Loading…
Loading…
5,047 results • Best match
Revamping of existing 0.22 MGD SSFP WSS Chewa Pehlipora SSFP WSS Chesma Manasbal by way of replacement of filter media nd ren of sump cum pump house WSS Chesma Manasbal for upgradation nd retrofitting of various WSSs in Block Safapora under JJM
Providing and Fixing of 80mm dia GI Rising main from Spring to Sump and Pump house to SR, Construction of Chain Link fencing around various structures, Constt of protection works of springs near Pump house and Sar and outside sluice chamber of SR,
Providing, laying and joining by welding of 200mm ND MS Pipe from Stage 1st to PST and handling, laying and joining by welding of departmental prefabricated, Medium Class GI pipe Rising Mains from clear water sump to WSS Shri Harikaran Gund under JJM
Constt of 0.15 lac gallons RCC collection sump, pump house cum op. quarter, chemical room, chain link fencing, 25000 gallons capacity Service Reservoir..... ETC FOR WSS ENGG COLLEGE SAFAPORA MH 4202 (FOR FULL DESCR. REFER TO ENIT NO 12 OF 20-21
Construction of 01 No Sheep shed with Batten flrooing 01 No Medicine store and feed store Construction of 04 No Toilet blocks with chokidar Qtrs Incl constt Of septic tank constt Sump tank 24000 liters capacity Repair Renovation of 4 No sheep
Laying and fitting of 100 mm dia G.I supply main for Nesbal, Completion of addl clear water sump, connecting SR, replacing of elec. and mech. Components of plant Incld. Replacement of Ft. Media Sand, Ch fencing and land Developmen for WSS Nesbal
Shifting of PHE Utilities at Lok Bhawan Panjtirthi Jammu under Own Sources 2026-27 A Construction of 40000 Glns Sump Tank at Lok Bhawan, Panjtirthi Jammu B Construction of Pump Room at Governor House Panjtirthi Jammu C Shifting of pipe Network oth
DESIGN, CONSTT, SUCCESSFUL TESTING AND COMMISSIONING OF SUMP, PUMP HOUSE ..... INCLD PROVIDING, L AND F OF PIPES ETC FOR WSS URPASH NADERBAGH (FOR FULL DESCRIPTION REFER TO FRESH E NIT NO 24 OF 2020-21 (S NO 1) (ON TURNKEY UNDER JKIDFC)
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 1 No 10000 Gln GSR, Const. of 02 Nos. 5000 Glns, 2 Nos Pump Room, 02 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Lower Dhangri (JJM).
Construction of 20,000 glns Sump Tank GSRs 03 Nos.,5000 glns SR 01 No.,2000 glns cap. Collection Tank 01 No., Spring cover 03 Nos., 03 No.Fencing and sign board of structures stations laying and fitting of distribution net work under WSS Samote
Construction of 04 Nos. (Four Nos.) 4000 glns per hour capacity Slow Sand Filteration Plant, 04 Nos. 20000 Glns Sump Tank, 01 No. Pump Room and 03 Nos. compound wall at WSS Loorkote, WSS Dhanwan , WSS Chingus and WSS Mubarakhpura (Under JJM)
Construction of 4 No 20000 Gln GSR/Sump Tank, Construction of 2 No 10000 Gln GSR, 01 No. spring cover , 2 Nos Pump Room, 02 Nos. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Behrote Kashmiri Mohalla (JJM).
Construction of 2 No 10000 Gln GSR ,Construction of 6 No 5000 Gln GSR/Sump Tank, 04 No. spring cover , 01 No. Pump Room ,01 No. Fencing, 04 Nos. Collection Tank, Laying and Fitting Rising Main and Distribution system under WSS Hubbi (JJM).
Construction of 04 Nos. Pump Room Building, 08 Nos. 10000 Glns GSR/ Sump Tank, 02 Nos. Cleaning of Dug wells, 01 No. Improvement of Pump room building, 02 Nos. Boundary wall and pipe laying and allied works under WSS Pacholi under JJM
L/F of pipes, Const of HW, Const of 0.34 lac gallons Capacity SSFP, Const of 0.17 lac gallons Capacity SR ,Const of 0.18 lac gallons Capacity Sump, Const of 02 no sluice chamber, chain link fencing ,Const. of Protection workAdhall Check Gohan
Balance work of WSS Neejbal Markundal by way of construction of 0.70 lac gallons capacity Over Head tank, construction of Clear water Sump Cum Pump House stage 2nd and construction of Pre settling Tank and P/L of left out risingmain.(under NABARD)
Construction of 1 No 20000 Gln GSR/Sump Tank, Construction of 4 No 10000 Gln GSR, Construction of 2 No 5000 Gln GSR , 5 Nos Pump Room, 05 No. Compound wall, Laying and Fitting Rising Main and Distribution system under WSS Margan (JJM).
C/o 240 Men Barrack 03 Nos. at GC CRPF Lethpora Now RTC SNR JandK. SH. Providing consultancy for complete structural design and drawing for 240 Men barrack 03 Nos. Underground sump and retaining wall at GC CRPF campus Now RTC SNR JandK.
Handling, laying and joining by welding of departmental GI prefabricated 150mm diameter Medium Class GI Rising Mains
Please refer BOQ
boq
Please refer to BOQ
Please refer to Boq
Please read Boq
Please Refer BOQ
Please refer BOQ
Please to BOQ
Please refer to Boq
PLEASE REFER NIT
Please refer to BOQ
Please Refer BOQ
Please refer to BOQ
Please refer to BOQ
Please read BOQ
Please refer BOQ
as per nit
AS PER NIT
As per NIT
AS PER NIT
PLEASE REFER BOQ
refer to BOQ
352 Dia Clutch disc assy, Injector, Assy Aux water tank, Rear Brake Chamber assy, Stud Bolt
DISC CLUTCH PLATE, COVER ASSY PLATE, ZF STRG VANE PUMP, AUX WATER TANK, PUMP WATER COOLENT
WATER COOLER 80 LITERS (Q3), WATER FILTER (Q3), WATER TANK 1000 LITERS, 7 LAYER PVC (Q3)
Solar Dryer Machine, Butter Paper, Cutting Machine, Slicing Machine, Water Tank Plastic, Plastic Basket, Polythene Cover
Goods Transport Service – Per Trip based Service - Packed Water, Open Water; Water Tank Truck; Medium Tanker
Please refer BoQ