Loading…
Loading…
1,129 results • Best match
Round the clock watch and ward of the ADM Plant and related machineries and also time to time Trial Run of ADM plant, Paver Finisher, Tripper and Excavetor, Tendom Vibratory Road Roller etc. inc preventive maintenance by servicing oiling, greasing
Mtc. of road from Chellagang - Barmatilla Chowmuni to Chellagang road (L-2.10km) and AN road (Dalak VC) to Paharpur road (L-1.00km) (Total Carpeting Length- 3.10km) during the year 2021-22 SH- Re-carpeting (with paver finisher), Sand Seal Coat and
1 Round the clock watch ward of the ADM Plant related machineries and also time to time Trial Run of ADM Plant Paver Finisher Excavator JCB cum Loader Tipper etc including preventive maintenance by servicing oiling greasing etc at Pathartilla Pan
Round the clock watch ward of the ADM Plant related machineries and also time to time Trial Run of ADM plant Paver Finisher etc inc preventive maintenance by servicing oiling greasing etc at Garadtilla under MSD Kumarghat during the year 202526
Round the clock watch and ward of the ADM Plant and related machineries and also time to time Trial Run of ADM plant, Paver Finisher, Triper and Backhoe, loader etc inc preventive maintenance by servicing oiling, greasing etc. at Pathartilla, Pa
Construction of Garage Near Children Park of Colony area dismantling of temporary garage and laying pavers block at garages near C-type Quarters at TGBPP NEEPCO Ltd Monarchak Sonamura
Works
Works
Construction
Imp. of road from Gamaibari panchayet office to Rupacherra GP (from ch. 0.00 to 0.50 km) along the canel side under Teliamura RD block during the year 2024-25 under the jurisdiction of Teliamura Sub-Division No.I/ SH- providing and laying paver bloc
Improvement of Amarpur RD Block Road from Gate no-1 to Gate no-2 (L-0.450 km) under Amarpur RD Block during the year 2025-26.SH- Widening, GSB,WBM-II, WBM-III, PMC(Paver machine) and road marking and furniture etc
Construction
Grouting, 25 mm carpeting using paver finisher and Seal coat etc.
Maintenance of road from AN Road to Kawamara Barma Tilla Road via Netaji colony From Ch.0.00 to Ch.0.700 (L-0.700 km) during the year 2023-24.SH-Rcc Drain, Surface drain, Metalling, Grouting, Re-Carpeting with paver machine , Seal coat, Side shoulder
Maintenance of road from AN Road to Kawamara Barma Tilla Road via Netaji colony From ch.0.700km to ch.1.700Km (L-1.000 km) during the year 2023-24.SH-Rcc Drain, Metalling, Grouting, Re-Carpeting with paver machine , Seal coat, Side shouldering and ot
Mtc of road Startng from NH 08 to D D Stadium, Kabiraj Tilla within the AMC Ward no 44 during the year 2022 23 Development of both end of Echa bazar Level crossing SH Earth filling and providing soling, metalling, Carpetting, grouting, paver bloc
Sankarpalli road near Satish Saha house L-0.06 km, Hospita road to Arjun Das house L-0.100 km, AT road to AT road via Cop. office L-0.800 km during the year 2022-23 SH-Metalling, Carpeting with Paver Machine, sand seal coat and allied works.
SH-Metalling, Re-Carpeting (with Paver Machine) sand seal coat and allied works.
WBM-II and III (Stone aggregate), Carpeting using Paver finisher and other allied works.
Mahadebkum road to kalacherra (Padmadhepa) within the jurisdiction of Santirbazar Division PWD(RandB) under the scheme for Spacial Assistance to State for Capital Expenditure 2020-21, Part-I
Stone grouting, Patch metalling (Jhama Brick), Re-carpeting using Paver Machine, Traffic signs and markings and other allied works.
SH-WBM, Soling, Throughout Re-carpeting (with paver finisher), grouting, sand seal coating, Kutcha drains etc. during the year 2021-22.(2nd call)
SH-Removal of Soil, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works, paver Bock etc. during the year 2026-27 (Gr-I)
SH-Removal of Soil, Missing Soling, Repairs of Potholes, Unlined Surface Drain, Palasiding Works,paver Bock etc. during the year 2026-27 (Gr-II)
Bituminous concrete, metalling, GSB, laying of paver and construction of RCC road side cover drain including road markings and sign boards during the year 2025-26. (Under RIDF-XXXI of NABARD).
Excess soil removal, Missing soling, Surface drains, Stone grouting, Patch metalling (Jhama Brick), Tack coat using hot bitumen, Re-carpeting using mechanical means (Paver finisher), Brick masonry drains, Box culvert, Traffic signs and markings .....
in_c preventive maintenance by servicing oiling greasing etc at Santir Bazar under Mechanical Sub_Division Udaipur Gomati Tripura during the year 2022_23
4.7 m Rubberised Inflatable Boat (Rescue boats) Average Turn Over of Last 3 Years 50 Lakh (s) Experience with Gov. Required 2 Year (s) 4.7 M Rubberised Inflatable Boat (Rescue Boats) ( 10 ) Technical Specifications * As per GeM Category Specification ... be interlocking type ...
4.7 m Rubberised Inflatable Boat (Rescue boats) Average Turn Over of Last 3 Years 50 Lakh (s) Experience with Gov. Required 2 Year (s) 4.7 M Rubberised Inflatable Boat (Rescue Boats) ( 30 ) Technical Specifications * As per GeM Category Specification ... be interlocking type ...