Loading…
Loading…
54,496 results • Best match
2026-HOR01-CB-174 Maintenance of development of green belt pockets on National Highway 16 from Akkayapalem Junction to Port Hospital Junction, for further period of 09 months from 01-06-2026 to 28-02-2027. in north area
Geometric improvement work of intersections/junctions (Balaji Dham, Suddhowala Chowk, and Nanda Ki Chowki) located in the section from Jhajhra to Ballupur (Km 140.00 to 148.90) of National Highway No. 72 (New No. 07), subsequent to its transfer from
Construction Of 33 Kv Line 54 Ckmoverhead By Wolf Conductor By Rail Pole In Ara & Gaya Circle From Different Gss/pss To Different Psss With All Associated Works Including Railway Crossing & National Highway Crossing Under Sbpdcl Under (state Plan).
Construction Of 33 Kv Line 55 Ckm Overhead By Wolf Conductor By Rail Pole In Nalanda District From Different Gss/pss To Different Psss With All Associated Works Including Railway Crossing & National Highway Crossing Under Sbpdcl Under (state Plan).
Construction Of 33 Kv Line 54 Ckmoverhead By Wolf Conductor By Rail Pole In Ara & Gaya Circle From Different Gss/pss To Different Psss With All Associated Works Including Railway Crossing & National Highway Crossing Under Sbpdcl Under (state Plan).
Independent Engineer Services for Construction of New four lane Sambalpur Bypass from Km 0.000 to Km 35.384 under NH(O) on Hybrid Annuity Mode in the state of Odisha (3rd Call)
Engagement of user fee agency through e-quotation at Aihar Fee Plaza at km 172.890 for the section (Raebareilly to Banda Section) of NH-232 in the state of Uttar Pradesh
Engagement of user fee agency through e quotation for Bhagalpur fee plaza located at km 137.300 in the section of Lodipur Kala to Jichho on NH-80 in state of Bihar
Engagement of user fee agency on the basis of competitive bidding through e-tender for Bangalore-Nelamangala section of NH-4 at 6 fee plazas located in the State of Karnataka
Engagement of user fee collection agency for Shivani FP at Km.29.000 of NH-166E of Village Shivani Phata District Taluka Kadegaon for the project of rehabilitation and upgradation in Maharashtra
Engagement of user fee agency through ETender at Dabhedi FP for Four laning of NH-709B from km 92.200 to km 155.025 near Saharanpur Design length 62.772 km in Uttar Pradesh
CS for AE for Supervision of Construction of Six Lane Elevated Kona Expressway from Km. 0.145 to Km. 7.337 of NH-117 in the state of West Bengal on EPC mode
Mekalavaripalli fee plaza at Km 217.050 for the section from Km 198.694 to km 245.980 (Markapuram to Vaggampalle Section) of NH-565 in the state of Andhra Pradesh (under PIU-Amaravati)
IE services for Four Laning of Sinnar to Shirdi section of NH 160 from Design Ch km 0.000 to km 50.943 including Sinnar Bypass in the State of Maharashtra on HAM
Independent Engineer services for Upgradation to 6 Lane with paved Shoulder of NH-27 from Samakhiyali to Santalpur section from km. 339.700 to Km. 430.100 in Gujarat on BOT (Toll) Mode.
Construction of 4Lane Greenfield Jalbehra Shahbad sec of NH 152G from Km 0.000 to Km 22.850(Part of Shahbad Thol Feeder Route)in Haryana on HAM under Bharatmala Pariyojana Phase I
IE Services for supervision of Shivpuri to Jhansi from Chainage.km 1305.000 to Chainage km 1380.300 of NH 27 in Madhya Pradesh on toll operate maintain and transfer basis (InvIT Bundle 2)
Engagement of user fee collection agency on the basis of CB for Madanpur fFPat Km 82.000 of for Pathrapali Katghora section of NH-111from Km.53.300 to Km.92.600 in Chhattisgarh
Engagement of user fee collection agency on the basis of CB through for Kitlana FP at design KM 118.46 of Bhiwani-Mandola Section of NH 148B in the state of Haryana
Initial improvement works under Tolling Operation and Transfer of Chittorgarh Bypass to Kota Section (from km 891.929 to km 1052.429) of NH 27 in the State of Rajasthan on EPC Mode
Independent Engineer for the Upgradation of the Gurgaon-Pataudi-Rewari section of NH-352W (design length 46.110 Km) as a Feeder Route in the state of Haryana on Hybrid Annuity Mode
4 Laning of Basukinath to Deoghar Section of NH 114A from Design km 85.081 to Design Km 130.240 (Design Length 45.159 km) in the state of Jharkhand on Hybrid Annuity mode
Four Laning of Munger to Mirzachauki (NH-80) section from Munger to Kharia village junction (Design Chainage Km69.520 to Km95.580) (Package 01) on Hybrid Annuity mode in the state of Bihar
IE services for 4-laning of NH-80 section of Mirza Chauki to Farkka from km. 215.00 to km. 260.00 in the State of Jharkhand (Pkg-I) on Hybrid Annuity Mode
Engagement of user fee collection agency on the basis of competitive bidding through e-tender for Kharik Fee Plaza of Khagaria-Purnea section on NH-31 in the State of Bihar
Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode
Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode
Construction of 6 laning from Belgaum to Sankeshwar Bypass from Km. 515.000 to Km. 555.017 of NH-48 in the state of Karnataka on EPC mode under Bharatmala Pariyojana (Package-I)
Construction of New Major Bridge over Baghmati and Lakhandei River along with Approaches from Design km.16.500 to km.21.500 on NH-527C in the State of Bihar on EPC Mode
Construction of Left out work of four Laning of Mahuva to Kagavadar Section of NH-8E Design Chainage from Km 100.450 to km 140.470 Package-III in the State of Gujarat
4 Laning from km 585.930 (Design Chainage 585.820) to km 628.555 (Design Chainage 630.960) of Mydukur Badvel section of NH-67 on Hybrid Annuity Mode under Bharatmala Pariyojna, in Andhra Pradesh.
Operation n Maintenance of Existing NH-148 A from Andheria mod to Delhi Haryana Border (MG Road) from Km. 0.000 to Km. 7.455 in the State of Delhi for 01 year
4 Laning of Mohari to Satai Ghat sec NH 934 from Km 50.300 to Km 89.875 (Total length 39.575 km) (Package 2) in the State of Madhya Pradesh on EPC Mode.
IE Services for AC Highway of 4Lane with Paved Shoulders from Walajapet Ranipet to TN AP Border of NH40 in TN on HAM under NH(O) (Project L28.021 Km)-(3rd Call)
Construction of proposed half clover leaf interchanges cum ROB at Yerramanchi and Gudipalli villages across NH44 at km 416.005 in the state of Andhra Pradesh on EPC Mode under NH(O)
4laning of Agra Aligarh Sec from Km.0.000 (junc of NH34 Aligarh)to Km.28.000(near Asroi vill in Hathras)in UP on HAM mode under NH(O)Scheme (PKG-I).
Development of 4 lane Economic Corridor from Kharagpur to Chandrakona Ghatal Road Crossing section Km 0.000 to Km 41.000 of NH 116A (PackageI) in West Bengal under HAM Mode/ 2nd Call
Operation and Maintenance of Ashram to Badarpur Elevated Highway Section of Delhi Agra Section of NH 44 from Km. 8.600 to Km. 16.100 in the State of Delhi for 01 year
Development of 4 lane EC from Bowaichandi to Guskara-Katwa Road Sec Km 89.814 to Km 133.000 of NH 116A (Package3) in the state of West Bengal under Hybrid Annuity Mode.
Engagement of user fee agency on the basis of EQ through etender for Navasari Fee Plaza at km 232.385 on Giridih-Jharkhand Section of NH-114A in the state of Jharkhand
Construction of 6 Lane access controlled Highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148NA Design Ch 0.000 to 9.000 in the NCR of Delhi
Rehabilitation and Upgradation to 2-lane/2-lane with paved shoulders/4-lane configuration of Paonta Sahib-Hewna Section (km 000.000 to km 25.000) of NH-707 in the State of Himachal Pradesh under Green National Highways Corridor Project (GNHCP) with t
Construction of C.C Road and Drain At ward N0 -06 NHAI Road waya Sugar Mill Boundary to Sanjay Singh House Bijnor
Hiring of One commercial vehicle Bolero Scorpio or Equivalent on monthly rental basis for office use of NHAI PIU Hospet Karnataka
SUPPLY AND WORK OF OPGW EARTHWIRE FOR CONSTRUCTION OF 132KV SAHUPURI-CHUNAR DC LINE FROM LOCATION NO. 77 TO 90 (NHAI)
Disposal of inert material from SLF Ghazipur to package I and II of NHAI sites near Meethapur and other surrounding sites.
Construction of vender market along with NHAI and opposite Haveli restaurant ward no.17 at Chambaghat near Shivalik Bio Metals, Solan.
Construction of compound wall in survey No: 147 (P) of Mallamgunta village abutting 200 feet NHAI Road in Tirupati Rural Mandal
Plantation and Maintenance of 4510 plants with RCC Tree Guard at Dwarka Expressway NHAI as per drawing and Estimate Annexure-I
Transportation of 26.41 lakh Cu.M. of Pond Ash from NTPC Ramagundam to NHAI-PIU-Mancherial road construction project (Design Length 42KM)