Loading…
Loading…
118 live55 closing this weekmost from National Highways Authority of India and Chief Engineer PWD Faizabad Zone
118 results • Best match
Patch Repair work of Ayodhya Rebareli NH 330A Right Side in Village Road Block Milkipur
Patch Repair work of Ayodhya Rebareli NH 330A Left Side in Village Road Block Milkipur
New Construction of Village Dalpatpur NH-24 to Mangal ka Bazar via Dalpatpur Aliganj Road
RBM Thermoplastic work etc Road Safety work at Moradabad Agra NH 509 to Kundarki Abadi Bhag
Construction of 6 lane Vehicular underpasses at Km 306.930 (Tilhar bypass) and Km 347.595 (Ucholiya) for permanent rectification of MoRTH identified Blackspot on Bareilly-Sitapur section of NH-30 (old NH-24 in the state of Uttar Pradesh on EPC mode.
WARD NO 1 ME MURARI MASTER KE MAKAN SE NH 124 D TAK KAWARD NALI KA NIRMAN KARYA
NH 730 per sthit Jagat Jeet Inter College ke samne beti bachao beti pdhao sckalpchar lgane ka kary
5-WARD NO 14 FAZILNAGAR DAKCHINI ME NH 28 SE JOGIYA ROAD TAK CC MARG KA NIRMAN KARY
New Construction work from KM 278 of NH-74 to the Durga Devi Sthal located at Gaibaujh village (VR)
New Construction of road Muzaffarnagar jansath road gokul city to bibipur via shamshanghat NH-58 road in Distt. Muzaffarnagar.
Construction of road from Chainage 4.450 (Rajghat Road) of Left Lalitpur Canal Service Road upto NH-44 via RTO Office
25 KV OHE Electrification work in connection with Prop Launching/Erection of 06 Lane ROB at CH:17+880 RE pole km 381/18-381/19 between unaula- Pipraiach station GKP By pass starting from NH-29 E & ending NH-28 of N.E. Railway,Varanasi Division.
Alinagar Naibasti SH 120 se Pachafedawa NH 19 Tak Mukhya Marg Ki Patari Ka Chhuta Bhag Sampark Marg Ka Nirman Karya
Road Safety and road signage work at Asaini Tiraha to NH-27 Km 0.000 to 0.900 Asaini road (O.D.R.) in distt Barabanki.
Construction of drains and CC roads in Ward-30 (Swalenagar) from Yadav Jis house to Guddus e-rickshaw shop on the NH.
Construction of Flyover at Ch.93.060 in Jhansi-Lalitpur section of NH- 44 in the state of Uttar-Pradesh on EPC mode
Road Safety Traffic Sign Work of NH-28B Road Km-19 to Tamkuhi Raj via Padrauna Road ODR in Dist Kushinagar in FY 2026-27
Construction of road Nh-28 to saraiya via Ambedkartola haraiyan link Road - Length 2-20 km including 5-year maintenance- Lot No 17 of 19
Construction and Maintanance of NH-135A Saidi Baba se Basdevpatti Patel Basti hote hue Mehdiganj Kotwali Link Road in Distt. Jaunpur (including 05 years maintenance)
One Time Improvement (OTI) of NH-29E from km. 81.420 to km. 98.935 (Length 17.515 Km.) under EPC mode in the State of Uttar Pradesh.
Short Term Repair Maintenance of existing NH31 Phephna to Chiraiya Morh Bairiya Section Pkg2 and Chiraiya More to Jayprabha Setu Section Pkg3 on NH 31
Construction work of NH-19 to Badhapur Underpas to Badhapur Culvert via Mainer Link Road (Including 5 year maintenance cost) under Vidhan Sabha Akbarpur Raniya
GSB, WMM, Interlocking and Divider works as part of the remaining works for the one-time improvement and maintenance of Old NH-24 (Rampur city Portion)
Vidhan Sabha Bikapur me Block Sohawal Ke antargat Masodha Suchhitaganj se NH 27 Satti Chaura Marg ke Bayen Taraf Ishthit Gramin Margon par Patch Marmmat ka karya
Vidhan Sabha Bikapur me Block Sohawal Ke antargat Masodha Suchhitaganj se NH 27 Satti Chaura Marg ke Dayen Taraf Ishthit Gramin Margon par Patch Marmmat ka karya
Construction work of 3x3m 3 cell box culvert in place of damaged slab culvert at Km-2 of NH-91 Nagariya to Chaumuhan Kandauli road in Aligarh district
Independent Engineer Services during Operation and Maintenance for Six Lane Handia-Rajatalab Section of NH 19 in the State of UP under HAM Maintenance and TOT Tolling modes
1019-1-Thermoplastic pant work of the road from NH-24 to Shahpur tigri Gyanpur behlolpur to bypass part 1 under general repair in the financial year 2025-26
Road Safety and Road Signage Work at Lucknow Barabanki Gorakhapur Mokama Old NH 28 Barabanki City Portion Road Km 22.700 to 26.000 and 29.700 to 30.500 in District Barabanki
Utility shifting work as part of the widening and strengthening of the road from NH-2 (Bhagupur) to Agwar, Nagla Manigarhi, Prithvi, Lakhanamai, and Siktara village in Agra district.
Consultancy Services for feasibility study and preparation of (DPR) for widening to 4L form Km. 0.00 to 40.00 Sitapur- Kurain of NH-330D in the State of Uttar Pradesh.
Development of High Speed Access Controlled Greenfield Highway from Shamli-Gorakhpur from Ch. 662.400 to Ch.745.594 in the State of Uttar Pradesh on HAM mode (Package-12) (Design length 83.194 Km)
Development of Greenfield High Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 84.500 to Ch. 143.100 in the State of Uttar Pradesh on HAM Mode (Package 2)
Engagement of user fee agency through ETender at Sabli in Shahjahanpur Distt.FP at design existing km.61.500 for the section in the state of Uttar Pradesh
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 348.453 to Ch. 422.500 in the State of Uttar Pradesh on HAM Mode (Package7)
Rehabilitation and Upgradation of existing 4L highway to a 6L divided carriageway of Orai Barah Section of NH27 from Ex. Km 1515.713 to Km 1578.383 in the State of Uttar Pradesh on HAM (Total Length 62.670 km).
Development of High Speed AC GF Highway from Shamli Gorakhpur from Ch.466.000 to Ch.510.700 in the State of Uttar Pradesh on HAM mode Package9 Design Length 44.700 Km
Develop. of High Speed AC GF Corridor from Shamli Gorakhpur from Ch. 579.950 to Ch.662.400 in the State of Uttar Pradesh on HAM mode Package-11 Design Length 82.450 Km
Engagement of user fee agency through ETender at Nuruddinpur Toll Plaza in the state of Uttar Pradesh and upkeep/maintenance of adjacent Toilet blocks including recouping the consumable items.
Engagement of user fee agency through EQ for Itaunja Fee Plaza at Km. 468.000 and Khairabad Fee Plaza at Km. 420.000 on the Lucknow-Sitapur section in Uttar Pradesh
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 212.600 to Ch. 274.000 in the State of Uttar Pradesh on HAM Mode (Package-5)
Development of Greenfield High-Speed Access Controlled Corridor from Shamli-Gorakhpur from Ch.143.100 to Ch.212.600 in the State of Uttar Pradesh on HAM Mode (Package-3)
Const. of 4L GF corridor Ghazipur Zamania Saiyad Raja of NH24 Old NH97 with extens. up to Varanasi Ranchi Kolkata corridor Km 0.000 to Km 51.850 TL 51.850 km in Uttar Pradesh on HAM mode Pkg II
Upgrad of exist. 4L Corridor from Km 71.000 From Purvanchal Expressway to Km 102.000 Start of Ghazipur Zamania Saiyad Raja sec of NH24 TL 30 km in Uttar Pradesh on HAM mode PKG I
BW Cons. 4lane GF DAKE from Jalandhar Moga road (NH703) to Jalandhar-Kapurthala road (NH703A) (Km 303.900 to 319.400) and Jalandhar Moga road (NH703) to Kapurthala Sultanpur Lodhi road (NH703A) (km 0 to 24.000) in Punjab (P10)
Development of High-Speed Access Controlled Greenfield Corridor from Shamli Gorakhpur from Ch. 422.500 to Ch.466.000 in the State of Uttar Pradesh on HAM mode (Package8) (Design length 43.500 Km.).
Consultancy services for preparation of the Detailed Project Report for 4 laning of the section from Ghazipur in the state of Uttar Pradesh to Chausa in the State of Bihar.
Development of High-Speed Access Controlled Greenfield Corridor from Shamli-Gorakhpur from Ch. 510.700 to Ch.579.950 in the State of Uttar Pradesh on HAM mode (Package-10) (Design length 69.25 Km.)
Development of Greenfield High-Speed Access Controlled Corridor from Shamli Gorakhpur from Ch. 274.000 to Ch. 348.039 in the State of Uttar Pradesh on HAM Mode (Package-6)
Const.of 4L AC GF alignment of Southern bypass to Jhansi and CL for NH44 n NH39 from Km.16.920 of NH44 near Bangay khas vill.DC 0.030 and terminating forming T junc at Km6.650 of NH39 near Orchha Tigela DC15.542 L15.572km in MP and UP on EPC mode