Loading…
Loading…
2,442 results • Best match
CC drain and drain pits laying of PVC pipes
74.30.05.247.5, 74.30.05.072.5, 74.30.05.213.5, 74.30.05.289.5, 74.30.05.245.5, 74.30.05.075.5, 74.42.05.071.5, 74.42.05.134.7, 74.42.05.053.5, 74.42.05.089.5, 74.42.05.156.5, 74.42.05.086.5, 74.42.05.043.5, 74.30.05.049.5, 74.30.05.015.5, 74.30.05.114.5
74.29.39.003.5, 74.30.05.904.5, 74.30.05.902.5, 74.30.03.470.5, 74.30.03.072.5, 74.30.05.906.5, 74.30.03.220.5
74.36.03.684.5, 74.36.23.018.5, 74.36.23.028.5, 74.36.23.032.5, 74.36.23.038.5, 74.36.23.060.5, 74.36.23.066.5, 74.36.23.075.5, 74.36.24.006.5, 74.36.24.007.5, 74.36.24.008.5, 74.36.24.009.5, 74.36.24.010.5, 74.36.24.011.5
74.29.32.260.5, 74.30.05.288.5, 74.29.32.829.5, 74.30.04.287.7, 74.30.05.334.5
Deposit work CWSS to Nattika Fika Nattika Mattupuram SC Colony water connection Interconnecting with 400mm Premo pipe and Laying 75mm snd 50mm PVC pipe under Thalikulam Block Panchayath for the Project year 2021 22
O and M Water Supply Schemes ARWSS to Kilimanoor Pazhayakunninmel and MadavoorVillages--Disposal of wash water from Erattachira WTP to the Side drain by laying 160mm pvc pipe General Civil Work
DEPOSIT CSME Laying 63mm PVC pipe for providing water connection to Crystal Empire flat at Panorama residency road Kumaranassan nagar Road in Kochi Corporation Div 54 (old Div 37) Pipeline Work
DEPOSIT-DW/CSME/AGD-Providing water supply arrangements to Sri.Anil Mathew Mangalassery and two others by laying 63mm PVC pipe in Madanbi Govt. High school Road in Alangad Panchayath-Pipeline Work
Deposit work Vithura Grama Panchayath 2021-22(Annual Scheme) CWSS to Vithura and Tholicode Extension of pipe line using 63mm pvc pipe at Thoppil Karikkakom Pottikkunnu road in Vithura Grama Panchayath.
Deposit work of Kollam Corporation-Laying 90mm PVC Pipe line from Pallimukku to Samsam Nagar and Interconnecting with 200mm AC Pipe at Pump Jn in Kayyalakkal Ward-35 of Kollam Corporation
Deposit-Replacing the existing AC pipe line with 90mm PVC pipe and shifting of house connections to newly laid pipe at Kodiyilmukku to Chembakaasseril kadavu in Division 20 of Karunagappally Municippality
AMRUT 2 Cherthala Municipality Supply and laying 90 mm PVC pipe providing balance FHTC 500 Nos and replacing damaged AC line and allied works in Cherthala Municipality Phase 3 Pipeline Work
DEPOSIT WORK - 2021-22 - THRIKKUNNAPPUZHA GRAMA PANCHAYAT - INTERCONNECTING 90 MM PVC PIPE FROM METHAN PARAMBU TO ANDOLI PARAMBU FOR SOLVING WATER SCARCITY IN ANDOLI PARAMBU IN WARD 3 OF THRIKKUNNAPPUZHA PANCHAYAT
Deposit work Vithura Grama Panchayath 2021-22(Annual Scheme) CWSS to Vithura and Tholicode Extension of pipe line using 63mm pvc pipe at Chayam Kshethra-nada road in Vithura Grama Panchayath.
Deposit work Replacing damaged 50mm PVC pipe with 75mm PVC at Puli nagar road providing water supply arrangements to Unichira manathupadam bylane varsha lane in ward no 29 of Kalamassery municipality
DEPOSIT WORK 2020 - 21 - THRIKKUNNAPUZHA GRAMA PANCHAYAT - PIPE LINE EXTENSION FROM VAALEL KADAVU TO THEKKETHARA AREA USING 90 MM PVC PIPE FOR SOLVING WATER SCARCITY IN WARD XI OF THRIKKUNNAPUZHA PANCHAYAT
DRW 2020 WSS to Anjarakandy Peralassery adjoining Panchayaths Gap connection work with 75mm 8Kg cm2 PVC pipe for a length of 250mm in Kadamkunnu Edakkandypeedika road Ward VII in Kadirur Panchayath
DEPOSIT-KOCHI CORPORATIONReplacing old and damaged existing GI/PVC pipelines with new 63mm PVC pipe (6kg/cm2) on Various roads in Kochi orporation Division no. 55 (old 28) and allied works
JJM work -Chendamangalam Panchayath- 2021-2022 -Pipe line Extention 63mm PVC pipe (6kg/cm2)-60m in Kottayilkovilakam Ferry PWD road - ward No. 9 of Chendamangalm Panchayathfor providing 7nos FHTC under JJM
Deposit work providing water supply arrangemets by providing 160mm pvc pipe line from university colony ration shop junction to road behind St John church Kundattukavu road ward 21 of Kalamassery municipality
Deposit work of Kollam Corporation -Extention of 90/63 mm PVC Pipe line in Saravana nager,Eravipuram nagar,Illam nagar,Chethana nagar various places of Division no-39 at Eravipuram area
Deposit work - Thirvananthapuram Jilla Panchayath 2020 - 2021 - RWSS to Kulathur Grama Panchayath 63 mm pvc pipe line extension and providing new street fountain from Mavilakadvu to Avanikinvila and Kondotty sub road.
Deposit Work KIIFB 2016 17 Renovation of Mattannur Irikkur road Replacement of KWA pipe line along Mattannur Mannur bridge laying 160mm PVC pipe from Ch 0m to ch 320m Balance work
DEPOSIT WORK 2021-22 - CHINGOLI GRAMA PANCHAYAT- PIPE LINE EXTENSION USING 90 MM PVC PIPE FROM VEMBUZHA- COIR SOCIETY ROAD TO ROADCHIRA VISHAKA BHAVANAM IN WARD NO.13 OF CHINGOLI PANCHAYAT.
Deposit work- CSME- Extension of 90mm pvc pipe line from east of polytechnic to south for providing water supply connection to Sri Sebastian John Park View bungalowCMC-16 in Cherthala Municipality
DRW 2019 WSS to Anjarakandy Peralassery and adjoining Panchayaths Pipe line extension to Aranganathparamba Kannanmukku road in ward X of Eranholi panchayath with 90mm PVC pipe for a length of 200m
DEPOSIT Laying 63mm PVC pipe as CSME along service road of NH for providing water connection for Holiday Inn at Kochi Coprpration Division No 33 old pipe line work Pipeline Work
Jal Jeevan Mission (JJM)-Providing Functional House Hold Tap Connection in Chekkiad Grama Panchayath-Supplying Laying Testing and Commissioning of 450mm HDPE/MS Pipe near Vishnumangalam Weir for Mahe River crossing work
O and M- WaterSupplySchemes-JICCA Assisted water supply scheme in Cherthala municipality and adjoining villages-Replacing damaged 400mm MS pipe across a culvert near Mukkannan kavala in Vayalar panchayath- General Civil Work
OandM - Water Supply schemes-Emergency fund - Njarakkal Panchayath -Laying 75 mm HDPE Pipe for solving severe water shortage at Manjanakkad - Odampilly area in Ward No. 8 and 9 of Njarakkal Grama Panchayath-Pipeline Work
RWSS to Sooranadu South providing FHTC, PVC pipe line extension, supply and erection of pumpsets, installation of bulk water meter etc. in Sooranadu South Grama panchayath Package-2
Jal Jeevan Mission -Karakulam Grama Panchayath-JJM - Karakulam GP- Replacing the fully corroded 300mm dia ms pipe, damaged CI valves and NR Valves at Clear water pump house in Kummy WTP -Pipeline Work-1
DW Urban Agglomeration Project Laying 110 mm PVC pipe for improving water supply at Mulavukad North End Lying 90 63 mm PVC Pipes at various wards in Mulavukad Panchayath Supply and erection and commissioning of clear water pump set at Panambukad
DW KC Interconnection between 300mm CI pipe at Panampilly nagar main Avenue road and 100mm AC pipe at Thoundayil road by laying 160mm PVC pipe 6kg cm2 at Panampilly nagar 4th cross road in Dvn 39 old of Kochi Corporation
Depposit work 2019 2020 ARWSS to Edakkattuvayal and adjoining Panchayath.Replacing old and damaged pamping main 125mm GI pipe from Pazhoor to Puthukkulam Nirappu with 150mm DI k9 pipe in Peppathippara road ch 15 900 to 16 680
Deposit work -2019-20- Shornur Municipality- Pipeline extension and Relaying of the existing pipe at Ward 4 ( PVJB School Road, SK Nagar, Kalliyad Road ) and Ward11 - Nambram Mini Scheme- Relaying 50mm GI pipe From Excisting 63mm PVC
DEPOSIT KDP Ranni Block Panchayath 2024 25 Project No 172 23 WSS to Makkappuzha Providing New water connections Shifting of existing water connections existing Gi pipe line block and leak rectification Fixing valves in Makkapuzha Panavelikkuzhi road
DEPOSIT-Replacing of 150mm GI pipe in O o n n u k a l - K e n d r a v i d h y l a m r o a d Chenneerkara -near Nehru Library
Deposit work- RWSS to Perinadu Grama Panchayath - Pipe line extension with 63 mm PVC(6kg/cm2) at Chuzhuvanchira vayal area(ward13) and at Vettilil (Chirakkonam, ward 7) under passage area by replacing the old damaged GI pipe.
Replacing Corroded GI pipe distribution lines from Tanks above the buildings for staff Quarters Type III 5 to 16 ,Principal Quarters and LDC Quarters and Providing Polyethylene water tanks for dining hall at JNV ,Mayannur ,Thrissur ,District
NABARD RIDF XXIV CRWSS to Nedumbram Niranam Kadapra and Peringara Panchayaths Phase II Laying Distribution system in Niranam and Kadapra Part Panchayaths Fabricating 350 mm MS Pipe for bridge crossing in Kadapra Panchayath
DEPOSIT Kochi Corporation Replacing old damaged pipes in drainage and laying new 63mm PVC pipe in Vadhyar road Mythree lane and bye lane in div 64 (new) 37 (old) of Kochi corporation
Deposit Work 2021-22 - Alappuzha Jilla Panchayath -RWSS to Champakulam - 90 mm PVC pipe line extension from Onnamkara Settlement Colony 24 to West of Onnamkara Bridge of ward 05 in Champakulam panchyath.
MLA-SDF-Kalamassery LAC-Extension of Pipe line for improving water supply to Kongorpilly Junction and EMS Road area by laying 90mm PVC pipe in ward-15 of Alangad Panchayath -Pipeline Work
Deposit work of Thiruvananthapuram Corporation Project No S0070 21 Laying 110 mm PVC pipe and alteration of house connection from newly laid JNNRUM Lane in Archana Nagar top portion in Ulloor Ward
Deposit work - M/s IRE (India) Ltd - CWSS to Oachira, Karunagappally, Alappad and Clappana - Shifting of 75 mm PVC pipe line at Yogeeswaran mining site near Vellanathuruthu Subrahmanyaswami Temple in Alappad Panchayat.
KDP Dist Pancahayath 20_21 _RWSS to Mylapra Replacing damaged 150mm AC pipe with 140 mm 110 mm PVC pipe from Kumbazhavadakku Junction to Nalkkalipady in ward No 8 of Mylapra Grama Panchayath
KIIFB 16 17 KWA Utility shifting of WSS to West Eleri KRFB Construction of bridge at Kalikkadavu across Chaithravahini river in Kasaragod District Relying 90mm PVC pipe through approch road Pipeline Works
DEPOSIT-GIDA-W.S.S to N.Paravur municipality and adjoining panchayaths -Relaying the 90 mm PVC pipe after completing the bridge work at Chathanad side of Valiyakadamakudy -Chathanad bridge of Ezhikkara Panchayath-Pipeline Work