Loading…
Loading…
4,251 results • Best match
Construction of 180 Nos Anchor Block for supporting and placing in position of Secondary Rising main lay along NH - 35 of road side ditches in connection with Habra Gaighata Surface based water supply scheme in the district of North 24 Pgs.
Auction for cutting, felling and removing of 14 nos. standing trees of various species for Access permission to the private property of Panachwati Greenfield Realty Development Pvt. Ltd. at Chakbagi at km 30.047 (LHS) of NH-117, Dist. S24 Pgs, WB.
Development of Junctions where lower hierarchy road (VR/ODR) meets hierarchy road (NH/SH/MDR/ODR) in Siliguri District for Road safety on Rural Roads under Road Safety Annual Action Plan 2024-25 on T-06 (Laxmansinghjote) to Kaduvita under Ghoshpuk
Micro tunneling with 200 mm and 160 mm dia HDPE Pipe and laying of 33 KV , 3C, 400 Sq mm and 11 KV, 3C, 300 Sq. mm XLPE cable for NH-6 crossing from Mahishrekha bridge to Kolaghat under Uluberia Division
Construction of Concrete Roads from the house Amerul Mallik house to Sajahan Malida, Narayan Dhara, Sk Intaj, Haradhan Maity house via Balughata road and Madhu Maity house via Samanta Pally to NH - 41, under Ward No.- 18 within Haldia Municipality
Maynaguri to Changrabandha (upto Indira More), Maynaguri Railway Station to Mng. Town upto NH-31 and Mng. To Burnish road from ch. 0.00kmp to 1.40km, 0.00kmp to 2.00kmp and 0.00kmp to 2.60km respectively for emergent repairing of potholes and damaged
Construction of Paver Block Road from Checkpost Baidara NH-34 road to Sonadangi Alim Tea Shop more under Joyhat G.P. within Itahar Block in the district of Uttar Dinajpur. (Total Length- 4.00 Km,Width- 3.75M. Protection Work Drum Sheet Piling -500.00
Installation of solar light from Dharampur NH-6 Bypass River Bandh to Raniara Marufa Enterprise River slop approx 1 KM under Gobindanagar GP,Jl No. 99 Mouza Dharampur,Plot No. 13 and Mouza. Raniara,Jl No.100,Plot no.963.
R.C.C. Bridge over River Mara Nawtara at 0.7 km of Dawaguri Bazar to Kaljani Health Centre Road at 789 km on NH -31, Reconstruction by replacing old steel bridge under Cooch Behar Highway Division in the district of Cooch Behar.
NH 34 (Mira) Health centre Road from 0.00 kmp. to 5.00 kmp. Emergent restoration and repairing works in different stretches with potholes repair including 20 mm. P.C. and S.C. under Plassey Highway Sub Division of Nadia Highway Division No. I
Construction of CC road from NH 31 to Samsan Ghat at Nembutary Mouza Kantivita JL NO 87 under Phansidewa Bansgoan Kismat GP within Phansidewa PS under 15th FC (Un-tied) 2024-25 (Phase-II). (Activity Code - 98055418) Job no 06
Rajganj Sankrail Road with a link to NH-6, from 0.00 km to 4.25 km, Strengthening work and 0.20KM to 2.0 KM Restoration work of PHE cutting for laying pipe line under Howrah Highway Division in the District of Howrah
Development of Junctions where lower hierarchy road (VR/ODR) meets hierarchy road (NH/SH/MDR/ODR) in Siliguri District for Road safety on Rural Roads under Road Safety Annual Action Plan 2024-25 on Road from Mohanlaler Chhat to Paharghumia T.E
Providing round the clock security by deploying 8 nos. Eight Zone A 3 Nos. and Zone B 5 nos Per day of Security Personnel without arms on purely temporary basis of different categories for guarding different premises under NH Divn II
Construction of RCC Pipe Supporting structure for supporting 350 mm dia D.I. pipe along the NH-35 for 500 mtr length in connection with surface water based water supply scheme for arsenic affected area of Habra-Gaighata and adjoining mouzas
Supplying and laying of 200 mm dia (ID) M.S pipe conduit 95m length (12mm thick) through 800mm dia. M.S casing ( not below 16 mm thick ) Kona expressway(NH-117) beside Moukhali khal by Jack pushing technique for water supply pipe
Repairing of Damaga Distribution Pipeline and Rising Main Pipeline due to widening of NH Road and Leakage of Pipeline and Interconnection Between Rising main and Distribution and Rising main with New CWR at Balarampur Zone-II W/S Scheme under Balar
Relaying laying of distribution pipe line and Rising main due to widening of road NH 512 Hili Balurgha under the commandary of Nunail piped water supply scheme within Balurghat Block in the District of Dakshin Dinajpur under Balurghat Division PHE
Supplying of 10(Ten) No. Security Personnel ( Security Guard without Arms) in Zone-B on purely temporary basis for guarding at different Govt. Stack yard, offices etc. under the jurisdiction of EE, NH Divn-V, P.W.(Rds)Dte.(3rd Call)
Emergent restoration of ditches and surfacing work of NH 2 By-pass to Naity road via Gobra R.S. from 0.0 km to 0.800 km of Serampore Bridge Highway Sub-Division under Hooghly Highway Division No- II in the district of Hooghly
Bank Protection work along the Left Bank of river kaljani for a length of 185m at down stream of PWD road Bridge on NH-31 to upstream of Railway Bridge within Tufanganj-I Block in P.S- Tufanganj, Dist-Cooch Behar.
Relaying and laying of rising main and distribution pipe line due to widening of road NH 512 Hili Balurghat under the commandary of Teor piped water supply scheme within Hili Block in the District of D Dinajpur under Balurghat Division PHED
Supply installation operation of 2 Nos 10 HP capacity diesel operated surface dewatering pump (hiring basis) including the supply of POL with the incidental charges at Kona more on NH 6 near B.D.O office, to be executed by MED 2022-23
Post 5 Years BGSY Maintenance Road From Dakshin Gopalpur North (Nh-41) Joykhali to Jasora Kalibazar within Panskura-I P.S. Under Purba Medinipur Division, Package No. WB-19-ADB-03, Estimated Length.10.00 km(ch. 12 Km To 22 Km)
Construction of Paver Block Road with protection, slab culvert, cross drainage work from NH-17 to Samaj Kalyan Sangha via Rama Nath Das house under Maruganj G.P. at Tufanganj-I Block in the district of Cooch Behar. (Length-1690.00 m)
Construction of Paver Block Road from Rail gate to Debendra Pathagar via NH 48 to Wasim Akthar House via Ratiram Oraon to Nitya Ray part no- 14/118, 119, 120 under Rangalibazna under Madharihat-Birpara Block in the District of Alipurduar
Construction of pathway along the ROW (Purba Bardhaman side) in connection with Bridge over River Bhagirathi connecting Kalna, ch. 35.447 KM of STKK Road and Shantipur, ch. 96.30 KM of NH-34 under BNHD in the dist of PB (2ND CALL)
Repair, renovation of electrical installation and SITC of ac machines for the chambers of Chief Engineers, Superintending Engineers NH wing and P.W.(Roads) Dte. At the 2nd floor of Block-B,Khadya bhawan campus,Kol-87---SITC of AC machines.
Short term Maintenance Contract for 36.60 Km from Km 0.900 to km 27.500 and km 29.500 to km 39.500 of NH 131A under N.H. Division No. VII P. W. (Roads) Directorate in The Districts of Malda during the year 2025_2026
Development of Junctions where lower hierarchy road (VR/ODR) meets hierarchy road (NH/SH/MDR/ODR) in Siliguri District for Road safety on Rural Roads under Road Safety Annual Action Plan 2024-25 on Road from Lodhabari to Velkujote under Binnabar
Construction of concrete road from NH-41 (Plot No 226, JL-14) to Harasankar-Ranichak Pry School(Plot No-137, JL-13) Mouza- Hoglberiya and Harasahankar-Ranichak Under Balluk-II GP under Sahid Matangini Dev. Block (PDF SL NO-235)
Construction of 210 Nos Anchor Block for supporting and placing in position of Secondary Rising main lay along NH - 35 of road side ditches in connection with Habra Gaighata Surface based water supply scheme in the district of North 24 Pgs
Feasibility study, fixation of alignment for construction o 2 (Two) nos bridge A) Bakbandi Bridge over river Nuni at Khankhowa More near NH-19 B) Blue Factory Bridge over deep channel near Blue Factory over RCI Road under Asansol Highway Division
Emergent inside repairing and maintenance work of A5 quarter at Old NH Campus in the year 25-26 at Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26
Left out portion of NH-2 to Durgapur Barrage Road (SH-9) from 6.00km. to 6.10km strengthening work of the existing carriageway under Asansol Highway Division, P.W. (Roads) Directorate, in the district of Paschim Bardwan during the year 2025-26
Construction of Side Drain from (A). Rajjak Sk house to Barjahan sk at Village Mangaljone (B). NH 34 to Badar sk house at Village Mangaljone (C). Sakim sk house to Jahangir house at Village Mangaljone under Kanupur G.P, P.S- Raghunathganj-I
Inside repairing and maintenance work of A4 building at Old NH Campus in the year 25-26 at Asansol Highway Sub-Division under Asansol Highway Division, P.W.(Roads) Directorate in the District of Paschim Bardhaman, during the year 2025-26.
i) Quarterly AMC of BHMS ( Bridge Health Monitoring System) for 4- Lane Majerhat Bridge (ROB) adjacent to Majerhat Railway Station at 5.8 Km on Diamond Harbour Road (NH-117), Kolkata, West Bengal, under Howrah Highway Division in the District of How
AMC for Supply, installation,operation of Motor/Diesel operated surface dewatering Pump (Hiring) having capacity 10 HP,30 HP..at Belur Railway Station,G.P- Bally,Kona More on NH-6 near BDO Office, G.P-Chamrail..2023-24(w.e.f. 15.06.23 to 31.10.23)
Supplying 11 Nos. of Security Personnel (Security Guards without Arms) per day in Zone-A and Zone-B on a purely temporary basis for guarding different Government stack yards, offices, etc. under the jurisdiction of the EE, NH Division-V
Emergent Temporary Patch Repair of severe Hard Shoulder damaged stretches at PHE pipeline cutting Area due to prolonged unrestored condition from 3 km to 5.5 km LHS of NH-34 to Tarapur Balagarhghat Road under RHSD of Nadia Highway Division-II
Preparation of Detailed Project Report DPR for Construction of Twin 3 Lane Sukhani Bridge with both side approaches in replacement of the old existing Bridge at chainage Km 116.742 of NH31C New NH17 EE NH DIV IX PWRD SILIGURI WB
Preparation of Detailed Project Report DPR for Construction of Twin 3 Lane Neora Bridge with both side approaches in replacement of the old existing Bridge at chainage Km 630.895 of NH31 New NH17 EE NH DIV IX PWRD SILIGURI WB
Preparation of Detailed Project Report DPR for Construction of Twin 3 Lane Juranti Bridge with both side approaches in replacement of the old existing Bridge at chainage Km 609.768 of NH31 New NH17 under EE NH DIV IX SILIGURI WB
NH-34 Mira Plassey to Kaliganj Health Centre Road from 0.00 kmp to 8.00 kmp, emergent installation of Rumble Strip, speed breaker By Bituminous of Plassey Highway Sub-Division under Nadia Highway Division No-I, in the district of Nadia.
Repairing of Cement Concrete Roads 1. From Zamsed khan House to Mahaboob House at Khanpara, 2. From NH-31 to Adhibasipara, 3. From Madan Bosak House to Sidan Bosak House at Bosakpara at Nichitpur of ward no 14 under Dalkhola Municipality.
Refer to BOQ
Annual Maintenance and repair to Sanitary and Plumbing work at inside, outside of different quarters, as and when required as per DSR -2023 of CPWD, PWD (NH) schedule of rates at Sraboni Abasan under Salt Lake Drainage Sub-Division of B.M.S. Div.
Special repair work (1 no 3x5mx5m Box cell Culvert, Boulder Apron and 55m approach road) under P5Y maintenance work in respect of BGSY road from T07(NH-31) AT BALLABARI TO DAMDIM BAZAR, Package no-WB1060(B), Block-Mal under Jalpaiguri District