Loading…
Loading…
1,826 results • Best match
Motor Insurance Service - Tata School Bus 41 Seater with driver and Cleaner; Above 2500 CC
Motor Insurance Service - Tata Mini School Bus 27 seater with driver; 1501 to 2500 CC
Motor Insurance Service - Tata School Bus 41 seater with driver and Cleaner; Above 2500 CC
Motor Insurance Service - Mini School Bus 27 seater with Driver and cleaner; Above 2500 CC
Motor Insurance Service - Tata School Bus 41 seater with driver and cleaner; Above 2500 CC
supply of 33 Kv 800 Amps Line Isolator and 33 Kv 800 Amps Bus Isolator
Supply of 33 KV 800 Amp. Bus Isolator and 33 KV 800 Amp. Line Isolator
Motor Insurance Service - Tata School Bus 41 seater with driver and conductor; Above 2500 CC
Supply of 36 KV Bus Isolator and Line Isolator (BI and LI) At Various Sub-Stations of ETC Banda
1.Sedan Maruti Swift Dzire or equivalent, 2.Sedan Maruti Swift Dzire or equivalent, 3.MUV Maruti Eartiga or equivalent MUV, 4.MUV Maruti Eartiga or equivalent MUV, 5.SUV Innova Crysta or equivalent SUV, 6.SUV Innova Crysta or equivalent SUV, 7.Bus 40 ... 8. Bus 40 ... 18. Bus 40 ... 19. Bus 40 ... 20. Bus 40
washing of buses at Pilibhit workshop
Providing the taxi (car/Jeep/Bus) on the basis of daily and Monthly rent at SVPUAT Meerut
Height Raising of LV Side Bus of 40 MVA T/F-III, 250 KVA Station T/F other works at 132 KV S/S Taj, Agra
As per NIT and Tender Document
Hiring of 04 nos. 52 seater buses for transportation of employees from Dudhichua Colony, Gorbi and Singrauli to Dudhichua mines and on 24 hours per day basis for 730 days with valid UP /MP permit.
Servicing/repairing (including replacement of Clutch Assy., Propeller Shaft Assy., all Filters changing, all wheels Hub Greasing with all point nipple greasing and suspension system) of School Buses (UP64 AT/6545, UP64AT6830, UP64T7212 and UP64T7213)
ERECTION OF 132 KV BUS COUPLER BAY AND INSTALLATION OF 02 NOS SECTION ISOLATOR ON 132 KV TRANSFER BUS AND REPLACEMENT OF 04 NO OLD DAMAGED 132 KV ISOLATOR AT 132 KV SS RAMPUR UNDER ETD RAMPUR
ADVERTISING RIGHTS FOR THE ADVERTISEMENT ON BUS SHELTERS PACKAGE I TRIVENIPURAM TO PURAMUFTI IN PRAYAGRAJ CITY
Civil Works for Construction of 33 KV Jack Bus at 132 KV S/s Nirpura, Baghpat
APOLLO 12.00-20 Truck, Bus and Trailer Tyres in Highway Service - Tube-Type Tyre (without Tube)
Attending Air Leakage of 145 KV SF-6 CB (CGL Make) of 132 KV Bus Coupler
Maintenance of Street light on road adjacent to Phool Mandi and bus dipot Sector 88 Noida
REPLACEMENT OF 132KV TRANSFER BUS-COUPLER PANEL AT 132KV S/S KAURIRAM, UNDER ETD-II, GORAKHPUR
Construction of Foundation for 33 KV Jack Bus at 132 KV Sub Station Ballia Distt Ballia
Supply of 36KV Bus Isolator/Line Isolator for various substations under transmission Zone South-East Prayagraj
STRINGING AND CONSTRUCTION OF 33 KV TRANSFER BUS AT 220 KV SUBSTATION ETAH UNDER ETD MAINPURI
Dismentaling of jack bus section RYB of moose conductor and lowering down of conductor from stn.gantry
Custom Bid for Services - 37 Seater Bus TCV from Leh to Prayagraj Lucknow Ayodhya and Kanpur
APOLLO 12.00-20 Truck, Bus and Trailer Tyres in Highway Service - Tube-Type Tyre (without Tube)
APOLLO 12.00-20 Truck, Bus and Trailer Tyres in Highway Service - Tube-Type Tyre (without Tube)
construction of CC work in ward No 14 Rogangran from Bulandshahr Bus Adda to Pathwari Ahsram
PROVIDING STAFF SHIFT BUS FOR IOCL STAFF AND OFFICERS DEPLOYED IN SHIFT DUTIES AT FARRUKHABAD BP
WARD NO 05 CVN MARG DEENPURWA DEVA HOSPITAL SE BUS STAP CHAURAHA TAK LIGHTING KA KARY.
Vikas Khand Balha Gram Panchayat Nanpara Dehati ke Nanpara Bus Adde par yatri shed nirman karya_02
Civil works for construction of 33 KV Jack Bus at 132 KV S/s Baghpat, Baghpat
Improvement of road From N.H.A.I To Bus Charging Station Gram Ahirwa ward-31 under zone 2.
Civil Work for Construction of Tendom and Bus Isolator foundation at 132 KV S/s Sambhal
FOR LOADING, UNLOADING, DISMANTLING AND ERECTION OF 132KV MAIN BUS-I PT AT 220KV SUBSTATION AZAMGARH
33 KV Bus Extention for new Mittal Ceramics industrial Bay at 220 kv s/s tundla
FOR SUPPLY OF 33 Kv 800 Amps Line Isolator and 33 Kv 800 Amps Bus Isolator
GVP point interlocking work from juhi parampurwa sai purwa bus stan Under Ward-16 Zone-5
BUS TYPE WINDOW GLASS FOR EMU AS PER EMU DRG.NO. M2/SK-136/2008,Alt. C
BUS TYPE WINDOW GLASS FOR EMU AS PER EMU DRG.NO. M2/SK-136/2008,Alt. C
APOLLO 12.00-20 Truck, Bus and Trailer Tyres in Highway Service - Tube-Type Tyre (without Tube)
APOLLO 12.00-20 Truck, Bus and Trailer Tyres in Highway Service - Tube-Type Tyre (without Tube)
WORK OF REPAIRING AND OVERHAULING OF 145 KV BUS/LINE /TANDEM ISOLATOR AT 132 KV SUB STATION KUNDARKI UNDER ETD-I, MORADABAD.
Overhauling of 6.6 kV Motors IP SP Bus-Ducts 6.6 kV switchgear and other Electrical Systems of Unit 09 DTPS HTPS Kasimpur
Dismantling, shifting and erection work of 220 kV Bus coupler bay at 400 kV S/S Agra under E400 kV S/S Division Agra
Sliding Glass Shutter for Bus type Windows (For LHB coaches) to Drg. No. C&W.LGD.SK No. 1070 COL I (LH) Qty. = 35 Nos. & Sliding Glass Shutter for Bus type Windows (For LHB coaches) to Drg. No. C&W.LG
EXTENSION OF 132 KV MAIN BUS FOR INTERCONNECTION OF 132 KV S/S NEEBKARORI TO 220 KV S/S NEEBKARORI AT 220 KV S/S NEEBKARORI UNDER E.T.D.-FATEHGARH