Loading…
Loading…
4,960 results • Best match
Construction of CC Drain and CC Road and PVC Pipe line from D.No.19-1-220 to 19-1-16 & 19-203 to 19-209 and D.NO.19-1-117 to Electrical Pole 12-p-3-2-3 & 19-2-346 to Existing CC Road near Bandimetta in ward No.3 (2nd call)
Punganur Municipality-GGMP funds-2022-23-HIWID No:MAUD-1010-24763-Theruveedhi-02(21010007)-Laying of 110 mm dia PVC Pipe line from D.No:15-71/5-2 to D.No:15-71-61 and from D.No:15-71/5-1 to main pipe line at Therumanu thota street in ward No:20(2nd Call)
Punganur Municipality-GGMP funds-2022-23-HIWID No:MAUD-1010-24763-Theruveedhi-02(21010007)-Laying of 110 mm dia PVC Pipe line from D.No:15-71/5-2 to D.No:15-71-61 and from D.No:15-71/5-1 to main pipe line at Therumanu thota street in ward No:20(3rd Call)
Providing HDPE Pipe lines from (1) D.No.5-8-10, P Subramanyam house to D.No.5-8-6, Modini Someswara Rao house, Jagareddy vari street, (2) D.No.5-7-14, Kongara Krishna house to D.No.5-9-36, Palakurthi Manga Ratnam house,Maganti vari veedhi and un covered areas in 8th ward in Peddapuram Municipality. under 15th FC Grant
Providing 110mm dia HDPE pipe line Geddam Apparao street D.No.20-29-24 to 20-07-03/1 Babuji mattam veedhi D.No.20-27-13 to 20-26-07/7 Devi Kalyanamandapam D.No.20-27-01 to 20-26-02 Cancer Hospital road D.No.19-05-14/3 to 19-05-9/1 in 36th Division. (RESERVED)
Maintenance and Improvements of 110mm dia HDPE pipe lines from a) D No:6-2-5 to D No:6-2-3 at Jain Street and B) D No:7-8-4 to D No:7-8-3/A at Tirupatamma Temple back side road in Ward No:36 of Tenali Municipality Under 14th Finanace Commission grant (2019-20)
Replacement of existing damaged PVC pipeline with 110 mm dia 6 Kg/Sq cm HDPE pipe line at College Road in 8th ward, SC Colony, Near Poleramma Temple, Near MPUP School in Gubanapalli in 23rd Ward, SC Colony, Gollala Doddi, Near Ex-councillor house in Dodagatta in 1&2nd ward under 14th finance Commission Basic Grant 2018-19
Providing of 110mm dia HDPE Pipe line from a) Rafi Bhai Khichidi Point D.No:7-76 to Sk.Ibrahim House D.No:7-43 b) Basha house D.No:7-5 to Pathipati Babu Rao House D.No:7-6 and C) Surakula Srinu House D.No:7-2 to Gorila Bazar at D.No:7-88 in 13th ward Under General Fund.
Replacement of existing damaged PVC pipeline with 110 mm dia 6 Kg/Sq cm HDPE pipe line at College Road in 8th ward, SC Colony, Near Poleramma Temple, Near MPUP School in Gubanapalli in 23rd Ward, SC Colony, Gollala Doddi, Near Ex-councillor house in Dodagatta in 1&2nd ward under 14th finance Commission Basic Grant 2018-19
Providing HDPE Pipe lines from (1) D.No.5-8-10, P Subramanyam house to D.No.5-8-6, Modini Someswara Rao house, Jagareddy vari street, (2) D.No.5-7-14, Kongara Krishna house to D.No.5-9-36, Palakurthi Manga Ratnam house,Maganti vari veedhi and un covered areas in 8th ward in Peddapuram Municipality. under 15th FC Grant
Laying of 110 mm dia HDPE pipe line from D.No. 76/101-3-3-P-18 to D.No. 76/97-439-12 at L.Venkaiah Nagar, Elec.Pole No. YL-1/A-13 to Ulchala Road (Yelukur Bungalow), D.No. 126/6-84-15 to D.No. 126/9-100-P-26-27 at A.Nagalapuram village in Kurnool Municipal Corporation.
Laying of 110mm dia HDPE Pipe lines from 1) D.No. 38/1786 to D.No. 38/1788-1 2) D.No. E-24-210 TO D.NO. 38/1490-1, 3) D.No. 38/1759 to D.No. 38/1769, 4) D.No. E-34-370 to D.No. 38/1744, 5) D.No. 38/1264 to 3/1236-5 at Electrical Colony in Division No. 15
Proddatur Municipality - Laying of 110mm dia HDPE Pipe Line from D No 26/954-9 to 26/954-3-10-4-2-20, from D No 26/954-3-10-2-20 to 26/954-3-10-2-26 and from D No 26/954-12 to D No.26/954-17 in Mittamadi Street in 29th Election ward
Supply and fixing of 20Watts AC LED sets and 60watts AC LED sets including all fixing accessories 4mmx25mm MS flat 9.1 size clamp sets and 1" and 1'1/4' GI pipe B-class of length 4feet with 2.5" size including 3/20 aluminium wire of 5mts for connecting for set at Tailors colony in Division no. 32 in Nellore Municipal Corporation.
Repairs & Reconditioning of 30 HP DVD and 60 HP DVD Pump sets at DP station in Jakkampudi housing colony and 40 HP DVD pump set DP station at HB colony and replacement of 600mm dia Damaged CI pipe line at Old DP station near Vechicle depot and rubber Tyres mounting at Clarifier bridge in 8 MGD & 11 M GD filtration plants in Head water works in Circle-I area
Drilling of bore well and supply and fixing of 5 H.P submerisble motor pumpset and 50mm GI pipes at Anjaneya gutta in ward No.10 in Nagari Municipality
Camera, NVR, HDD, Switch, BOX, RJ Connector, CAT Cable, Rack, PVC Pipe, Conduit Pipe, UPS, ITC
Laying of New 80mm GI pipe line two borewells interconnection at Chowdeswari Nagar area in 33rd ward in madanapalle municipality
Supply and delivery of 20W street lights , MS Clamps Sets, GI Pipe for Maintenance of Street lighting in Yemmiganur Municipality
Providing Interconnection at D.No. 58/298-6 to 58/292-2 (Taj Katta ) 58/384 near Akkadevatala Gudi 58/384-3-6 to 58/384-3-16 near Chowtapalli Road & D.NO. 59/7, Back side of Ambhabhavani Temple in 47th Division and PVC Pipe line laying in Chinnamachupalli 50th Division of Kadapa Municipal Corporation
Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School east side in Division No.23
Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School east side in Division No.23
Repairs and Rewinding of 215 HP motor at 11 MGD clear water pump house in Head water works and 25 HP M.B motor at Ramarajya nagar (up) booster, 20 HP M.B motor at uppara vagu Booster and Fabrication, Erection and laying of 250mm dia MS pipe line for 40HP DVD Pump set no.2 at H.B Colony DP Station
Supply of Glass Fibre Reinforced Plastic (GRP) pipes and fittings, Erection and Installation (E&C). The E&C includes collection of materials, Laying, joining by own supplied joining materials, fitting of Valves, RCC supports and its fittings, required GRP bends, Fasteners, Gaskets, etc., and hydro testing of complete GRP piping with complete system to ensure to meet performance guarantee of system as per the drawings and standards ISO 23856: 2021 This work includes Material, Labour, consumables, T&P etc. during the year 2024-25
Laying of 160 mm dia HDPE Pipe Lines at 4th Ward, 9th ward and 23rd Wards in Repalle Municipality
SUPPLY OF UDYOGI MAKE POLYAMIDE (NYLON) ROPE OF 12 MM DIAMETER FOR TYING OF HOT WATER PVC PIPES TO BEAMS TO REPLACE DAMAGED SS STRAP
263604400003, 260904400011, 262608400001, 262605400033, 262602400012, 262604400005
MATRIX IP BASED DARK FIGHTER MOTORIZED BULLET CAMERA MODEL IBR50MVL12CWP, 2MP PTZ CAMERA, MATRIX NETWORK VIDEO RECORDER MODEL NVR X SERIES 3204X, WD OR SEAGATE 08TB SURVEILLANCE HARD DISK, DLINK CAT6 UTP NETWORKING CABLE WITH PVC PIPES CLAMPS, 6 CORE ... INCH HDPE PIPE , ... AND PVC PIPE , ... OF HDPE PIPE , ...
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Maintenance and Improvements of 110mm dia HDPE pipe lines from various places from D.no 7-29-35 to 7-17-4 at Gadavarthi Subbaiah street,D.no 7-11-8 to 7-19-10 at Anjaneya pantulu street,D.no 7-23-55 to 7-24-8/2 at Tadiboina Sri Ram street in 35th ward of Tenali Municipality.Under 14th Finanace Commission grant 2019-2020.
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of Balance BT Road For SVN Colony Main Road from Sri Venkateswara Swamy temple to Taraka Rama Nagar Main Road & Laying of 200mm Dia HDPE Pipe Line For Shifting of old AC Pipe Line,RCC Pipe Line in Middle of SVN Colony Main Road Venkateswara Swamy Temple to Taraka Rama Nagar Main Road in Div.No.42 of Guntur Municipal Corporation
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Laying of 110mm dia HDPE Pipe line from : i) D.No. 14-138 to D.No. 1-22a ii) Municipal Borewell at Mallli palli road to E.Pole.No C/6. iii) Old Society building to MPUP School. iv) GI Pipelien from E.Pole.No.E/6 to E.Pole.No.A/7 Ward No.s 04 & 05 in Kalyanadurgam Municipality under 15th Finance Commission Grant for the year 2020-21 (Tied 1st Installment)
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Providing 160 mm & 110 mm HDPE Pipe Line in Mothey Vari thota 7th Road and 8th Cross Road, Ramakrishnapuram from APSB Office to Near Ramalayam Temple, at Komma Ramachandra Rao House to Mutlakoneru, Ammeena peta from Yettigattu Road to old Gas Gowdown, Patebada Near Vinayaka Temple, SMR Nagar, Lankapeta Main 4th cross Road, & Sivagopala Puram Near GangaNamma Temple Road in 2 Town area.
Laying of 110mmd ia HDPE Pipe line from D.No. 43/116-3 to D.No. 43/113-16, 2) D.No. 43/114-14 to D.No 43/114-3-4-1 3) D.No. 43/92-1-3-1 to D. No. 43/92-1-1, 4) D.No. 43/113-1 to D.No. 43/116-4 at Prakash Nagar in Division No. 14
Maintenance and Improvements of 110mm dia HDPE pipe lines from various places from D.no 7-29-35 to 7-17-4 at Gadavarthi Subbaiah street,D.no 7-11-8 to 7-19-10 at Anjaneya pantulu street,D.no 7-23-55 to 7-24-8/2 at Tadiboina Sri Ram street in 35th ward of Tenali Municipality.Under 14th Finanace Commission grant 2019-2020.
Providing CC Drain & RCC Culvert from Hanuman Temple to SR Residency & D.NO.119 to Rama Sai Residency, Laying of 110 mm dia PVC Pipe Line west side of Influence Showroom street, Providing CC Drains east side of Sri Achalananda Trust and from D.No.36-72-197 to existing MM Road (via Harithavanam) in Division No.35 (5th call)
Laying of 110 mm & 160 mm dia PVC Pipe Line from Ongole Dairy Milk Parlour to Venkateswara (H) at Ganuga Palem, Basha Glass Work to Notice Shop, Moulali (H) to Sathyam Handlooms & Srinivasa Footwear to Srinu (H) at Kotavari Veedhi, Providing CC Road & CC Drain beside Kotavari Veedhi School east side in Division No.23 (3rd call)