Loading…
Loading…
257 results • Best match
Splice Closure for Optical Fiber Cables (Q3)
Procurement of Optical fiber preparation toolkit at KBUNL.
Welch Allyn Fiber Optic Macintosh Laryngoscope set with LED (69696-LED)
Welch Allyn Fiber Optic Macintosh Laryngoscope set with LED (69696-LED)
Optical Fibre Splicing Machine as per TEC Specification (Q2)
Optical Fibre Splicing Machine (V2) asper TEC88090: 2012 (Q2)
STAR The Fiber Expert Optical Fibre Splicing Machine 5 Inches
OFC laying work anywhere in Bihar for route in Ratwara Mahua Samastipur mahuwa Munger sultanganj Bhagalpur sultanganj Bhagalpur naugachhia Bhagalpur amarpur banka gaya Fatehpur rajauli
W90418109141 FIBRE OPTIC GENERATOR END WINDING VIBRATION MONITORING SYSTEM FOR 16 CHANNELS ALONGWI H, (W90418109192) FIBRE OPTIC SENSOR WITH CONDITIONER& 6 MTR INTEGRATED CABLE FOR GENERATOR EW VIBRATIO, (W90418109206) FIBRE OPTIC SENSOR WITH ... OF FIBRE OPTIC GENERATOR ...
Unbranded Single mode optical fibre as per G.657A 4F OF Drop, Unbranded Single mode optical fibre as per G.657A 4F OF Drop Cable FTTH Application (G.657A Fibre)
Unbranded Single mode optical fibre as per G.657A 4F OF Drop, Unbranded Single mode optical fibre as per G.657A 4F OF Drop Cable FTTH Application (G.657A Fibre)
unicab Single mode optical fibre as per G.657A 4F OF Drop Cable, unicab Single mode optical fibre as per G.657A 4F OF Drop Cable FTTH Application (G.657A Fibre)
unicab Single mode optical fibre as per G.657A 4F OF Drop Cable, unicab Single mode optical fibre as per G.657A 4F OF Drop Cable FTTH Application (G.657A Fibre)
Optical Fibre Splicing Machine (V2) as per TEC 88090:2012 (Q2) (3 (3 ))
Splice Closure for Optical Fiber Cables Bidder Turnover (Last 3 Years) 150 Lakh (s)
Splice Closure for Optical Fiber Cables Bidder Turnover (Last 3 Years) 150 Lakh (s)
Splice Closure for Optical Fiber Cables Bidder Turnover (Last 3 Years) 300 Lakh (s)
Electronic Workbench to perform fiber optic experiment Laser Source and Detector Optical Power Meter, Coarse Wavelength Division Multiplexing with Fiber Bragg Grating Module with Working bench, GPON FTTx Fiber Optics Network Training System with ... Advance Fiber Optic Communication ...
Camera for CCTV System (V3) (Q2), Video Recorder for CCTV System (V2) (Q2), Optical Fibre Cable for Networking (Q3), Online UPS (?10 KVA) With Battery Conforming To IS 16242 (Part 1) (Q2) (3 (3 ))
Third Party Inspectors for inspection of Laying of Optic Fibre Cable in different sections of Pipelines under Easter Region Pipelines of India Oil Corporation Limited, Gr A Under Barauni HQ , Bihar Jurisdiction
Indra-Heera Copper Ethernet to Fibre Optic Media Converter Brand: Indra-Heera (Detailed Description/Specification as per Product # 1 of GeM Contract No. GEMC-511687700917247 dt.28/07/2026)
Set of fibre Optic Cable comprising of 08 items as per Annexure attached. Specn/ Drg No :- CLW Specn No : CLW/ES/3/0141 ,CLW Drg NO- CLW/ES/3/SK- 1/0141
Deployment of maintenance team for maintenance of optic fibre cable network and upkeep of associated gears like AC, DG, Stabilizer, Change over unit, Shelter and Wi-Fi Equipments in Patna Section of RCIL/ER for a period of 2 years and extendable by one year on same terms and conditions
RECTIFICATION AND STRENGTHENING OF STATOR WINDING OVERHANG OF U-2 AND MOUNTING AND COMMISSIONING OF FIBER OPTIC END WINDING VMS OF U-2 AND U-1 GENERATOR WITH ASSOCIATED WORK AT BRBCL NABINAGAR 250 MW.
Maintenance of OFC in ETR Patna SR
Design, Erection, SITC of AFL, Supply and Laying of LT power cable and OFC cable
OFC CONSTRUCTION AND ALLIED WORKS REHABILITATION AND CONVERSION FROM MINILINK TO OFC UNDER MUZAFFARPUR OA
OF Cable laying between Gangta BSNL Telephone Exchange and Laxmipur BSNL Telephone Exchange by OPEN TRENCHING/MICRO TUNNELING Method.
12F unarmoured double HDPE sheath OFC (Q3), 24F unarmoured double HDPE sheath OFC (Q3), 48F unarmoured double HDPE sheath OFC (Q3)
OFC CONSTRUCTION WORK IN SAMASTIPUR OA
OFC CONSTRUCTION WORK IN MADHUBANI OA
OFC CONSTRUCTION WORK IN SAHARSA OA
OFC CABLES Single mode OS1 LSZH Fibre Cable For, OFC CABLES Single mode OS1 LSZH Fibre Cable For Networking
CABLE, FIBRE OPTIC, 6CORE, SINGLE MODE, 1" HDPE FIBER PIPE
Custom Bid for Services - PS10 OFC MAINTENANCE VEHICLE
Cluster Outsourcing for Maintenance of Landline and Broadband network – OFC Network - DIGGING AND LAYING OF OFC; Attending all types of cable faults
Pigtails for Fiber Cable Connection (Q3), Fiber Optic Patch Cord (Q3)
Please refer Tender Document
SUPPLY OF AXKP110-INSTRUMENTATION and ELECTRICAL CABLES and AXKP110A FIBRE OPTIC CABLES
GTD/Plg/E-Tender/OFC Construction Work/4G Project/Gaya BA/2022-23 Dated 24.09.2022
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works in Ekangarsarai Hulasganj 48F OFC Route
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works in Khagaria Begusarai 48F OFC Route
Custom Bid for Services - INST COMM 4 MP BULLET CCTV CAMERAS, Custom Bid for Services - SUPPLY INSTALLATION FLP ENCLOSURE DUAL COMPARTMENT, Custom Bid for Services - SUPPLY LAYING OF OPTICAL FIBER CABLE SINGLE 12C ARMOURED, Custom Bid for Services - ... OF OFC CABLE , ...
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works for Ara Bihia Buxar 48F A OFC Route under Patna BA CNTxE Similar Category Cluster Outsourcing for Maintenance of ... – OFC Network
Custom Bid for Services - AMC OF POWERGRIDS UNDERGROUND OFC NETWORK IN PATNA
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works in Samastipur TE Tajpur TE 48F OFC Route
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works in Khagaria TE Munger TE 48F OFC Route
Custom Bid for Services - PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works in Barauni Zero Mile to Dalsingsarai 48F OFC Route
Custom Bid for Services - Custom Bid for Services PLB Pipe Laying by HDD and Open Trench method OF Cable Pulling OFC Splicing Earthing and associated works in SikandraPakribarwan 48F OFC Route