Loading…
Loading…
1,831 results • Best match
Motor Insurance Service - 4 Wheeler, Tractor, Tata Winger 14 seater, Tata School Bus 41 seater, Tata SFC 709 (Hydraulic skylift mounted on chassis); 1501 to 2500 CC, Above 2500 CC
Switchyard
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Nagar Panchayat Gopamau me Mohalla Lalpeer me ishak ke makan se hardoi bus adda tak; Electrical System or Installation; Service Provider
Routine maintenance of Transformers/Reactors/ Isolators/Bus Bars/Jumpers etc and replacement of damaged Jumpers, Servicing of DPPs/CR Panels etc. along with other associated at 400KV S/s Division, Sultanpur
OVERHAULING OF 220KV CIRCUIT BREAKER, PROVIDING AND FIXING OF 132KV CB MOTOR AND RATCHET WHEEL OF 132KV TRANSFER BUS CB IN THE SWITCHYARD AT 220KV S/S RASARA UNDER ETD-BALLIA
Centrifuging, circulation and filtration of the Transformer oil of BHEL make 125 MVAR 400KV Bus Reactor installed at 400KV S/S Kasara-Mau Under E. 400KV S/S Division Kasara-Mau
Hiring of 01 No. Bus (minimum capacity 18 seats) round the clock for one year for transportation of shift and maintenance staff working at HOPS under Executive Engineer HOPS Obra Sonebhadra.
TYRE FOR TATA 1512 BUS, TYRE FOR TATA SUMO AND SCORPIO 3, TYRE FOR MARUTI GYPSY, TYRE FOR ERITGA CAR, TYRE FOR SCORPIO S11, TYRE TUBE, FLAP, TARPOLIN FOR MARUTI GIPSY
Work of Testing of Transformer Oil of various 400/220KV ICTs, 220/132KV T/Fs, 132/33KV T/F and 400KV 125MVAR Bus Reactor installed at 400KV S/S Sarnath, Varanasi
Replacement of old and used circuit Breaker TELK make of Transformer Bay I and 220KV Bus Coupler Bay by New 245KV SF6 Circuit Breaker at 220KV Substation Budaun under ETD Budaun
Custom Bid for Services - Business Plan work 2026-27 (Supply materails and erection/Installation work) LT and 11KV augmentation line work, Augmentation DT, New DTR installation and related work Similar Category Electric Cabling Service Repair and ... Electrical Buses Repair, ...
Custom Bid for Services - Business Plan work 2026-27 (Supply materails and erection/Installation work) LT and 11KV augmentation line work, Augmentation DT, New DTR installation and related work Similar Category Electric Cabling Service Repair and ... Electrical Buses Repair, ...
Custom Bid for Services - Business Plan work 2026-27 (Supply materails and erection/Installation work) LT and 11KV augmentation line work, Augmentation DT, New DTR installation and related work Similar Category Electric Cabling Service Repair and ... Electrical Buses Repair, ...
Copper alloy Taps/Stop Valves (V2) Conforming to IS 8931 (Q3), Bathroom Water Shower (V2) (Q3), Rotational Moulded Polyethylene Water Storage Tanks (V2) conforming to IS 12701 (Q3), Door Handles as per IS 208 (Q4), Bathroom or Toilet Mirror (V2) ... for Bus Body Building ...
CARRIAGE OF LA, MOOSE CONDUCTOR, 70KN DISC, 36KV BUS and LINE ISOLATOR, 36KV CT, CONTROL CABLE AND M.S. FLAT FROM VARIOUS SUBSTATIONS TO 132KV S/s AALAPUR UNDER ELECTY. TRANS. DIVISION, AYODHYA.
Installation and Fixing of 11 KV Incoming and Outgoing VCBs and 11 KV Bus-Coupler Panel, overhauling of switchgear at 33/11 KV Sub-Station Chowk Under Electricity Distribution Division Ist, Ayodhya
Installation and Fixing of 11 KV Incoming and Outgoing VCBs and 11 KV Bus Coupler Panel, overhauling of switchgear at 33/11 KV Sub Station Deokali Under Electricity Distribution Division Ist, Ayodhya
Construction of 33 kV Transfer Bus, 33 kV CT reorientation related works, installation of 33 kV Isolators and other associated works at 132 kV S/S Sector-66 under ETD-II Noida
Frost Free Refrigerator, Split AC Inverter Type With Stabilizer, Display Cabinet, Bus AC Tutorial Model, Visi Cooler, Water Dispenser Bubble Type Hot And Cold, Work bench, Bench Vice, Drafting Table, MS Office
Work of Overhauling and attending SF-6 Gas Leakage from 245 KV Siemens make SF-6 Circuit Breaker for 220 KV Bus Coupler bay at Electricity 400 KV S/S Manth Mathura
Installation and Fixing of 11 KV Incoming and Outgoing VCBs and 11 KV Bus Coupler Panel, overhauling of switchgear at 33/11 KV Sub Station Mumtaj Nagar Under Electricity Distribution Division Ist, Ayodhya
Increasing Capacity work from 40 MVA to 63 MVA transformer and strengthening of 132/33 KV Bus alongwith installation of various equipment at 132 KV S/S Bodla Agra Under ETD- II Agra
Motor Insurance Service - Ambulance; 3455cc, Motor Insurance Service - Tata 410 Bus; 3783cc, Motor Insurance Service - Tractor; 42 hp, Motor Insurance Service - Tractor; 44 hp, Motor Insurance Service - Airfield Crash Fire Tender; 697 hp
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Installation of Additional 40MVA Transformer strengthening of 33KV Main Bus with Twin Moose Conductor at 132KV Substation Gosasinghpur under ETD Sultanpur; Substation, S..
Lunch and Snacks and Tea at Buyer Premises per persons, Hotel Stay and Dinner and Breakfast Per Persons, Led Wall and Sound System at auditorium, photography and videography recording, Writing Pad, Pen, Laptop Bag, Id card with lanyards, Banner Size ... Transportation buses for ...
Custom Bid for Services - Business Plan work 2026-27 (Supply materails and erection/Installation work) LT and 11KV augmentation line work, Augmentation DT, New DTR installation and related work under EDD Shikohabad Similar Category Electric Cabling ... Electrical Buses Repair, ...
Custom Bid for Services - Business Plan work 2026-27 (Supply materails and erection/Installation work) LT and 11KV augmentation line work, Augmentation DT, New DTR installation and related work under EDD Sirsaganj Similar Category Electric Cabling ... Electrical Buses Repair, ...
WORK OF TRANSFORMER FAN AUTOMATION OF 40 MVA, 132/33 KV TRANSFORMER NO. 2 AND REPAIRING AND OVERHAULING OF 145 KV BUS/LINE ISOLATOR AT 132 KV SUBSTATION AWAS VIKAS UNDER ETD-I, MORADABAD.
REPLACEMENT OF JOINTED/ DAMAGED, JUMPERS, DISMANTLING OF WAVE TRAPS INCLUDING ERECTION AND INSTALLATION OF 132 KV BUS POST INSULATORS ALONWITH AUXILIARY STRUCTURES IN 132 KV SWITCHYARD OF 220 KV SUB STATION, SAROJINI NAGAR, LUCKNOW
REPLACEMENT OF OLD AND DAMAGED MOOSE CONDUCTOR WITH NEW MOOSE CONDUCTOR OF 132 KV MAIN BUS - I AND II SECTION AND OTHER MISCELLANEOUS WORKS AT 132 KV S/S BHARUA SUMERPUR UNDER ETD HAMIRPUR
Replacement of Damaged 145 KV Circuit breaker of 160 MVA TF -I And repairing/overhauling of 220 KV Circuit Breaker of Bus Coupler Bay at 220 KV S/S Charla under ETD-II, Meerut.
132kV Allapur Feeder, 132kV Koilsa Feeder, Supply of C R Panel, Refitting of new relay, Rewiring in C and R Panel, Commisstion and testing of new relay, 132kV Transfer Bus cupler, Testing and commissioning
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 220 KV SubStation Sambhal under ETDSambhal; Substation, Power House Equipment, Electrical System or Installation, WORK FOR REPAIRING OVERHAULING OF 245 145 KV BUS AND ..
Switchyard works
Repairing and Overhauling of 11 KV Incoming/Outgoing panel/Bus Coupler/Brakers installed at various 33/11 KV Sub Stations, in the work area of EDD, BKT, Under the Jurisdiction of EUDC-PURANIA, LESA, Lucknow
CARRIAGE OF M.S. FLAT, 145KV BUS ISOLATOR, 145KV TENDEM ISOLATOR, BBL SUBSTATION STRUCTURE PARTS AND EKR and BBR SUBSTATION STRUCTURE PARTS FROM VARIOUS SUBSTATIONS TO 220KV S/s NEW TANDA UNDER ELECTY. TRANSMISSION DIVISION, AYODHYA.
Construction of one number 220 kV Bay including supply of hardware, clamp and connector, extension of 220 kV bus alongwith other associated works at 220 kV S/S Sector-129 Noida under ETD-I Noida
Construction of two number 220 kV Bays including supply of hardware, clamp and connector, extension of 220 kV bus alongwith other associated works at 220 kV S/S Sector-129 Noida under ETD-I Noida
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Switchyard, Overhauling of Jyoti make 11KV Vacuum Circuit Breakers and BUS of 11KV substation at switchyard A and B TPS Anpara; Service Provider
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - 132KV SUBSTATION GULABBARI AND 220KV SUBSTATION MORADABAD; Substation, REPLACEMENT OF EXISTING 132KV MAIN BUS MADE UP OF SINGLE ACSR MOOSE CONDUCTOR TO TWIN ZEBRA CONDUC..
AS PER PRICE BID
Repairing and Overhauling of 11 KV Incoming/Outgoing panel/Bus Coupler Brakers installed at 33 11 KV Sub Station Ahibaranpur Puraniya and Goel Chouraha in the work area of EUDD Daliganj LESA Trans Gomti I Lucknow
Maintenance of Electrically operated hoist, cable reeling drums and other associated equipment, laying termination and jointing etc. of power/control cables and maintenance of 6.6 KV vacuum circuit breakers their overhauling and cleaning of bus bars,
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Installation of additional 63MVA Transformer along with strengthening of 132KV Main Bus with Twin Moose Conductor at 132/33KV S/s Gauriganj (Amethi) under ETD-Sultanpur;..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment, Overhauling of various HT/LT transformers, IP/SP bus-ducts and associated electrical systems, 6600 KV Unit, station and ash handlin..
Paint enamel synthetic exterior finishing bus green ISC No. 299 as per IS: 5/07(Reviewed in 2018) to IS: 8662/2024 third revision with RDSO amndt. No. 1B(Rev. 2.0) as an additional requireme nt along with RDSO amndt. No. 1(Rev.0) for pigment content as an additional requirement to IS:8662/04. with additional requirement of ICF/MD/Spec. 045. Issue status 02, Rev. 03, packed in 20 Ltrs. new and sound non-returnable M.S. drum to IS:2552/1989 with amndt. 1 of April 1999, Grade B-1.
Paint enamel synthetic exterior finishing bus green ISC No. 299 as per IS: 5/07 (Reviewed in 2018) to IS: 8662/2024 third revision with RDSO amndt. No. 1B(Rev. 2.0) as an additional requirement along with RDSO amndt. No. 1(Rev.0) for pigment content as an additional requirement to IS:8662/04. with additional requirement of ICF/MD/Spec. 045. Issue status 02, Rev. 03, packed in 20 Ltrs. new and sound non-returnable M.S. drum to IS:2552/1989 with amndt. 1 of April 1999, Grade B-1.
Paint enamel synthetic exterior finishing bus green ISC No. 299 as per IS: 5/07(Reviewed in 2018) to IS: 8662/2024 third revision with RDSO amndt. No. 1B(Rev. 2.0) as an additional requireme nt along with RDSO amndt. No. 1(Rev.0) for pigment content as an additional requirement to IS:8662/04. with additional requirement of ICF/MD/Spec. 045. Issue status 02, Rev. 03, packed in 20 Ltrs. new and sound non-returnable M.S. drum to IS:2552/1989 with amndt. 1 of April 1999, Grade B-1.
Paint enamel synthetic exterior finishing bus green ISC No. 299 as per IS: 5/07(Reviewed in 2018) to IS: 8662/2024 third revision with RDSO amndt. No. 1B(Rev. 2.0) as an additional requireme nt along with RDSO amndt. No. 1(Rev.0) for pigment content as an additional requirement to IS:8662/04. with additional requirement of ICF/MD/Spec. 045. Issue status 02, Rev. 03, packed in 20 Ltrs. new and sound non-returnable M.S. drum to IS:2552/1989 with amndt. 1 of April 1999, Grade B-1.
Group A vehicles Etios Swift Swift Dzire or Equivalent as per km and hrs, Group B vehicles Innova Diesel AC as per km and hrs, Group C vehicles Scorpio Bolero Diesel or Equivalent as per km and hrs, Group D vehicles Ertiga Honda BRV Diesel or ... NonAC Bus as ... Traveller Bus as ...