Loading…
Loading…
54,429 results • Best match
Development of Land Near Toilet, Babarpur mandi, Both Side of NHAI, Panipat.
DETAILED ESTIMATE FOR BEAUTIFICATION /LANDSCAPE WORK FOR MAUKHAMPUR TO BHANIYAWAALA NHAI DIVIDER
CONSTRUCTION WORK OF PIPE CULVERT NEAR NIMAR HOSPITAL NHAI KHANDWA AMRAWATI ROAD
Providing running and maintenance of 01 commercial vehicle for NHAI PIU Khandwa.
BADNAWAR DEWAS ROAD (NHAI) TO SIKANDARI DAUDKHEDI SIMHASTH DN. UJJAIN (II CALL)
Ding Block Maintenance of Plantation Work of NHAI Year 2023-24 in
Custom Bid for Services - NHAI Consultancy for Emergency Response Centre at Visakhapatnam
Repair and Maintenance of National Highway (NH-40) (Km 81.74 to 93.49) (Pkg-I) along the existing road of NH-40 in the State of Meghalaya for the FY 2022-23 (Item Rate Basis) (Total length 11.750 km)
Repair and Maintenance of National Highway (NH-40) (Km 93.490 to 102.130) (Pkg-II) along the existing road of NH-40 in the State of Meghalaya for the FY 2022-23 (Item Rate Basis) (Total length 8.64 km)
Reconstruction of existing deteriorated stone masonry retaining/breast walls with plum concrete walls below existing staff quarters along the National Highway in the campus of JNV Theog, Shimla Subwork/Packages: Reconstruction of existing ... the National Highway in ...
ARC (2024-2026) for Day to Day Maintenance Repairs and Renovation of Furnishing Items CarpenteringItems CP and Sanitary Items Plumbing Sewerage Services Miscellaneous Civil Work at NHAI Residential Building Pocket B-5 Sector17 Dwarka New Delhi110078
Structural repair and rehabilitation of NHAI residential complex (Tower A-B-C including 02 Nos.of common basements) by using Sacrificial Anode Cathodic Protection micro-concreting etc at Pocket B-5 Sec-17 Dwarka New Delhi-110078
Anchoring and Facing Stones repair including fixing Stainless Steel/Carbon Steel/Galvanized Iron anchors dry stone cladding adjustable cramps at South and West Faces of NHAI HQ New Building G3 Sector 10 Dwarka New Delhi 110075
Six laning from Kappirikkad to Thalikulam section of NH 66 old NH 17 from Design Ch.335.850 Ex.km 349.260 to Design Chainage 369.015 Ex.km 382.300 in Kerala on HAM under BMP
4Laning of Bhiwani Hansi road sec of NH 148B frm Km.0.464 of NH 148B to Km.40.880(Design Length 42.934 km) under BMP in the State of Haryana on HAM.
Construction of Underpass on NH-31 (old NH-56) for proposed Expansion of Runway of Lal Bahadur Shastri International Airport at Varanasi in the state of Uttar Pradesh on deposit basis
Construction of upgradation of carriageway km 180.200 to 188.700 of Raebareli-Prayagraj section of NH-30 (Old NH-24B) in the State of Uttar Pradesh on EPC Mode.(Re-Invitation 2nd)
Six laning from Thalikulam to Kodungallur secton of NH 66 (old NH 17)from Design Ch. 369.015 (Ex. km 382.300) to Design Chainage 397.750 (Ex.km411.850) in Kerala on HAM under BP.
Four Laning from Design Km 255.140 to Km 270.270 of Addahole-Bantwal section of NH-75(Old Nh-48) Under NHDP Phase IV on EPC Mode in the state of Karnataka
UPGRADATION TO FOUR LANE WITH PAVED SHOULDER OF NH-341 FROM BHIMASAR JUNCTION OF NH-41 TO ANJAR- BHUJ UPTO AIRPORT JUNCTION KM 0.000 TO KM 65.478 IN GUJARAT ON HAM
Balance Work of Four laning of Panvel Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in Maharashtra under Bharatmala Pariyojana on EPC mode
Improvement works of Borkhedi Wadner Deodhari Kelapur Maharashtra/ Telangana Border from km 36.600 to km 175.000 Section of NH 44 (old NH-7) in the state of Maharashtra on EPC Mode
Strengthening and Improvement of Bareilly Sitapur section of NH 24 ( New NH 30) from Km 262.000 to Km 419.590 in the State of Uttar Pradesh on item rate contract (Single percentage).
Six Laning of Azhiyur to Vengalam section of NH 17 New NH 66 from Des.Ch. 189.200 to Des.Ch. 232.100 in the State of Kerala on Hybrid Annuity Mode under Bharatmala Pariyojna.
Four Laning with paved shoulder of section from km 53.600 (Gola on NH-320) to km 81.446 (Ormanjhi on NH-320 B) in the state of Jharkhand on Hybrid Annuity Mode
Construction of new 3-Lane Major Bridge over River Brahmani at Km. 401.250 of NH-200 (New NH-53) in Duburi-Chandikhole Section in the State of Odisha on (EPC) Mode
Completion of Balance Works of Panikoili-Rimuli Section of NH 215 New NH 20 from Km 0.00 to Km. 163.000 in the State of Odisha on Single Percentage Item Rate Basis.
Periodic repair from km 595.000 to km 613.500 (18.50 km) of Pasighat-Bomjir section of NH-13 (Old NH-52) in the state of Arunachal Pradesh on EPC mode under Annual Renewal Program (ARP) 2020-21.
Appointment of Safety Consultant for Godhra to GJ/MP Border section of NH-47, Padhi Dahod section of NH-113, and Vadodara-Bharuch section of NH-48 in the state of Gujarat.Total Length (254.36 km)
RECTIFICATION OF BLACK SPOT AT JEENAPUR VILLAGE ON NH-552 EXTN. KM. 72/00, ACHROL VILLAGE ON NH-11C KM. 13/00 (OPTION-1), DEVNARAYAN MANDIR KM. 41/00 ON NH-11B LALSOT-DHOLPUR ROAD, JAIPUR BYPASS ON NH-11B LALSOT-DHOLPUR ROAD ON NH-11B
IE for supervision of 4 Laning of Aligarh-Palwal km. 0 to km. 46.390 (DC)PKG-I of NH-334D Including Khair and Jattari Bypass in UP. 4 laning of Aligarh-Palwal Section from 46.390 -Km. 69.110 (PKG-II)of NH-334D in UP and Haryana on HAM under NH(O)
IE services for SD of Jakh (Vijaypur)-Kunjwani NH-44 to 6-lane Exp. as part of Delhi-Amritsar-Katra Exp. Km 503.200-Km 515.000 of Kunjwani-Tawi Bridge NH-144A to 4-lane Ch.0.000-7.385 of NH-144A to Jammu Airport in JK on HAM (Phase II-Package XVI)
4 laning of existing Beas Baba Bakala Dera Baba Nanak (NH-503D)starting from Beas NH-3(Km. 417.700)and terminating at Kartarpur Sahib Corridor(Km. 0 of NH-354B and Km.153.800 of NH354 under BMP PKG-2(Design Ch Km 31.300 to Km 69.100 )on EPC in Punjab
Engagement of user fee agency through E-Tender at Chahar fee plaza at km 12.200 on Laddowal Bypass from 0.000 to 17.041 KM of NH-95 linking NH-95 with NH-1 via Laddowal seed farm at Ludhiana in the state of Punjab on HAM in the state of Punjab
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR /Lot-II/Package-I)
Laying water supply pipe line and Power Supply cable line in different missing links coming under Railway Track and National Highways at different location of Attabira NAC for commissioning water supply project of Attabira Town
Consultancy Services for preparation of Detailed Project Report (DPR) for capacity augmentation of various selected stretches on National Highways in the State of Uttar Pradesh (Package NO- CE-RO/LKO/DPR/ Lot-II/Package-III)
Electrical Installation work and SITC of RAC for proposed office of the Executive Engineer ,National Highway Planning and Design Division IV,Public Works Road Directorate at Khadya Bhawan,Central Block,8th Floor,Kolkata-87___EI work
Supplying pond ash to the road project of NHAI for construction of VUPat Balikuda and Badachana in Chandikhole-Jagatpur- Bhubaneswar sectionof NH5(new NH-16) in the state of Odisha for Talcher STPS Kaniha, NTPC
O.R on NH 05 Kalka Shimla Wangtoo road km 155.00 to 236.000 SH Restoration of Rain damages by providing GSB WMM DBM and BC maintenance in various settled reaches of NH 05 between km 200.00 to 236.00
Widening and Strengthening of Single, Intermediate Lane to 2 Lane from Existing Chainage (Km 100.660 to Km 106.540) Design Chainage (Km 78.785 to Km 84.600) on NH-123 (New NH no. 507) in the state of Uttarakhand
PerformancPBMC from km 21.000 to km 84.274 of Shilllong-Nongstoin Road on NH 44E (New NH 106) (Length 63.274 km) for the year 2025-26 in the State of Meghalaya.(Job No.PBMC-106-MG-2025-26-179
One Time Improvement with white topping in Old NH-547E and Old NH-353J passing through Kalmeshwar Town in the state of Maharashtra on EPC mode
Operation and Maintenance of Jhalawar Rajasthan M.P. Border Section of NH 12 (New NH 52) from Km. 346.540 to Km. 408.700 in the State of Rajasthan
Construction of Major Bridge at Ch. 14.020 (RHS) at Pinjore-Nalagarh section on NH 105(Old NH 21A) in the state of Haryana on EPC Mode
Repair and Maintenance of Rajauli -Bakhtiyarpur section from km 47.723 to km 54.405 (Package-I) of NH-31 (New NH -20) in the state of Bihar.
Engagement of user fee agency through E Tender at Jamnipali FP on stretch Champa Korba Katghora section of NH-149B, from design Ch. 0.000 to Ch. 38.200 under NH(O) in Chhattisgarh
Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj-Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode
Construction of 4 laning of NH-5 (old NH-22) from Kaithlighat to Shakral Village (PKG I from Km 128.835 to Km 146.300 for Design Length 17.465km) in Himachal Pradesh on HAM
Widening and Strengthening for improvement and up-gradation of NH709A Garhmukteshwar (Chainage-83.200 of NH24) to Meerut (Chainage 9.860 of NH-235) including connector to NH-119 Package XII in Uttar Pradesh