TRANSPORTATION OF PONTOON, ASSEMBLING and INSTALLATION OF 3000 GPM PUMP 2 NOS AT WEST SUMP OF AKWMC OCP UNDER KATRAS AREA
DISMANTLING AND ERECTION OF 6.6 KV SECONDARY FEEDER FOR 3000 GPM PUMP AT WEST SUMP AMPL OF AKWMC UNDER KATRAS AREA
INSTALLATION OF NEW 6INCH AND DELIVERY RANGE FROM KUMARI JORE TO WEST SUMP OF AKWMC OCP - 1.5 KM UNDER KATRAS AREA
DISMANTLING AND TRANSPORTATION OF 6INCH AND 10INCH DIA DELIVERY PIPE OF EAST SUMP FOR OB DUMPING AKWMC OCP UNDER KATRAS AREA
Repairing and fabrication of rim assly. Engine sump guard and cleaning of radiator and transmission oil cooler of Dumper D- 10340
DAMAGED AND LEAKAGE REPAIRING WORK 6 INCH C.I PIPELINE AT 14 PLACES TETULMARI MAIN ROAD TO MT HOSTEL SUMP KATRAS AREA.
Re organisation of 8 inch dia pipelines for shifting of 2000GPM pump at main Sump w.r.t. konar exp. OCP, BnK Area
Dismantling of existing pipe ranges from 9no. Sump to banaglatta stand and erection through a new route at AADOCM , Dhori Area
Repairing and reconditioning of 02 nos. 3.3KV,DOL Starter installed at Main and face sump of Topa OCP under Kuju Area.
DISMANTLING OF 10 INCH AND 6 INCH IDLE DELIVERY OF WEST SUMP INCLUDING MANUAL TRANSPORTATION AND SACKING AKWMC UNDER KATRAS AREA
Repairing and reconditioning of 03 nos 3.3KV DOL Starter installed at Main and face sump of Topa OCP under Kuju Area.
Laying of 6inch dia. GI pipeline of two range for dewatering of main sump at Tapin South OCP under Hazaribagh area
Diversion of 55 No 4 inch MS Pipe line between Camp and Bhedakata Sump to Adjacent New Site of Bastacolla Colliery.
The work for diversion of existing pipeline for installation to new place at Quarry 2 sump under Ashok OCP,PPR Area.
Diverting/extending of 8 inch/10 inch dia MS pipeline for range(2) from Deco main sump to Deco coal face
Repairing of 8 dia MS pipe line of fourth range at sump no. 03 at Jehlitand under KDH OCP, NK Area.
Cutting of kutcha channel and sump for intake point of Damodar pump house under Jarangdih Colliery (For a period two year)
Rearrangement in power supply line of Pumps, Tower light installed near mine sump site of Tapin North OCP under Hazaribagh Area
Work of cleaning of underground sump and drains at 17L/7MD And 34L/24D in lower bachra seam at Churi project.
Laying of pipelines at Mines sump for shifting of pump at new location for dewatering purposes at JOCP under Hazaribag Area.
Construction of Guard wall along old WBM road at top edge of sump near Basdiha site L-80 M under ROCP.
Erection of 10 span 440V lighting OH line along upcoming pipe ramp of main sump of Quarry-2 under Ashok OCP
10inch3000 GPM NEW DELIVERY FROM WEST SUMP TO AMPL HAUL ROAD (KUMARI JORE SITE) 885 MTR. AKWMC OCP UNDER KATRAS AREA
Shifting of all pumps in 6 no sump and along with laying of one 6 inch pipeline AADOCM under Dhori Area.
Dismantling repairing and refitting of single stage sump pump of Loading section at Madhuban Coal Washery under Block-II Area, BCCL.
Laying 100m, 8 inch dia pipeline for proving delivery pipeline of pump installed at BKB sump, PPR patch under Ashok OCP.
DISMANTLING AND ERECTION OF 3.3 KV SECONDARY FEEDER FOR 2000 GPM PUMP ATG WEST SUMP OF AKWMC OCP UNDER KATRAS AREA
Extension and erection of 3.3KV overhead line at main sump for dewatering purpose by pumping at Topa Project under Kuju Area.
Repair Cleaning of OH Reservoir UG Sump and other Water Storage tank Sedimentation Tank etc at Ramgarh Cantt under GE Ramgarh
Repairing and rewinding of 1 no motor 20HP, 440V, Sl.No.Mud/M/1 make-Kirloskar of sump in Maheshpur SILO, Barora Area.
Provision of a Masonary Rest Shelter at Main Sump of Govindpur Ph-II OCP, Under Sawang - Govindpur Ph-II, Kathara Area.
Construction of 1 no. STP of capacity 200 KLD including underground sump and sewer line at 106 Bn, RAF, Sundernagar, Jamshedpur.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Sarkari Kali Manda.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post Near Shitalpur Bajrangbali Mandir
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Azad Nagar Hospital .
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post Near Sirsiya Harijan Tola .
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post at Harsinghraidih Turiya Tola.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Fagu Marik House.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post at Argaghat Sharm Kalayan .
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Pahaddih Bhoot Bangla.
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post Near Shiv Shakti Ghat
Construction of Deep Boring with OHT(Over Head Tank), Laying of Pipe Line and Stand Post near Samudra Yadav house.
Shifting of 2 nos of 4000gpm HT pump motor set of 3rd patch sump 3times as and when required for extraction of floor and side coal of the sump and shifting of 2nos of 4000gpm pump motor set of MOCP jharna face due to safe operation pumping dewatering
Assembling and installation of 2000 GPM turbine pump at SOCP coal face sump and shifting of 2 nos of 4000 GPM pump of MOCP and SOCP sump and replacing of BD 2000GPM pump motor set with 4000GPM pump motor set of SOCP and MOCP pumping face and other mi
Work dismantling of pipe line along Nalla sump, patch A and re-location/re-laying of pipeline to clear the area for production in a day to come at Nalla sump near pit office and provision of tanker filling points with pumps at Quarry 2 under Ashok OC
Replacing of B/D 1000GpM pump motor set on pontoon with a 3000GPM pump motor set in main patch sump and diversion of its pipeline due to shifting the pontoon along with the 3000GPM pump motor set to the other side of the main patch sump under AMPC.
(A)Lowering of 02 Nos. 4000GPM pump motor set of Jarlahi sump (B)lowering of 02 Nos. pontoon along with their HT pump motor set of main patch sump due to decrease of water level (C)Other misc. jobs related to pumping and pipe line work under AMPC.
(1) Fabrication and fitting of Tanker filling point (2) Shifting of 4000 GPM and 2000 GPM pump Motor (3) Shifting of Box pontoon (4) fabrication bend nipple taper (5) Extension of 10/8in dia pipe line at 1T coal Face sump to Box cut-III sump of ABOCP
Installation of one 4000gpm 2nd pump motor set on the ground level of 3rd patch sump and erection of 2nd range of 8inch dia MS pipe line from the sump to the top bench of 3rd patch and jointing its delivery with the existing delivery range of Barora
A)Lowering/shifting of 4000GPM and 3000GPM pump motor set of ground level of Jarlahi sump due to dec/inc of water level of the sump(B)Dism of 10 and 8 inch MS pipes from idle delivery range of main patch and transporting the pipes to SOCP,AMPC.