Loading…
Loading…
4,233 results • Best match
Empanelment of Transportation agencies for Evacuation of 40 LMT ash from ash ponds MTPS and nuisance free transportation along with disposal of the same in cast mines/Stone Quarries/NHAI projectsites other designated places of MTPS
Construction of R.C.C Drain from the house of Manik Saha to NH-512 via the house of Ranjit Sarkar at Kayastha-Para in ward No-06 under Gangarampur Municipality
Landslide Protection Work at Mangchu Forest Village at NH 10, Sangsay G.P. in P.S. Kalimpong.
SPLIT NUT BRACKET SET FOR HMT MAKE LATHE MACHINE NH-22. HMT PARTSNUMBER: - 730052444., SPLIT NUT SET (METRIC) FOR HMT MAKE LATHE MACHINE NH-22. HMT PARTS NUMBER: - 730052453.
Harvesting / felling of 566 nos. trees at Belgharia Expressway (NH-2E) i.c.w construction of service road on both side including creation of depot, repair of labour shed, installation of Solar Lights in North 24-Parganas District.
NH-31C AT KHAYERBARI GP OFFICE TO SIALDANGA VIDE PACKAGE NO WB -10-84 (Post 5 years PMGSY Maintenance Works )
Emergent temporary restoration work of rain damaged road side edge wall at 26.20 km of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Consultancy services for preparation of detailed project report for 4 laning of NH-60 New NH-14 from km. 115.000 Kharagpur to Km 422.450 Moregram in the State of West Bengal
Emergent temporary restoration work of rain damaged road side edge wall at 24.90 kmp of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Emergent temporary restoration work of rain damaged road side edge wall at 26.50 km of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Emergent temporary restoration work of rain damaged road side edge wall at 24.60 km of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Emergent temporary restoration work of rain damaged road side edge wall at 26.60 kmp of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Emergent temporary restoration work of rain damaged road side edge wall at 24.70 kmp of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Repairing of damaged Black top surface in stretches from km 4.50 to km 9.00 of NH-10 under NH Division IX in the district of Kalimpong during the year 2021-22.
Emergent rain damaged restoration work at 33.70 km of NH-10 due to heavy rainfall on 03.08.2022 under NH Division IX in the district of Kalimpong during the year 2022-23.
Supervision Consultancy Services during Operation and Maintenance stage for Ghoshpukur to Dhupguri section of NH-31D and Salsalabari to Assam Bengal Section of NH-31C in the state of West Bengal
Repair and maintenance of existing Purulia_JHR_Balarampur-Chandil Section of Old NH-32_New NH-18 from Km 140.280 to Km 142.100 and Km 143.920 to Km 153.705 in the state of Jharkhand
Repairing of road from Belkash National Highway More to Nala Health Centre under Burdwan I, Burdwan Planning Area. (2nd Call)
Repairing and maintenance work of National Highway Division II Office ground floor interior portion in the district of Paschim Medinipur
Route survey and way leave permission along and across of National Highway at Palasia_Dantan_Bhetiamla_Angua PWSS of Midnapore Division PHE Dte.
Road Safety works by providing Thrie metal beam crash barrier on NH-117 New NH-12 from Km. 22.76 Km. to Km. 34 Km._km 56 to km 64 and km 80 to km 94.50 under NH Division-I in the Dist of South 24-Pgs. during the year 2022-23 under Road Safety Annual
Short term maintenance under Original Repair works for stretch at selected location between km 7.750 to km 11.750 of NH-114A in the District of Birbhum during the year 2024-25. (Job No. NH-114A/WB/2024-25/STMC-19)
CONSTRUCTION OF COMMUNITY TOILET AT GATHLU MORE BESIDE NH 34 AT BANKUR SANSAD
NH 60 Checkpost to Peardoba Bus Stand within Bishnupur Block. Length 4.970 km.
Construction of PCC Road from NH-32 Shellac Cluster under Balarampur Panchayat Samiti
CONSTRUCTION OF DRAIN FROM HOUSE OF MRITYUNJAY DAS TOWARDS NH-60 AT-SASTANAGAR
CONSTRUCTI ON OF NEW DRAIN FROM ALLADINA HOUSE TO NH 6 AT SRIRAMPUR
CONSTRUCTION OF CEMENT CONCRETE ROAD FROM NH 81 TO HCPUR COLLEGE AT PIPLA
CONSTRUCTION OF CC ROAD FROM NH-6 TO HOUSE OF HAYDAR LASKAR HOUSE
PCC ROAD NH-31 to Nirupama Ghosh at South Moradanga Under Maruganj G.P
CONSTRUCTION OF PCC ROAD FROM SHIB MANDIR TO NH-2 AT BABUISOL VILLAGE
Construction of Concrete Road from Pintu Nayek Shop to NH 60 at Lapur
Construction of CC Road from NH 81 House to Niranjan Land at Nakatti
Construction of CC road from NH 81 to anawar alam house at bhagabanpur.
Construction of Concrete Road from NH - 60 to Radhamadavpur Club at Surmanagar Sansad
Repairing and Upgradation of Bituminious Road from Pandabeswar NH 60 towards Nabagram Village
CONSTRUCTION OF CONCRETE DRAIN FROM NH 60TO SUDARSHAN MANDAL HOUSE AT MOUZA LAPURIA
Provision of Wheel wise Load Measurement By EIMWB for NACC & NH Weigh Bridge
Sinking of Submerssible pump near BJMPM office beside NH-6 of Panchrulia Samsad
CONSTRUCTION OF CONCRETE ROAD FROM NH 60 TO BAIKUNTHASINI MANDIR AT MOUZA BHEDUASOL
PCC Road from NH to Sukaru House via Jahiruddin House at Surjapur West
Imp. of Road from Lagda Laxman Bouri House to NH via Garagara Bridge
Construction of road from Basudeb Pramaniks House to NH 16 with Guard wall
BALAPARA NH 31 TO RAJYAPARA VIA JALIAPARA CHOTO CHAUDHARY PARA, Length. 5.320 Km
Special Repair Work of the Road NH 31 - Pachgachia vide Package No WB1579B.
NH-34 Connection to Pargram and Domohana to Chownogara bearing Package No WB15MTN16.
RESTORATION OF JHORA FROM NH-55 TO GADDHI LINE IN P.S. KURSEONG, G.T.A.
Construction of PCC road from NH 34 to Khetrabari Masjid at Khetrabari Sansad
REPAIRING OF DRAIN FROM BIJAY RASAILY HOUSE TOWARDS NH 10 PS NO 257
Repairing of drainage from NH 34 to shop of Fajer Ali at Arkhali