Loading…
Loading…
5,047 results • Best match
REFER BOQ
Please refer to Boq
Please refer to BOQ
Please refer to BOQ
Refer BOQ
AS PER THE NIT ATTACHED
AS PER NIT
Refer BoQ
Refer BoQ
Please refer to Boq
BOQ
Please refer BOQ
Please refer to BOQ
constt of L/D from Mata Mandir to Magar house W.no-02 constt of L/D from link road to H/O Sardari Lal W.No-7 constt of L/D from water tank to H/O Kaku Ram W.No-7 constt of L/D from link roads to H/O Nini Mahajan W.No 7 Panchayat Bhaiya Hiranaga
Wheel Cylinder, HLA Rocker Set, Booster, Rear Brake Shoe, Sump Master Nut
Please refer BoQ
INJECTOR ASSY FUEL, ELEMENT AIR FILTER, GAUGE ASSY FUEL LEVEL, GENERATOR ASSY, OIL SEAL, ASSY AUXILARY WATER TANK
WATER PUMP, BRAKE HOSE, SPG BRAKE ACUTATOR, HUB OIL SEAL, AUX WATER TANK, FUEL FEED PUMP, BALL BEARING
Goods Transport Service – Per KM Based Service - WATER BOWSER 9 KL, Open Water; Water Tank Truck; Medium Tanker
HEATING ELEMENT 4 KW, LOW WATER CUT OFF DEVICE, WATER TANK GASKET, NUT BOLT, HEATING ELEMENT 2 KW
TOILET SHEET, WASH BASIN, GYSER, MIRROR, GLASS WINDOW, DOOR, TILES, WATER TANK, BRICKS, CEMENT BAG, TAPS, LIGHT 9W
PROVN OF 2 PVC WATER TANK AT DAYALACHAK GALAK AREA AND CERTAIN WORKS AT SAMBA UNDER GE SAMBA
Water Cooler, MS Frame, Stablizer, CPVC Pipe, Concrete, Electrical Connection, Weld Mesh, Water Tank 500 Ltr, Installation, RO
REfer to nomenclature
Restoration of road damaged by Jal Shakti Department due to the work Improvement of water supply by way of replacing worn out pipes from New plot station to meat shop, new plot station to state motor garages, Guest house OHT line, New Plot to Shiv
CO SOs Room 04 Nos CB, 02 Nos 2 MB Sentry Post, SDS, Underground water storage Sump with water supply distribution lines and supply and Installation of RO Plant including Base etc at BOP Chinaz of 192 Bn Now 42 Bn BSF under SHQ BSF Jammu
Construction of 3 No 20000 Gln GSR/Sump Tank, Construction of 2 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR, 1 Nos Pump Room, 01 No. Spring cover, 01 No. Compound wall, 01 No. protection work Laying and Fitting Rising Main and Distribution sy
Construction of 2 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR,02 No. Collection Tank , 04 Spring cover, 01 No. protection work, 3 Nos Pump Room, 03 Nos. Compound wall, Laying and Fitting Rising Ma
Construction of 2 No 20000 Gln GSR/Sump Tank, Construction of 10 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR, 03 Nos Pump Room, 11 Nos. Collection Tank, 11 Nos. Spring cover, 01 No. Compound wall , Laying and Fitting Rising Main and Distribut
Const. of 1 No 20000 glns SGR/sump tank Construction of 2 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR ,2 Nos Pump Room, 2 Nos. collection tank , 01 No. Fencing, Laying and Fitting Rising Main and Distribution system under WSS Kalal Kass-B (
Construction of 3 No 20000 Gln GSR/Sump Tank, Construction of 3 No 10000 Gln GSR, 05 No. collection Tank , 06 No. Spring cover , 3 Nos Pump Room, 02 Nos. Compound wall, 01 No. Fencing and sign board, 01 No. protection work Laying and Fitting Rising M
Construction of 4 No 10000 Gln GSR/Sump Tank, Construction of 1 No 5000 Gln GSR, Construction of 3 Nos Pump Room, 1 No. Protection Work, 3 no spring covers, 3 No Compound wall, Laying and Fitting of Rising Main and Distribution system(30 G.I pipe an
Construction of 6 No 20000 Gln GSR Sump Tank, Construction of 1 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR, 4 Nos Pump Room, 05 Nos spring covers, fencing and sign board, Laying and Fitting of Rising Main and Distribution system under WSS L
Construction of 2 No 20000 Gln GSR/Sump Tank, Construction of 1 No 10000 Gln GSR, Construction of 1 No 5000 Gln GSR, 1 No Pump Room, 07 Nos spring covers, fencing and sign board, Laying and Fitting of Rising Main and Distribution system under WSS Ta
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 2 No 10000 Gln GSR, Construction of 3 No 5000 Gln GSR, 1 No Pump Room, 09 Nos spring covers, fencing and sign board, Laying and Fitting of Rising Main and Distribution system under WSS Ch
Construction of 9 No 2000, 1 No 4000 Gln and 1 No 1000 Gln Per Hour Capacity Slow Sand Filteration Plant, 3 No Pump Room, 3 No 10000 Glns Sump Tank, 1080mtr Boundary Wall and 60 No Crate under WSS Kampla, Chakjaralan, Hanjana Khanka, Garan Pain, Cha
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 2 No 10000 Gln GSR, Construction of 4 No 5000 Gln GSR ,2 Nos Pump Room, 08 Nos. collection tank , 10 Nos. spring cover ,01 No. Fencing, Laying and Fitting Rising Main and Distribution syst
Please refer BOQ
Please refer to BOQ
Please refer to Boq
Please refer to BOQ
Please refer to BOQ
Please refer to Boq
Please refer to BOQ
Please refer to BOQ
Please refer to BOQ
Please refer in BOQ
please refer to BOQ
Please refer to Boq
Please Refer BOQ