Loading…
Loading…
3,503 results • Best match
Hiring of 1 No of 5 KL capacity water tankers for filling the syntex tanks and sump at Durgangar and for supplying of drinking water to the un served / ill served areas under A.E-17 section (2nd call)
White Washing, Leakage of Rooms, Flooring in Dining Hall, Water Sump, Electrification repairs, Mosquito Mesh, Repairs to Doors & Windows, Compound Wall, Const., of Bath Rooms etc., to Govt. BC Boys Hostel at Gudupalli (V&M) in Chittoor District.
White Washing, Leakage of Rooms, Flooring in Dining Hall, Water Sump, Electrification repairs, Mosquito Mesh, Repairs to Doors & Windows, Compound Wall, Const., of Bath Rooms etc., to Govt. BC Boys Hostel at Gudupalli (V&M) in Chittoor District.
Providing Water Supply Arrangements to Earth Pits, Laying of CC Road, Construction of Drains, Repairs to Existing Toilets along with Construction of New Septic Tank, Soak Pit and Water Sump at 132KVSS, Puttaparthy in Sri Satya Sai District
White Washing, Leakage of Rooms, Flooring in Dining Hall, Water Sump, Electrification repairs, Mosquito Mesh, Repairs to Doors & Windows, Compound Wall, Const., of Bath Rooms etc., to Govt. BC Boys Hostel at Gudupalli (V&M) in Chittoor District.
Repairs and Annual Maintenance of 4 MLD STP at Kommadhi, 1 MLD STP at BakkannaPalem and Sump cum Pump Houses at Sevanagar,K3,Gayatri nagar and sagarnagar in Zone-II of GVMC for the period of 12 months.
Desilting and Reconditioning of infiltration wells and Realignment of 200mm dia MS Pumping main from I.F Well No. 4 to VEPZ Sump line at MGR Down Stream in AE-1MGD Section of GVMC Under Summer Action Plan 2026.
Improvements to water supply(Replacement of Alluminium Wiring with Copper Wiring for 3 no's panel boards for 150HP (2No's) in sump for HLR reservoir fitting Motors) at HLR Pump House in Div No.32 under AE-1 Section.
Providing Of CC Road From Water Sump To Pole No. RGK-6/4 & RGK Apartment To Maruthi Suzuki Service Centre In Rajeev Gruha Kalpa, Auto Nagar, Ward No 32 under 15th FC 2024-25 1st Instll. Untied Grant.
Providing water supply facilities like ELSR, pumping main and distribution lines with digging of bores and sump with pump house for VMRDA layout in Sy.27/2,3 and 44/1P,2P of Nidigattu (V) Bheemunipatnam Mandal, Visakhapatnam District
Specialized work of structural repair and water proofing treatment to columns and walls and inside bottom dome slab of Magunta Layout 500KL Sump by providing Gunting and sand blasting at Magunta layout Pump House in Division No.21
2022-HOR01-CB-116 - Proposals for raising by 2400 Nos of Avenue tree plantation 12 km in Gajuwaka zone area ( BC road to Fire station , Iala jn to Yathapalem water tank, Ganapathi Enterprises to Gangavaram bus stop etc., )Including three months maintenance period.. Cost including Geo-Tagging of plantation.
Flushing and deepening of borewells at PNC school 46th div, Durganagar colony CRC centra 16th div, Balagurugan street Durganagar colony, Balajinagar nagar banckside of Municipal school, Balaji nagar near milk depot, Ambedkar Nagar near water tank (26th div) Balaji nagar bound street (26th div) in Chittoor Municipal Corporation
2022-HOR01-CB-116 - Proposals for raising by 2400 Nos of Avenue tree plantation 12 km in Gajuwaka zone area ( BC road to Fire station , Iala jn to Yathapalem water tank, Ganapathi Enterprises to Gangavaram bus stop etc., )Including three months maintenance period.. Cost including Geo-Tagging of plantation.
2022-HOR01-CB-116 - Proposals for raising by 2400 Nos of Avenue tree plantation 12 km in Gajuwaka zone area ( BC road to Fire station , Iala jn to Yathapalem water tank, Ganapathi Enterprises to Gangavaram bus stop etc., )Including three months maintenance period.. Cost including Geo-Tagging of plantation.
Providing CC Roads From 1)ele phole no162/a/13/2 to trannsfromer 2)D5/34/a5to399/B7 3) Pn rao house toRama Krishna house4)D5/294/a15 to transforome5)transforomer to water tank back side in Ward No. 05 Under General Fund 2018-19 Est Cost:24.50 Lakhs.
2022-HOR01-CB-116 - Proposals for raising by 2400 Nos of Avenue tree plantation 12 km in Gajuwaka zone area ( BC road to Fire station , Iala jn to Yathapalem water tank, Ganapathi Enterprises to Gangavaram bus stop etc., )Including three months maintenance period.. Cost including Geo-Tagging of plantation.
Construction of CC Drain and CC Culverts & CC Roads from Raj Kumar house to Ambedhkar Statue & papayamma house to Water tank Compound Wall & Rama mandiram to Public tap at Yenugurai Colony Bunga veedhi Ippili Veedhi in Ward No.12 in Vizianagaram Municipal Corporation Est Cost Rs.11.00 Lakhs.
Development of Park, Greenery and Pathways etc., along with construction of compound wall and ground raising for vacant site, beside Rajeev Nagar UDA Colony water tank in Division No 63, Circle-2 Rc. E3.PD.III(Parks)--107305/2026 .( 15th FCG ADP Improvement of Ambient Air Quality 2024-25)
Transportation of drinking water through hire tankers(5000 ltrs) capacity eddulasantha GLSR, Gandhi Nagar through direct tankers for the unserved areas of gadduru ciolony 11th ward gantavooru, indiramma colony 2nd ward, Rajeev Gandhi Colony 10th ward for the month of December 2016 in palamaneru municipality including fuel charges and salary and maintenance of engine and tanker etc complete(Total trips: 2325)
Transportation of water through hire tankers (5000 lts capacity) to Eddualasantha GLSR, Gandhi nagar, through direct tankers for the unserved areas of Gadduru colony 11th ward, Gantavooru, Indiramma colony 2nd ward, Rajiv Gandhi colony 10th ward for the month of Febraury 2017 in Palamaneru Municipality (Total 1395 trips) including fuel charges and salary and maintenance of engine and tanker etc., complete
APSPCL - KUMSP - Providing plantation along the toe of the Western & Southern bunds of the Ground Level Storage Reservoir (GLSR), Providing plantation in the vacant area of existing block plantation including maintenance of new plants & existing plants for two years by providing drip system and Providing Carpet Grass and plants at the site office building at Gani Village of Nandyala District, A.P
Annual Maintenance Contract of Cleaning of Clarifiers and Settling tanks at 33MGD Godavari Water treatment plant and 42MLD Water treatement plant and Cleaning of clear water sumps at 33.00MGD Godavari Water Treatment Plant & Godavari and Raiwada ... 2000KL GLSR s ...
Construction of Ancillary services facilities with allied Civil, PH, Electrical and Mechanical works, including i. Water treatment plant and 500 Cum domestic water GLR. ii. External water supply system. iii. 400 Cum raw water collection GLR cum pump ... Cum GLR and ...
PREVENTIVE MAINTENANCE AND REPLACEMENT OF U/S SPARES WITH ALLIED WORKS OF STANDBY DG SETS FOR FRESH WATER PUMP HOUSE AND MAINTENANCE, REPAIR AND CLEANING OF FRESH WATER RESERVOIRS, PUMP HOUSE INCLUDING PUMP HOUSE COMPLEX, CLEANING OF CLARIFIER, SUMP
REPAIR, MAINTENANCE OF FRESH WATER PIPE LINES, FIRE FIGHTING HYDRANTS, COPE POINTS, CLEANING OF SUMP AND PREVENTIVE MAINTENANCE OF PUMPS, MOTOR, DG SET AND CONTROL PANEL AND ALLIED WORKS AT VARIOUS LOCATIONS AT EOC JETTY UNDER NAVAL DOCKYARD VISAKHAP
REPAIRS/IMPROVEMENT TO RCC STRUCTURES, STEEL STRUCTURES , SEA WATER PUMP HOUSE AND SUMP ROOM AND OTHER CONNECTED WORKS IN PIPE LINE GALLERY AT N-17 JETTY TO N-22 JETTY AT NAVAL DOCKYARD, VISAKHAPATNAM UNDER GE (I) (DM) VISAKHAPATNA
Disinfection of Mudasarlova Raw water and Clear water in Sump cum pump house at mudasarlova park reservoirs Supply of Hygienic Drinking water, in Ward no 9 to 13 under AE-28 section of GVMC for the year 2021-2022
Annual Maintenance of Spillway Radial Gates, 70 KVA Generator and pumps at Sump well and maintenance of 100KVA transformer of Kalyani Dam near A.Rangampeta Village of Chandragiri Mandal in Chittoor District for the year 2020-21.(Item no.01)
Providing 200 KLD Bulk (clear) water supply connection to GITAM for laying of 150 mm dia MS pipe from Existing 250 mm dia HDPE pipe line to GITAM Sump at Rushikonda in Ward no.08 of GVMC, Zone-II.
Annual Maintenance of Spillway Radial Gates, 125 KVA Generator and Sump well and maintenance of 100 KVA transformer of Kalyani Dam near A. Rangampeta Village in Chandragiri Mandal of Tirupati District for the year 2024-25 (Item No.01)
Design, Manufacture, Supply, Delivery, erection, testing, trail run and commissioning of vertical turbine sump sets to run with 3.3 KV pole 1440 RPM capable of discharging 7000 LPM at head 180 mtrs. at Chinnakotla-Kadiri CPWS Schemes (3 Nos)
Annual Maintenance of Spillway Radial Gates, 70 KVA Generator and pumps at Sump well and maintenance of 100KVA transformer of Kalyani Dam near A.Rangampeta Village of Chandragiri Mandal in Chittoor District for the year 2022-23. (Item no.01)
Disinfection of Mudasarlova Raw water and Clear water in Sump cum pump house at mudasarlova park reservoirs Supply of Hygienic Drinking water, in Ward no 9 to 13 under AE-28 section of GVMC for the year 2022-2023
Renovation of erstwhile canteen of spinning mill for accommodating 400KV Lines Sub Division office, Arresting the water seepage into the oil collection sump from outside and providing store room for accommodating MRT Kits at 440/220KV Sub station, Sattenapali
Renovation of erstwhile canteen of spinning mill for accommodating 400KV Lines Sub Division office, Arresting the water seepage into the oil collection sump from outside and providing store room for accommodating MRT Kits at 440/220KV Sub station, Sattenapali
Construction of New Control House Building, Switch yard levelling, Metal Spreading, Balance Compound Wall cum RCC Retaining Wall, CC Drains, RCC Rain Water Sump and other miscellaneous Civil works at 132/33KVSS Bhimavaram in West Godavari District. (Re-call)
Arresting water leakage and other civil repair works of 15m height over head tank /OHT/ near VALF Admin building at SMP / ETF area and Construction of Engineers room at S200 Hardware Storage Building SHSB at SMP / ETF and Civil Renovation works to engineers room, Technician room and toilets in 6C Building at SMP / ETF area, SDSC SHAR.
Retrofitting to 7 Nos of existing CT s and PT s at Naval Canteen, Kotha Jalaripeta, Paindora peta, Jabbarathota, Kotha Agraharam, OPP CIFNET, ELSR Water tank at beeach road in Ward No.37 and 38(Old Wards No.22 and 24) in connection with SWATCH SURVEKSHAN 2021-22. (2nd call)
Glass, Water Gauge. Size: 3/4" O.D. x 19-1/2" long to EMD Part No. 9538379 for Water Tank Level Gauge HHP Locomotives. Note: The firms with past performance of the tendered/same items subject to submission of proof of documents such as POs/R Note are only eligible.
Repairs to 160 KVA Transformer at R.R Tank and Repairs & Rectification of Motors at various places of Water Supply Section (Vengamukkala Palem 5 Hp Bore Well, OHSR Pumping Clear Water Mortar, New Filter Bed, SS Tank-1, SS Tank-2, Old Filter Bed and ... Pelluru Water tank ) ...
Repairs to 160 KVA Transformer at R.R Tank and Repairs & Rectification of Motors at various places of Water Supply Section (Vengamukkala Palem 5 Hp Bore Well, OHSR Pumping Clear Water Mortar, New Filter Bed, SS Tank-1, SS Tank-2, Old Filter Bed and ... Pelluru Water tank ) ...
REPAIR MAINTENANCE OF FRESH WATER PIPE LINES FIRE FIGHTING HYDRANTS COPE POINTS CLEANING OF SUMP AND MAINTENANCE OF PUMPS MOTOR DG SET AND CONTROL PANEL AND ALLIED WORKS AT EOC JETTY AND SLIPWAY DEGAUSSING BAY UNDER GE (I) (DM) VISAKHAPATNAM
APGENCO-SRB-SRBPH-Fabrication of interconnecting pipes upto coolers headers (including T joint) by Dismantling of cooler headers from sump, cutting of CS pipe, bending at both ends, welding of flanges, testing at 6Kg/Cm2 of water pressure etc., at SRBPH
Providing BT Road with HOT mix process to 2nd cross road of Bharatmatha temple road connecting to RR peta sump road and providing BT road with hotmix process to Green park road and connecting road to RR peta in 52nd division
Repairs to 75 HP Motor and 20 HP Submersible motor and removing of wet silt in Inlet wells, shutter to screen chamber placing and fixing of submergible motor at UGD Pump house sump well at Suddapalli donka under AE-6 Section
Repairs to 75 HP Motor and 20 HP Submersible motor and removing of wet silt in Inlet wells, shutter to screen chamber placing and fixing of submergible motor at UGD Pump house sump well at Suddapalli donka under AE-6 Section
Providing BT Road with HOT mix process to 2nd cross road of Bharatmatha temple road connecting to RR peta sump road and providing BT road with hotmix process to Green park road and connecting road to RR peta in 52nd division
Repairs and Annual Maintenance to STPs at Marikavalasa, YSR Nagar, VAMBAY Colony, Boyapalem, Kommadhi, Bakkannapalem and sump cum pump houses at Sevanagar, K3, Gayatri Nagar and Attending Sewage pumping main leaks in Zone-I of GVMC for the year 2020-2021
Supply, Delivery testing and Commissioning of 110 KW WILO make Mixed flow pump set for parallel running with existing Wilo MF pumps with connected electrical and Mechanical accessories for Dead storage pumping from Krishna Barrage to Undavalli sump at Undavalli