Loading…
Loading…
3,919 results • Best match
INTERLOCKING WORKS TO LANES INSIDE TO SHANKARA NARAYANA TEMPLE IN DIVISION 20 OF KOLLAM CORPORATION-Project No 1421/26
Annual Plan-359/22-23-Neyyatinkara Municipality-Olathanni Ward-Melethazhankode Souhrida road tarring,kavitha road interlocking-General Civil Work
Annual Plan-PATTAMBI BLOCKPANCHAYAT 2023-24 S064/24 KOVILINGAL SC COLONY ROAD CONCRETING AND INTERLOCKING IN KULUKKALLUR GRAMA PANCHAYATH
SO. 455/23-24-Interlocking of Pozhiyoor Plangavila Police Station Road 2 nd Reach W-9 in Kulathoor GP
proj. No.922 Div.13 Sankar nagar road re tarring AND interlocking and Improvement of roads Near KSRTC stand
P R O J E C T N O . 1 6 1 - MUHAYUDHEEN JUMA MASJID ROAD INTERLOCKING SECOND PHASE
Provision of Interlocking arrangements including EOLB with SLB at EIGHT numbers of Non-interlocked LC gates in Thiruvananthapuram Division
Annual Plan 2024 25 VALANCHERY MUNICIPALITY INTERLOCKING POLICE STATION ROAD PHASE II in ward 8 Pro no 158 25
Annual Plan-MAMPAD GP 104/23-24 GMLP School meppadam muttam interlocking sheet meyal ward 16 General Civil Work
TVPM corporation 2021-22, Kallattumukku Study centre 3 by-lanes reconcreting interlocking in Ambalathara Ward Project No.419/22
PRO NO.709/23 DVN.35 ZAKKEER HUSSAIN ROAD INTERLOCKING YAKSHINADA PT NAGAR CHAKIRIKKADA FOOT PATH OTTATHIL DRAIN RENNOVATION
Project No.1088-23 INTERLOCKING CONCRETING AND EUROCONE WORKS AT KANJIPPURA CHIRAMUKKU KAMAL NAGAR RAINBOW LANE IN KALIPPANKULAM WARD
Pro. No. S1979/26, -Construction of front gate and interlocking in front of Krishnan smaraka Auditorium in Mannanthala ward
Annual Plan- NEMOM BP/08/2024-25/Muthiyampara Road -Concrete and Interlocking in Vilappil GP Cherukodu ward -Vilappilsala Division
Annual Plan-Dharmadam GP _ 129/2025-26-Renovation of Melur boat jetty road (interlocking from 00/028-00/0048)
Annual Plan-Pro no 97/2025-26 Iverkala sub center Compound wall gate maintanance and Interlocking in kunnathoor GP
653- INTERLOCKING AND RE CONCRETING IN PARAYATTIL TEMPLEROAD,VNRA A-LANE,TKD ROAD ,NETHAJI BOSS ROAD IN MUTTADA WARD
RKI SL NO 104 CONSTRUCTION OF DRAIN AND LAYING INTERLOCKING TILE AT PANDITJI ROAD IN WARD 3 OF KUMBALAM
Proj no 452 2021-22 SIDE CONCRETING INTERLOCKING AND CONSTRUCTION OF DRAIN IN OORUTTUKALA VALIYAKULAM ROAD in Ooruttukala ward
Project No. 1843/22. Construction of drainage and interlocking of Avittom Thirunal Road near Attukal Temple in Attukal Ward
TVPM Corporation 2020-21 P.NO-773,V.P.Thampi 1.2.3 lane concrete,interlocking ,Drain Slab,Perapoor drain slab in Pathirapally ward.
ONGALLUR-GP 2024-25 CONSTRUCTION OF Theeyyattil Muhammedali Padi to Mattummal Muhammedali Padi Road Interlocking w-13 S0402/25
PROJECT NO 922/21 Mathalakulam, Madathuvilakom and its near by lanes in Aksharaveedhi road interlocking work in Chackai ward.
Annual Plan-PATTAMBI BLOCK PANCHAYAT 2023-24 S037/24 VADAKKUMURI MANJAMBRA SATHARPADI ROAD INTERLOCKING CONCRETING IN MUTHUTHALA GRAMA PANCHAYATH
Pr. no. 280 Div 39 Eravipuram nagar Ellam NAgar Serva Nagar Chethana Nagat interlocking and rain water pit construction
Annual Plan-Thazhava GP Project No 231/2023-24-Chira renovation and interlocking near Panchayath office-General Civil Work
1686/22 Interlocking of Bappuji Nagar road and retarring of Yuvakerala junction to Azad Nagar road in Manikyavilakom ward.
KMC Division 10 Project No.14O9/2O25- THAVOOTT ROAD CONCRETING AND SIDE WALL CONSTRUCTION INTERLOCKING OF KALLUPURATH CHAAMAYIL ROAD
Pro No 171/24 Retender- Ring road interlocking in Division-24 of Tanur Municipality under Annual plan 2023-24
PRO NO. 1957 Ayyanthole zonalTHRISSUR CORPORATION AYYANTHOLE ZONAL DIVISION 45 DEVI KSHETHRAM ROAD AND BYLANE ROADS RETARRING AND INTERLOCKING
PRO NO-936/22-23-CONCRETING AND INTERLOCKING OF MAHARAJA GARDEN BYLANE AND VALIYAUDESWARAM PARASSERI LANE IN KADAKAMPALLI WARD
720/22-23 Reconstruction of damaged culvert , interlocking , eurocorn tiles in Chempaka Nagar and officers nagar in Vazhuthacaud ward
Annual Plan-New Mahe GP 2023-24 - Project No 60/24-Market road Foot path interlocking General Civil Work
Up gradation of coastal roads in Thiruvananthapuram District. -Improvements to Chamavila Pandaravila pathway interlocking in Karode Panchayath,Neyyattinkara LA
Tarring, Reconcreting, Relaying, interlocking, Eurocone laying in Vinayaka nagar, Sreebhadra Nagar (Saram), Annapoorneswari lane, Panayara lame in Sreevaraham Ward
993/22-23 THURUTHUMOOLA WARD SREEDEVI GARDANS RETARINGAND INTERLOCKING N V NAGAR METALLINGAND TARING RANNILANE SUB ROAD RE TARING
Proj no 692/24 Killipalam,chirapalam roads concreting ,retarring interlocking and drain maintenance in Nedumcaud ward -General Civil Work
Project No 352/2020-21 Santhy Nagar Vadakara Nagar Various Roads Re-Tarring Re-Concretting Interlocking in Thirumala Ward
Proj No 443 Div 6 Improvement of mamoottilkadavusekkular lanesekkular kayalvaram lanekudiyampally leftright laneparambil lanemankuzhi lanenear dhanya supermarket lane interlocking
Annual Plan-133/22-23-Anganwadi- Gate-Compound wall-Interlocking-Roofing sheet-Painting works-General Civil Work-Kavanur GP
Project No 433/2021-22 Jeevan Prakash Paloor Road Padmanabha Gardens Road Interlocking and Drain Construction in Pattom ward
RETENDER PW10/51740/19 Poject no 985/2019-20 VADAKKEVILA ZONAL Division 27 Vadakkevila Various lanes interlocking and concreting
Project No- 626/26 Division -9- Parakkundil Idavzhi Road Interlocking-MUNICIPALITY of Tanur Municipality under Annual plan 2025-26
MLASDF-2023-2024-INTERLOCKING AND PAVING OF TILE OF PUSHNAVALLY PEEDIKA-LEKSHAMVEEDU ROAD IN WARD-10 OF KUMARAPURAM GRAMAPANCHAYATH
Work Name SO268 2020 Paving interlocking tile drain and protection wall construction at Karipayi road byelane in ward 4
PRO NO. 832/21 TMC NE INTERLOCKING AND RAIN PIT CONSTRUCTION AT VILAYIL ROAD AND BYELANES IN KALADY WARD
Annual Plan-2024-25 V K Kadavu Anganwadi Road Interlocking in Thrithala GP- Proj No 146/25 Ward 4
Project 668 Interlocking of lane from Palliyanmoola Congress Office to Narendran house in Division 1,Pallikkunnu Zonal,Kannur Corporation
PATTAMBI MUNICIPALITY 2025 26 PR NO 183/26 ROAD INTERLOCKING FROM NOORJUMAH MASJID TO ONNAMKATTI ROAD IN DIV 19
2020-21 NELLANAD GP- CONSTRUCTION OF COMPOUND WALL AND FOOT PATH INTERLOCKING AT MYVALLIKKONAM ANGANVADY (project no.70/21)