Loading…
Loading…
6,338 results • Best match
Construction/ Extension of Dudhadhari Elevated Flyover including approaches on Muzaffarnagar -Haridwar Section from Km.206.220 to Km. 208.870 of NH-58 in Uttarakhand on EPC Mode.
Consultancy Services for Detail Project Report (DPR) for the project of Construction of Chibramau bypass on NH 91 of Aligarh to Kanpur section under Bharatmala pariyojna
DEVELOPMENT OPERATION AND MAINTENANCE OF MINI WAYSIDE AMENITIES ON AT CHAINAGE 50.270 (LHS) ON NH-09 (HAPUR BYPASS) ON LEASE BASIS
Painting work on the real public-awareness highway of Swachh Bharat Mission under Municipal Council, Gajraula area, the boundary wall of National Highway, Chapela Estalitowers, the walls and fountain of Ramabai Degree Ambedkar Degree College and othe
Aligarh Smart City, the work of shifting the obstructing electrical systems in the four lane widening and strengthening work of Aligarh urban part from Km 125.000 to Km 127.500 (from National Highway-34 Bypass to Fruit Market)
2 lane with paved shoulder of Najibabad Kotdwar section of NH 119 from Design Ch. 122.200 to 137.760 Existing Ch. 138.635 in the state of Uttar Pradesh.
Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode
NH 2 Makkhanpur Nasirpur Via Angadpur Govindpur Kirthara Mohhammadpur Ramnagar Rajpur Balai Road
Construction of line for releasing connection of load 63 KVA for Toll Plaza NHAI at Chapar under EUDD-II, Muzaffarnagar
Construction of line for releasing connection of load 63 KVA for Toll Plaza NHAI at Chapar under EUDD-II, Muzaffarnagar
Hiring of Commercial Vehicles on monthly hire basis for the Field Officers at NHAI, PIU-Badaun on e-tendering mode.
Providing Running and Maintenance of Vehicle Innova Scorpio Bolero or Equivalent Commercial on monthly hire basis for NHAI PIU Moradabad
Engagement of user fee agency through EQ at Allahabad Bypass including Ganga Bridge Package ABP -1 from Km. 158.00 to km. 242.708 of NH-2 in Uttar Pradesh
Engagement of user fee collection agency on the basis of CB through etender for Aaini FP at km 63.450 of NH-28C in the state of Uttar Pradesh
IE Services during Operation and Maintenance period of Lalitpur-Sagar-Lakhnadon (existing Km. 99.005 to Km 415.089) on NH-44 under TOT in Uttar Pradesh and Madhya Pradesh.
Development of new A site RO with facilities like Sales Building Canopy Paver block driveway and other allied civil and electrical works at location within Municipal Limits of Hardoi Not on National Highway Distt. Hardoi under Lucknow Divisional
RENEWAL OF NH-2 IN KM-280 TO GRAM SHEKHPUR ROAD
SR of NH 2 in km 280 to gram shekhupur road
NH 2 to Bacchu baba Ashram to Neem Karoli Tak Road
SR of NH 2 to Nagla Prem Singh Nagla Bal Road
Engagement of user fee collection agency for Kaithi Fee Plaza At Km 28.585 (existing km 28.170) for Varanasi Gorakpur section of NH-29 in the State of Uttar Pradesh
Engagement of user fee agency through EQ for Dabhedi FP for Four laning of NH-709B from km 92.200 near Shamli to km 155.025 near Saharanpur in Uttar Pradesh
Engagement of user fee agency through e-quotation for Bijnor-Kotwali section of NH-709AD from design km 153.660 to design km 175.280 in the state of Uttar Pradesh
Tolling Operation Maintenance and Transfer of six lane Handia-Rajatalab Section (from Km 712.900 to Km 785.544) of NH-19 in the State of Uttar Pradesh (TOT Bundle-9)
RCC drain construction work from college to NH-2 under village Bhavli
Special repair of NH-74 to Noorpur Dehra via NH-74 road
Pit Making and transplanting of 19417 saplings in a pit of size of 60cm x 60cm x 60cm, at the identified NH stretches on RHS/LHS of NH-74 in Haridwar to Nagina section at different stretches different stretches including carriage
Work No 1 Design Drawing Estimation Monitoring 30 Mtr Wide Proposed Master Road Village Aduli NH 34 NH 334 NH 235
Renewal of NH-2 to Guljar Nagar via Bhawanipur marg, NH-2 to Bhawanipur marg and NH-2 to AAmahar marg.
Engagement of user fee agency through EQ at Rasulpur Mithegaon FP four and more lane of Jagdishpur Ayodhya Section of NH number 330 A in the State of Uttar Pradesh
Renuwal work of partial part of main city road of District Jhansi (Old National Highway No-25) from Shivpuri bypass to Divisional Commandant Homeguard office through Vadhwa petrol pump of Pali pahadi in km 1, 2, 3, 4(050).
Road Signage work from Rae Bareli Varanasi National Highway No-31 to Dharupur-Lalganj Marg via Sarai Janmati Rampur Power House Pure Shiva Vaishya Karan Rai Pure Jodha Manna Ka Purva Kotila Asrahi Sarai Narayan Singh length 12.150 km.
CONSTRUCTION OF NEW A SITE RETAIL OUTLET Between KM stone No. 113 and KM Stone No. 117 on agra mumbai National Highway On RHS while going to Mumbai from Indore UNDER INDORE DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
WORK OF DETAIL SURVEY OF 132 KV SALEMPUR-LAR TSS LINE IN BETWEEN SALEMPUR-SIKANDARPUR FOR SHIFTING OF TOWER No. 34 B5 AND 35 B5 DUE TO CONSTRUCTION OF PROPOSED NATIONAL HIGHWAY 727 B DEORIA BYPASS UNDER ETD, DEORIA
Construction of C.C Road and Drain At ward N0 -06 NHAI Road waya Sugar Mill Boundary to Sanjay Singh House Bijnor
SUPPLY AND WORK OF OPGW EARTHWIRE FOR CONSTRUCTION OF 132KV SAHUPURI-CHUNAR DC LINE FROM LOCATION NO. 77 TO 90 (NHAI)
CONSTRUCTION OF PERMANENT OFFICE BUILDING IN RESPECT OF PROJECT IMPLEMENTATION UNIT (PIU) AT NHAI, PRAYAGRAJ (SH TOPOGRAPHICAL SURVEY AND SOIL INVESTIGATION)
Work of Laying interlocking tiles near the Ari Force boundary under the NHAI Bridge in Jajmau Ward 58 Under Zone-02
Maintenance of NH-731B Km 49.200 to 86.500,NH-124D, NH-135A Km 147.000 to 155.600,NH-124C, NH-727B Km 58.100 to 102.000 under the STMC on percentage rate basis for the yr 2023-24 under the jurisdiction of NH Circle PWD Prayagraj in the State of UP
Construction of CC Road at NH 28 Se Santkabir Inter College Tak Block Kaptanganj Distt Basti
SR ON NH 91 KM 282 TO DHUMASPUR VIA DURJANPUR HUSAINPUR ROAD
Engagement of user fee agency through e-quotation at Aihar Fee Plaza at km 172.890 for the section (Raebareilly to Banda Section) of NH-232 in the state of Uttar Pradesh
Engagement of user fee agency through ETender at Dabhedi FP for Four laning of NH-709B from km 92.200 to km 155.025 near Saharanpur Design length 62.772 km in Uttar Pradesh
IE Services for supervision of Shivpuri to Jhansi from Chainage.km 1305.000 to Chainage km 1380.300 of NH 27 in Madhya Pradesh on toll operate maintain and transfer basis (InvIT Bundle 2)
Implementation of Road Safety Works on Six Lane of Etawah to Chakeri Section of NH 2 from Km 323.475 to Km 483.687 in the state of Uttar Pradesh on EPC Mode
4laning of Agra Aligarh Sec from Km.0.000 (junc of NH34 Aligarh)to Km.28.000(near Asroi vill in Hathras)in UP on HAM mode under NH(O)Scheme (PKG-I).
Operation and Maintenance of Ashram to Badarpur Elevated Highway Section of Delhi Agra Section of NH 44 from Km. 8.600 to Km. 16.100 in the State of Delhi for 01 year
Electrification Work of ROB-504, NH-2 to UPSIDC Road in distt. Agra
Renewal of NH-74 Km 62 to NH-74 Km 64 via Gadeekpura
Special Repair of NH 28 C to Chaukaghat Sub road (Old NH 28C)