Loading…
Loading…
2,962 results • Best match
Laying of CC Road from Municipal Office Entrance Gate to Sump in Municipal Office in Vemulawada Municipality under available SFC Grants in Vemulawada Municipality
Laying of CC Road from water sump to Shivanarayanapuram X Road in Division No.22 in Badangpet Municipal Corporation under General funds 2020-21
Laying of Storm Water Drainage pipe line from Rajiv Gruha Kalpa Sump to Bhoodan Colony Musi Nala Out let at Kuntloor Under General Fund.
Construction of Compound wall, and Raising of Compound wall, water sump and Major & Minor Repairs to KGBV Hajipur (M) in Mancherial District under DMFT
Laying of New HDPE pipe line of 63mm dia from B Hostel Junction to University College of Science Botany Sump on the O.U. Campus.
Laying of 200mm dia water supply lpipeline from LIG 08 Sump at Taneesha Nagar under Manikonda section, sub Division-I, O&M Division 18
Construction of RCC Sump for removal of water stagnation at PVNR pillar -264 , Shivrampally in ward -60 in Rajendra Nagar Circle-11,CRZ,GHMC
Construction of sump for removal of water stagnation at Karol Bagh-A under Gudimalkapur-71 Cir-12 Kz GHMC (Item No.1) 1st RECALL
Construction of 100kl sump at Nagarjunapet in Nalgonda district with an estimate cost of Rs:16 lakhs under O and M Grant 2023-24
Providing Interlocking paverblock flooring and sump at H.No:16-11-469/47 Church at Laxminagar Colony in Moosarambagh, Div-25, GHMC. Rs. 3.80 Lakhs
Providing HDPE pipe line (main line) inplace of damaged portion from Water Storage sump behind Mechanical Engineering Building to Ganga Hostel on the O.U.Campus.
Providing repairs and maintenance to pump room of 1.0 lakh Ltr. capacity drinking water sump at Mechanical Engineering Department, UCE, on the O.U. Campus.
Laying of Potable water pipe line from Water sump to Yamnampet Weaker section colony at Ward No.3 in Pocharam Municipality under general fund
Upgradation of existing 6 Bedded Hospital in to 30 Bedded Hospital at Ameerpet, Hyderabad. Sub Work: Construction of Compound Wall and 50 KL Sump
Construction of 800KL RCC Sump and ELSR at Bachupally Layout in Sy.No.39 and 40 at Bachupally(V) and (M) in Medchal Malkajgiri District
CONSTRUCTION OF GROUND LEVEL STORAGE SUMP AT KPHB PHASE-V PARK-1 IN WARD NO. 114, KPHB COLONY GHMC, MEDCHAL MALKAJGIRI DISTRICT (MPLADs FUNDS)
MECHANICAL CLEANING AND STERILIZATION OF OVERHEAD RESERVOIR AND UNDERGROUND SUMP INCLUDING REPAIRING OF SEEPAGES UNDER AGE E/M NO 1 OF GE (U) SECUNDERABAD
MECHANICAL CLEANING AND STERILIZATION OF OVERHEAD RESERVOIR AND UNDERGROUND SUMP INCLUDING REPAIRING OF SEEPAGES UNDER AGE E/M NO-II OF GE (UTILITY) SECUNDERABAD
REPAIR/REPLACEMENT TO PVC WATER TANK SOIL AND WASTE PIPE ALONG WITH CONNECTED ITEM IN JCOS ORS MD ACCN (MAP LINE) UNDER AGE B/R (S) NO I OF GE (S) SECUNDERABAD
Construction of CC Drain from H.No:2-5-88/A to H.No:2-5-174 via Mini Water tank in ward no:23 in Bodhan Municipality under 14th FC 2017-18 Grants
Construction of CD work at Vootavagu on R/f R and B road to Water Tank at M V Palem (V and GP) in Khammam Rural Mandal, Est. Cost Rs.10.00 Lakhs
Construction of Dwakra bhavan at Beside Thondupally High School and Near Kishnaguda Water Tank and Construction of Dhobi Ghat at Kishanguda in Ward No. 11 in Shamshabad Municipality Under HMDA Funds (Recall).
Laying of SWG pipe line from sukruthi homes main road to Block No.69/B and at Water Tank in Ward-17 in Dundigal Municipality Under MGF 2023-24(RESERVED FOR SC)
Filling of pot holes with gravel and stone dust and arrangement of Barricading, sand bags at Manakondoor new point mission bhageeratha water tank near on occasion of Bathukamma festivel 2024 of MCK
Filling of pot holes with gravel and stone dust and arrangement of Barricading , sand bags at Manakondoor new point mission bhageeratha water tank near on occasion of Bathukamma festivel 2023 of MCK
Construction of water tank (40KL) at SC Colony in Mominpet Village Mominpet Mandal in Vikarabad District (Reserved for SC contractors vide GO Ms No 59, Dt: 21.05.2018 of I&CAD Reforms dept
Construction of Mini Water Tank Near H. No. 6-23-162 (h/O nd Hafees) and at Nalla Pochamma Temple in Div No 40 of Zone I Area in Nizamabad Municipal Corporation
Laying of CC Road from water tank to Andey Kumar House and Gunta Bhikhapathi House to P.Anjanailu House in Ward.No.16 of Kompally Municipality under Municipal General Funds 2021-22.(SC RESERVED)
Driling of 61/2" dia Power Borewell, Supply, delivery, fixing of Submersible pump set, water Tank and other allied at GHMC laxmi Narsimha Community Hall, Chaitanyapuri Dilsukhagar, Hyderabad under CDP 2023-24
Laying of CC Road from sanju bakery to plot No.36, mini water tank towards existing CC Road shaheen nagar Allipur of Zaheerabad Municipality, Sangareddy District under MGF/PP/Any other Grants.
Laying of CC Road from H.No 16-9-439 Nawaz Communications to H.No:16-9-594 Mallikarjun Temple,Water tank road, Old Malakpet, Divi-26, Circle-6, CRZ, GHMC.(Rs 21.00 Lakhs)
Providing civic amenities like SS Flooring, Tin Shed, wall construction and supply of water tank at Galipochamma Temple, Dariyabagh, in view of Bonalu Festival under Jiyaguda-138, Karwan Circle-31, GZ, GHMC.
Set of Hardware items for fixing of Underslung Water Tank Suspension Arrangement (in ICF make Conventional AC Coaches). 1) Hex. Hd. Screw M16x60 confirming to Specification No. IS: 1364-2002 (Pt.2) &
Set of Hardware items for fixing of Underslung Water Tank Suspension Arrangement (in ICF make Conventional AC Coaches). 1) Hex. Hd. Screw M16x60 confirming to Specification No. IS: 1364-2002 (Pt.2) &
Periodical Cleaning of OHT and UGT, Oxidation ponds and OHTs of Residential and Public buildings at HWPM Colony for the year 2023-24.
AMC for Cutting of Tree Branches touching and Obstructing OHT lines at Area Workshop, RG.1 area for a period of Three years
OUT SOURCING OF OHT LINES AND RELATED ELECTRICAL WORKS FOR PROVIDING AC CONNECTIONS TO RESIDENTIAL QUARTERS ON RATE CONTRACT BASIS AT MANDAMARRI AREA.
Laying of 3.3KV, 440V/550V & 230V OHT Power lines in the mine along road ways, maintenance of electrical equipment at Naini coal mine
Out Sourcing of Laying of LT OHT line on rate contract basis at Khairagura OCP, BPA Area for a period of 2 years.
Laying of 3.3KV OHT Lines from proposed indoor substation to OBR contractor substation at KTK OC-III, Bhupalpalli Area on Rate Contract Basis
Laying of CC Road from Water Sump to Existing Z.P. Road at Balaji Nagar colony ward No.1 in Existing CC Road to Kaman at Seetha Medows colony ward No.5 and Kondal Reddy House to House No. 14-163/A at Sai Nagar colony, water tank to laxman House a Balaji Nagar colony ward No. 17 and Sappidi's House to Existing Rajeev Gruhakalpa Road at S.S. Reddy nagar colony ward No. 7 in Badangpet Nagarpanchayat under General funds 2017-18.
Development of basic infrastructure for housing area including SWD Water Supply System Sewage Network System along with Sewage Treatment Plant at Kakatiya Mega Textile Park Shayampet(V) Geesugonda(M) Warangal District. Sub work Providing Water Supply ... UG sump and ... KLD OHT 50 ...
Cleaning of 18.00ML GLSR,Sahebnagar Through T clean process by using latest German state of art technology with High pressure Rotary Jet cleaning and usage of the most effective Anti-bacterial agents under Sahebnagar Section,SD-II, O and M Divn-X
Cleaning of 18.00ML GLSR(old),Sahebnagar Through T clean process by using latest German state of art technology with High pressure Rotary Jet cleaning and usage of the most effective Anti-bacterial agents under Sahebnagar Section,SD-II, O and M Divn-X
Laying of CC platform, water harvesting pit at tankers filling point and construction of compound wall to damaged portion beside Mee-seva sulab complex and laying of impervious coat, repairs, painting to existing building at nakkalagutta GLSR premises in div no.48, GWMC
Restoration of road cutting for the proposed laying of 900/750mm DIA MS and 400mm dia outlet arrangements of 10 ML GLSR at Borabanda under moosapet section, (From Vijetha Talkies to NRR Puram-II, HMWS & SB office via Vasavi Kanyaka Parameshwarai temple) (Recall)
Cleaning of 22.00ML GLSR, Sahebnagar Through T clean process by using latest German state of art technology with High pressure Rotary Jet cleaning and usage of the most effective Anti-bacterial agents under Sahebnagar Section, SD-II, O and M Divn-X
Removal of accumulated silt/sand from fore bay and sump of intake pump house from EL +40.50m to El + 58.50m for the year 2024-25
Laying of HDPE Pipe Line from Main Road to Indrareddy Colony Sump (JNNURM houses) in Ward No.14 of Shamshabad Municipality under SFC (SCSP) Grants.
Arrangements for temporary sump for immersion of Bathukammas on the eve of Bathukamma Festival-2019 in Ward Nos. 125,126,128 & 129 of Gajularamaram Circle-26, GHMC