Loading…
Loading…
12,084 results • Best match
Construction of GLR at 7th ward Nedimund (15th SFC 25-26 1st Ins)
Providing New Borewell , Pumpset and Construction of GLR at Thiruvannakovilpatti in Ennai Panchayat.
Providing New Borewell , Pumpset and Construction of GLR at Theethanpannai in Rapoosal Panchayat.
Providing New Borewell , Pumpset and Construction of GLR at Kallupatti IN Erunthirapatti Pt.
Construction of GLR With Borewell in New Colony at Mangulam Village and Panchayat
Construction of 30,000 Litre GLR Tank at 5th Ward at Thiruvengadam Town Panchayat.
Providing New Borewell , Pumpset and Construction of GLR at Kattaiyakonpatti in Vilathupatti Panchayat.
Construction of GLR at Mela Street in Vagaikulam Panchayat in Ambasamudram Panchayat Union
(i) Construction of indoor stadium for table tennis, volley ball, GYM center, etc., with Electrical works at 5th Battalion/RPSF/KG/TPJ and (ii) Construction of Running Room of 10 beds capacity on the First floor and Ground level reservoir with bore well with Electrical works at Nagore station.
REPAIRS TO INTERNAL WATER SUPPLY, SANITARY FITTINGS, CLEANING /REPLACEMENT OF OVERHEAD TANKS AND ALLIED SERVICES IN TECHNICAL AREA AND DOMESTIC CAMPS INCLUDING PREVENTIVE MAINTENANCE OF E/M INSTALLATIONS UNDER GE AVADI.
001 Kulasekarapatti Panchayat Perumbanioor Sump
VERTICAL CENTRIFUGAL SUMP PUMP+ MOTOR
SUMP PUMP AND MOTOR ASSY
NCTPSISEMII Circle AHP DnUnit II OH Works 202526 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank and ash slurry Sump etc in Ash Handling Pump House
NCTPSISEMII Circle AHP DnUnit III OH Works 202526 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank and ash slurry Sump etc in Ash Handling Pump House
Annual Maintanance of Generators at Gandhi park OHT,bharathi park OHT ,Subburayan nagar OHT,Irumbuliyur OHT,manimegalai street pump room , Villiyampakkam, Melachery Up stream,Down stream Ullavur,Palayaseevaram Municipal Office and Ambedhkar mandapam
Annual Maintanance of Generators at Gandhi park OHT,bharathi park OHT ,Subburayan nagar OHT,Irumbuliyur OHT,manimegalai street pump room , Villiyampakkam, Melachery Up stream,Down stream Ullavur,Palayaseevaram Municipal Office and Ambedhkar mandapam
Annual Maintanance of Generators at Gandhi park OHT,bharathi park OHT ,Subburayan nagar OHT,Irumbuliyur OHT,manimegalai street pump room , Villiyampakkam, Melachery Up stream,Down stream Ullavur,Palayaseevaram Municipal Office and Ambedhkar mandapam
Construction of shet at OHT campus
Maintanance and painting of Mooventhar Nager Scheme OHT, Perumalpuram scheme OHT and Mission Compound Scheme OHT in Aralvoimozhi Town Panchayat.
Repairs to the 5000 Lit capacity GLR at Ward No 4 Oviyampalayam in Paramathi Town Panchayat
Cleaning of UG Sump and OHT in 713 HIG flats (13-Blocks-B2, B4, B6, B16, C1, C4, C6, C11, C12, Y1, Y2, Y3 and Z) at SAFGV scheme in Koyambedu,Chennai. Under AM for the year 2024-25
Providing Fencing to the OHT and Sump and Extension of Pipe Line at Wart No. 01, 04, 06, 07, 10, 12, 13 and 14 Area in Thondamuthur Town Panchayat
Extension of Pipeline at Karuppudayanpatty New AD OHT to Mini OHT in Karuppudayanpatty Panchayat
Providing CC Road Near Pachayat Office to OHT and South Street to Lakkur Road at Ma Puthur Panchayat
Construction of GLR at Ward No 3
Providing New Borewell , Pumpset and Construction of GLR at Pulvayal AD Theru in Pulvayal Pt.
Providing New Borewell , Pumpset and Construction of GLR at Veerapatti Asari Theru in Veerapatti Pt.
Providing New Borewell , Pumpset and Construction of GLR at Keelapulavanpatty Poosari Theru in Kothirapatti Pt.
Supply, Delivery, Erection, Testing, and commissioning of Spot Chlorination Arrangement at Bethelhem OHT , Samiyar Madam OHT and V.A. Kareem Road OHT in Ambur Municipality
Replacement of OHT Tank Pumping Line and delivery line for Water Supply arrangement Works at N Patchagoundanvalasu OHT and Karattupalayam OHT in Vellakovil Municipality
RENOVATION OF OHT VADUGAPATTU PACK
Construction of 30000 litre OHT in Irular Pagudhi at Periyavelikkadu panchayat at Lathur Panchayat Union. Estimate.18.42 Lakhs.SURPLUS/2025/26
Providing Extension of pipe line from Meenachipuram TWAD sump to Mudivaithanendal Tharmakineru Sump in Mudivaithanendal Panchayat
15th Finance Tied Grant Ist Installment - 2025-2026 - Construction of GLR at Kottatty.
Maintenance of OHT 300000 Litre Capacity at Ward No12 Nerhu Nagar OHT Ward No 09 Arriyappamapalayam OHT in Arriyappampalayam Town Panchayat
Construction of new Overhead tank with capacity of 60,000 litre (7.5m stage) in Pathiripuram habitation at Virupatchipuram panchayat at Valangaiman Block in Thiruvarur District.
Salem District - Kadayampatti Block - Construction of a 20,000 liter capacity (7.5m-staging) Overhead Tank at Kannapady Area H/O Kanavaipudur Panchayat - MLACDS -2025-2026
Nagercoil Corporation Providing Cement Concrete road at LI Street (150023S608),Water Tank 3rd Cross (150023R459) in Ward no.23,Konam Road 3 (150033R644),Konam Road (150033R645) in Ward no.33,Thattanvillai Cross Road (150034R700),OHT opp street (15003
Construction of new brick work water tank at Thittakudi Municipality
Water Bodies rejuvenation at Summer Storage Water Tank Puliyamarathu Shed
Modified catch holder for water tank of X class locomotives
water truck cabin truck with water tank (Q1) ( PAC Only )
Reconstruction of ICDS Centre at Srinivasan Water Tank Rettipettai (33604020214)
Modified catch holder for water tank of X class locomotives
NCTPSISEMII Circle AHP Dn Unit I OH Works 2025 26 Overhauling of various sizes of valves cleaning checking and rubber lining the ash water lines cleaning of ash water tank ash slurry sump etc in Ash Handling Pump House
Construction of 30000 Lr OHT At Poyyamani
Operation and maintenance of water supply pumps and filling of water to overhead tanks of residential and Non Residential buildings at Camp 1 Thermal Nagar for the period from 01.04.2024 to 31.03.2025
Portable Pneumatic Sump Pump 1000 L/Min, Portable Pneumatic Sump Pump 700 L/Min
TTPS Operation Circle CAD Dismantling, fabrication and renewal of worn out 300 NB M.S Seamless pipe and providing cement pedestal from Clarified water pump house II, GLR III Service water pump discharge header to OHT II for a length of 100 mtrs, Reac