOT Toll basis from Km 9.500 to Km 171.000 of NH 59 on DBFOT in the State of Madhya Pradesh under NHDP Phase
Construction of 9 FOB on Balance work of Four laning of Kiratpur to Nerchowk sec of NH 21from km 12.75 to km. 26.5 km. 126.5 to km 158.5 including ACC link road from km. 0.0 to km 2.003 Greenfield Alignment (excluding Sundernagar Bypass) pkg 2 on EPC
Strengthening of Service Roads with White Topping from Km 112.500 to Km 113.805, Km 132.030 to Km 134.080 and Km 169.200 to Km 170.270 (BHS) and Construction of New Service Road from Km 81.882 to Km 82.182 (RHS) on NH-44 in the State of Maharashtra
Short term measures for rectifications of Black spot ID MP 02-287 Upparwala Km 113.000 to 113.500 and Black spot ID MP-02-267 Nichewala Km 113.500 to 114.000 Near Baretha Ghat Temple on Itarsi-Betul Section of NH-69 in the state of Madhya Pradesh
Construction of a 6 Lane Flyover with approaches and slip road at Ganesh Nagar Cross Km.226.160 between Km 225.800 and Km 226.960 on the 4 lane Bijapur-Hungund section of NH 50 in the state of Karnataka, to be executed on Standalone basis under EPC m
Strengthening of Service Road from km 323.830 to km 324.950 and km 333.350 to km 334.500 and (b) Construction of Box MNB at km 333.033 on Karodi (km 320.640) to Telwadi (km 375.000) Road Section of NH-52 in the State of Maharashtra on EPC Mode
Emergent repair work from Indore to Dhar section on Risk and Cost of the Concessionaire for 4 lane of Indore Gujarat MP Border on BOT Toll basis from Km 9.500 to Km 118.200 of NH-59 on DBFOT in the State of MP under NHDP Phase
Construction Of STBT NH 61 To Yamaimata Mandir Concrete Road At Ane Tal Junnar Dist Pune
Urgent repairs to the Kanakalapeta flood bank road from Artikayalanka border to NH-216 junction Yanam
Const. of IPB Street NH 10 to Pawan Pardhan in Village Jakhoda, Block Bahadurgarh
Improvement and widening to NH-753 A to Yelgaon Sakhali B.Shrpur Sonewadi Sawargaon Dukare road MDR 132 Km 7/00 to 11/00 Tq-Chikhali Dist. Buldhana
Repairing of Road and Bridges and Culverts in Km 36 to 60 and 66 to 69 of Mandla Dindori road Damaged due to Rains of NH 543
MAINTANCE AND ROAD SAFETY WORK IN AKBARPUR VILLAGE BY PROVIDING WITH SIDE DRAINS ON ALWAR RAMGARH NUH GURGAON ROAD NH-248A IN 73/620 TO 74/740
Improvement of Riding Quality Programme (IRQP) work of Itki Power House (on NH-23) - Darhatar- Jhinjhiri -Tatkundo road (Total length-5.016 km) for the year 2025-26.
Development Of New A Site RO at Chebrolu V from Chebrolu Pithapuram Samalkota Junctionn on RHS of new NH 216, Kakinada Dist. under Vishakapatnam Divisional Office, TAPSO.
Job 3 Construction of link road from Shahtoot Bagh Khad Harizan Basti to National Highway Pandoga Tehsil Haroli Distt. Una HP Km. 0-0 to 2-600 Sub Head Formation cutting, filling and GSB in km. 0-0 to 1-0, C.O 900 mm dia Hume Pipe Culvert at RD 0-90
Providing laying WBM G-II, WBM G-III or WMM, 50 mm thick BM 25 mm thick OGPC on following roads Subash Stadium km 1st RD 0-700 Sial link road from National Highway km 1st RD 0-500. Approach road to Omara Mohalla Tej Bahadur km 1st RD 0-200. Main link
Erection of 2 Nos. S+6 Intermediate Towers and dismantling of existing 1 No. H-type Tower and 2 Nos. DP Structure on 132 KV Balanagar - Shadnagar SC line between Loc. No. 388 to 390 for improving clearance of National Highway - 44 crossing and improving ground clearance of BT road crossing, Mahabubnagar Circle.
CONSTRUCTION OF CC DRAIN FROM TRS PARTY OFFICE TO NATIONAL HIGHWAY VIA WAHEED BHAI HOUSE BHUDAWARPET IN WARD NO 37 IN NIRMAL MUNICIPALITY AND CONSTRUCTION OF CC DRAIN AND CULVERT AT SHANNU KIRANA TO TRS PARTY OFFICE BHUDAWARPET IN WARD NO 37 IN NIRMAL MUNICIPALITY UNDER SCSP 2019-20 (RESERVED FOR SOCIETIES)
2026-HOR01-CB-176 Overall clearing of existing green belt pockets on both sides of National Highway 16 from Maddilapalem Junction to Akkayapalem Junction (both sides), and from Port Hospital Junction to Thatichetlapalem Junction (both sides) further period of 09 months from 01-06-2026 to 28-02-2027 in north area
2026-HOR01-CB-176 Overall clearing of existing green belt pockets on both sides of National Highway 16 from Maddilapalem Junction to Akkayapalem Junction (both sides), and from Port Hospital Junction to Thatichetlapalem Junction (both sides) further period of 09 months from 01-06-2026 to 28-02-2027 in north area
Short Term Maintenance Contract to NH-202 (Old-155) from 0.000 Km to 39.000 Km(Length 39.00 KM)under NH Division-III Tuensang in the state of Nagaland.
Maintenance of 1st year Plantation at Kudagi LT cross NH-50 to Managuli NH-50 Road side under Flexi B. head during 2026-27
Plantation work from Km.281.00 to 307.600 in Centre median of New NH 53 (Old NH 06) for 10 months (excluding Grade Separator length)
Post monsoon clearing of bushes along the shoulders and the medians of Ribander bypass NH-4A (New NH-748) from Ch.152.800 to 143.600.
GENERAL-MLA ADS-NH 17 OLH COLONY ROAD-2021-2022 Construction of NH-17 O.L.H Colony Road in ward 9 of Vadakkekara Grama panchayath
REPAIR OF ROAD WORK IN KM 70/600 TO 74/1000 4.60 KM ON NH 135 B SIRMOUR DABHOURA ROAD NH SUB DN REWA
MRL13-NH 106 arar to rajni prasad chawkConstruction Of Box Bridge At Ch 9400 Km in NH 106 Arar To Rajani Prasad Chowk Road
Periodic Renewal (PR) work in the stretch from km. 5.000 to 7.450 of NH-235 (New NH-334) in the State of Uttar Pradesh.
REPAIR OF ROAD WORK IN KM 60/800 TO 65/1000 5.40 KM 0N NH 135 B SIRMOUR DABHOURA ROAD NH SUB DN REWA
Consultancy Services for Preparation of Detailed Project Report (DPR) for construction of Ring Road around Ajmer from Tilora (NH-58) to Saradhana (NH-58)
Widening and Strenthening of Road from Korgha More (NH-133) Champagarh-Saraiyahat (NH-133) Road (Total Length-13.695 Km) for the year 2022-23
Short term maintenance under Original Repair_Contract Maintenance_works at selected location between Km 0.00 to Km10.000 of NH-218 under NH Division No. IV_P.W. _Roads_Directorate.
Maintenance of NH-37 from 357/00 to km 402/500 through SOPD from the year 2019-20 under PWD , Jorhat NH Division, Jorhat
REPAIR OF ROAD WORK IN KM 23 TO 25 2.00 KM ON NH- 75 EXTEN GURH INNER TOWN PORTION ROAD ( NH SUB DN REWA)