Loading…
Loading…
54,618 results • Best match
Re-Construction of Minor bridge at Km. 11/430 on NH-503 A in the State of Himachal Pradesh (Job No. NH-503-HP-2022-23-539)
Widening of NH-366 (old NH-17A) from Sada junction (Km. 14/90) to Gate No. 1 of MPT (Km.16/00)- Hiring of the Utility vehicle.
Restoration of damaged road bench at 41.250 kmp of NH-55 under NH Division IX in the district of Darjeeling during the year 2021-22 - 2nd call.
Repair of Road from Kailash Sahu house to NH via Sajan Agrawal house and C.C drain Sajan Agrawal house to NH at W.No. 1 under NAC Barpali
One Year AMC to NH 66 to Mohot Wadghar Pimpalwadi Gothavali Kiye Mazeri to NH MDR 128 km 0/00 to 6/00 Taluka Mahad, District Raigad.
Construction, Widening and Strenthening of Road NH-79 to Charliya Brahamnan - Kotri Kalan- Marjivi- MP Border Via Reechhmala upto NH-113 Km 0/000 to 16/500
Annual Maintanance of SH-202 connecting from mugur cross(NH-766) to Santemaralli (NH-948) Road from Ch 0.00 to 8.40 Km in Chamarajangara Taluk. 2026-27
Widening of Minor Bridge and Improvement of Road at Km. 1/100 on NH. 61 to NH. 753 F road (SH-60 B) Tal. Nagar, Dist. Ahilyanagar
Annual Maintenance of New NH 565 (Nakrekal to Erpade Road) from km 86.057 to 154.900 in (R and B) NH Division Vijayawada for the year 2019-20
Annual Maintenance of New NH 167A (Vodarevu-Narasaraopet - Piduguralla Road)from km 40.000 to 81.420 in (R and B) NH Division, Vijayawada for the year 2019-20
Urgent Repairs to the badly damaged carriage way from km 474/00 to 474/600 of NH-26(Old NH 43) in (R&B) N.H, Division, Visakhapatnam
Urgent Repairs to the damaged stretch fro km 122.000 to 123.500 (Jeelugumilli - Devarapalli road) of Suryapet - Kovvur road of NH 365BB under (R&B) NH Division, Vijayawada
Annul Maintenance of NH - 167B from Km 58/300 to 78/300 of Mydukur to Singarayakonda (NH 16) in SPS Nellore District for the year 2019 - 20
Urgent Repairs from Km. 20.400 to Km. 26.400 of Pamarru - Digamarru road of NH 165 under (R&B) NH Division, Vijayawada in the state of Andhra Pradesh
Emergent Repairs to the badly damaged carriage way from KM 548/0 to 552/0 ( in bits) of NH-26 (Old NH-43) of Raipur- Visakhapatnam Road
Desilting of longitudinal and cross sectional drains between km. 118.00 to 125.00 on NH-4A NH-748 in the state of Goa for the year 2022-2023.
Construction of road from Irish bridge NH-58 to Purkaji - Laksar - Jwalapur NH-334A via Bairagi Camp, Vishvakalyan Ashram and Matrisadan in Haridwar under Kumbh Mela-2021
Patch repair work in Km 1/2 to 3/10 on NH 12 (Additional) and Km 9/8 to 11/2 on NH 86 Extn. (First Call)
PBMC Work for left out portion From Ch 210.830 to Ch 212.400 Dawath Bazar portion of NH-120 for the year 2023 24 under NH Division Gaya
CONSTRUCTION OF H.L BRIDGE ACROSS CHULLHAT NALA, BILASPUR TO AMBIKAPUR ROAD ON NH-130 AT KM. 194.840 ON SHIVNAGAR TO AMBIKAPUR SECTION NH-130 (OLD N.H. 111)
B.T. Renewal work Of NH 52 to Pipalheda Road Length 3.00 km and NH 52 to Barwa Road Length 2.00 km (1st Call) SOR 25/03/2022
Hiring of vehicle for maintenance of NH 4A from Ch 84 00 to Ch 125 00 in the jurisdiction of Work Division XV NH PWD Ponda Goa.
Construction of RCC Box Culvert for Nala replacing existing old arch culvert at km. 4.850 of NH-235 (New NH-334) in the state of Uttar Pradesh
Road Safety of Jalandhar Hoshiarpur Manali Road NH 70 New NH 03 from Km 49 200 to 58 85 in the State of Punjab on EPC mode
4-laning of Bilaspur-Urga (Km. 0.000 to 70.200) Section of NH-130A and 4-laning of Champa-Urga (Km. 0.000 to 38.200) Section of NH-149B
Rehabilitation of existing old bridges on stretches where bypass is proposed provided on NH 50 New NH 60 of Khed Sinnar Section in the State of Maharashtra
Construction of FOB near Bus Stand ISBT at design km 4.900 of Elevated Samrala Chowk section of NH-95 (new NH-05) in the State of Punjab.
Regarding junction improvement at Majri Chowk at km. 46.322 on Zirakpur-Parwanoo Highway Section of NH-05 (Old NH-22) in the State of Haryana (2nd Call).
Construction of De-scoped Service Road of Rewa-Katni section of NH-07 (New NH-30) from Km.242600 to Km. 397000 (BHS) in the state of
Operation and Maintenance including Incident Management of Rohtak-Panipat section of NH-709 (Old NH-71A) from Km. 0.000 to Km. 80.858 in the state of Haryana
Signage work on Agra Bichpuri Achhnera road to Chauhatna Sadarvan and Jaupura to NH-2 and on NH-2 to Achhnera Bodla road via Jaupura Sunari road.
Widening, Strengthening work from km-242.450 to 251.400 of NH-114A in the State of Jharkhand under EPC mode. (JOB NO-NH-114A-JHR-2023-24-332).
Improvement of Defunct NH-55 (Old NH-42) from 52/600 km to 56/800 km (Siminai to Godasila) in the district of Dhenkanal under State Plan
Short Term Maintenance to NH-17(New) / NH-31(old) (Total length of the project 49.000 km) under Abhayapuri Construction Division, Abhayapuri in the state of Assam.
Improvement of Chhatibarghat NH-53 to Gohira Chowk (NH-53) road from 0/000 km to 22/891 km in the district of Deogarh under State Plan
Short Term Improvement and Routine Maintenance of Palsit - Dankuni (Km.584.929 to Km.651.576) Section of NH - 19 (Old NH - 2) in the state of West Bengal
PR of work from Km.207/700 to 222-300 on nh 89 in Nokha Town (New NH-62) Nagaur Bikaber Section In the state of Rajasthan.
4-lanning of Pathrapali - Katghora (Km.88.700 to Km.90.700) (Katghora bypass) of NH-111 (New NH-130) in the state of Chhattisgarh on Item Rate Basis
Construction of bridge across the stream at Ch.9.10 km on SH-301, the road connecting Badanavalu (NH-150A) and Veeranapura Gate (NH-81) in Chamarajanagar Taluk
Improvements to the road NH 5 at veleru to NH 5 at Bommuluru Via Navodaya, Seetharampuram, pallerlamudi and Koyyuru from km 13.000 to 13.700 in Krishna Distirct
Intensive Patchwork to the road Link road connecting NH 9 to NH 5 through Indrakeeladri Tunnel road from Km 0 000 to 5 440 in NTR District
Improvements to 7th Mile NH-219 Cross to AC 219 (via) Kadiriobanapalli, Beerankuppam,BM Gollapalli,Syamarajapuram, Adduvanka, Karlagatta NH 219 from Km2.798 to 6.500 in Chittoor District.
Maintenance of Vishwanathanahalli (on NH-173) to Arehalli Connecting Road (on NH-369) Via Idehalli, Malenahalli Kaval, Arehalli Kaval from Km 0.00 to 12.56 in Holalkere Taluk.
Repairs to Bridges on road from NH-206 KMF Dairy to Join NH-13 near Pillangere Via Jayanthigrama, Honnavile (MDR) at Ch.3.00 & 7.95 Km in Shivamogga.
Improvements to NH -69 (NH-206 ) (4-LANE) from Ch.171.850 to 172.250 KM and 169.350 to 169.750km in Tarikere Town Limits in Tarikere Taluk, Chikmagaluru dist.
Construction of bridge across the stream at Ch. 23.30 km on SH-301, the road connecting Badanavalu (NH-150A) and Veeranapura Gate (NH-81) in Chamarajanagar Taluk
ROAD SAFETY WORK ON HIGHWAY CONNECTING NH-48 GURUVINAHALLI VIA MALALI MDR KM 0.00 TO 3.00 NH-48 MALALI IN SELECTED REACHES IN KUNDAGOLA TALUK DHARWAD DISTRICT
Urgent Repairs to the badly damaged carriage way from km 473/287 to 474/000 of NH-26(Old NH 43) in (R&B) N.H, Division, Visakhapatnam
Strengthening in Km. 211/600 to 217/700 (Section NH-48 to Palghar) of Sinnar - Ghoti - Trimbakeshwar - Jawhar - Palghar road NH-160A in the State of Maharashtra
Maintenance of NH-327E from Km 194.750 to Km 204.000 and NH-327A from Km 0.700 to Km 25.010 on PBMC Mode in the State of Bihar