Loading…
Loading…
25 live14 closing this weekmost from E-IN-C BRANCH - MILITARY ENGINEER SERVICES and MUNICIPALITIES ANDHRA PRADESH
25 results • Best match
Proposed 248 KLD Bulk water supply connection for laying of 250 mm dia DI pipe line from newly constructed water tank at ramaraju layout to cognizant work site sump at Midhilapuri 100 feet road - IT SEZ road in Ward no.8 of GVMC, Madhurawada Zone
PROCUREMENT OF COMPLETE JEE MAKE SUMP PUMP ASSEMBLY AND SPARES FOR CSSPPIT AT TP 7 IN NTPC SINGRAULI
REPAIR MAINTENANCE TO IMPROVE THE STANDARDS OF HYGIENE SANITATION CLEANING OF OVER HEAD WATER TANKS AND CONNECTED WORKS IN THE BUILDINGS OF AREA D AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE(I) DM VISAKHAPATNAM
REPAIR MAINTENANCE TO IMPROVE THE STANDARDS OF HYGIENE SANITATION CLEANING OF OVER HEAD WATER TANKS AND CONNECTED WORKS IN THE BUILDINGS OF AREA A AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE(I) DM VISAKHAPATNAM
Periodical maintenance by providing Distempering, painting, emulsion to Staff Quarters , Service buildings, platform shelters, FOB's, water tanks etc from PDU to KUK stations on Main Line under the jurisdiction of Sr.DEN/East/VSKP.
REPAIR MAINTENANCE TO IMPROVE THE STANDARDS OF HYGIENE SANITATION CLEANING OF OVER HEAD WATER TANKS AND CONNECTED WORKS IN THE BUILDINGS OF AREA B AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE(I) DM VISAKHAPATNAM
Construction of 60KL Sump at Gollagudem H/o Pedapatnam GP (of Machilipatnam Mandal) Est Cost Rs:7.00Lakhs
REPAIR MAINTENANCE TO IMPROVE THE STANDARDS OF HYGIENE SANITATION CLEANING OF OVER HEAD WATER TANKS AND CONNECTED WORKS IN THE BUILDINGS OF AREA E AND DAS AT NAVAL DOCKYARD VISAKHAPATNAM UNDER GE(I) DM VISAKHAPATNAM
Day to day maintenance replacement of water ranks cleaning of water tank connected plumbing works in Technical Area and Residential area at NSTL Visakhapatnam
Providing RO Plant and Sump Well at NIDM in Kondapavuluru village of Gannavaram Mandal Est Cost RS:20.00 Lakhs
Miscellaneous Civil Works at Keepakam area i.e, Footpath at admin complex, repair works to existing compound wall attakanithippa and RCC OHT, Painting of WTP and Library complex, SDSC SHAR
Supply installation testing and commissioning of submersible sewage pumps, pump control panel and associated UG cable work for newly constructed sewage sump at ESIC Regional Office Gunadala Vijayawada AP Subwork/Packages: one
Laying 200mm Dia pipeline including sump, pump house and pump set etc., in Bheemunipatnam zone to facilitate the 350 KLD Bulk water supply connection to M/s: Maira Bay View resorts, Visakhapatnam (AP Tourism PPP mode Govt project)
Proposed 200 KLD Bulk Water Supply Connection - Laying of 200 mm dia DI Pipeline from the existing 400 mm dia DI gravity main at Yendada Balancing Reservoir to MVV CITY gated community sump in Ward No.08 of GVMC
Laying of HDPE Pipeline From NTR Circle to Ramireddy layout sump in Madanapalle Municipality
Construction of 200 KL Sump and Extension of pipeline in Kolimigundla Village of Kolimigundla Mandal
Providing inter connections to the existing sump and ELSR located at R&B reservoir in Nandigama Municipality
Drilling of borewells at chippili summer storage tank to vempalle sump to ensure regular water supply in Madanapalle Municipality
Laying of HDPE Pipeline From Chippili summer storage tank to Vempalle Sump for supply of Regular water to Madanapalle Municipality
Fabrication & replacement of worn out liner and mother plates, deck/sealing sheets in various chutes & conveyors, in vibrating feeders and hoppers of Wagon Tipplers 1-4, stringers supports & fabrication, reconditioning & refixing of sump pumps as and when required during the period from 01-10-2026 or from the date of commencement of work to 31-03-2027 in M-I(Conveyors) Sub-Divn., MM (CHP)/Stage-I&II/ Dr. NTTPS
Replacement of existing old damaged 250mm dia AC Feeder main with 250mm dia HDPE feeder main from Transformer No.SS 186/BLG Belagam water tank to EP No.SS/43/A7 mydanam veedhi, Parvathipuram Municipality
Up keeping by clearing of emergency jammed coal and slurry coal at various chutes and various jammed places of junction Towers, sump pump pits,conveyors-23, 16A/B, 17A/B, 18A/B, 19A/B, RFC-3,4 and conveyor-24 in M-IV Sub- division of MM/CHP/Stage-III/Dr. NTTPS as and when required during the period from 01-10-2026 or from the date of commencement of work to 31.03.2027
Providing bore well, Motor pump set , construction of Water Sump, and Hand railing for Control House etc works at existing 132/33KV Switching Sub-station , Beechiganiapalli in Sri Satya Sai District
Supply Fixing & Commissioning of Pumpsets and construction of Sump cum Pump house for the Rapid Filling of New Summer Storage Tank in Garlapadu Road in Ward No16 Phase II of Sattenapalli Municipality under Tied grant of 2021 to 22 1st & 2nd installments in 15th Finance Commission Grant 2nd call